To provide a construction method of an underwater foundation of which center-of-gravity position can be adjusted so that it becomes a stable floating body while being towed, without unnecessarily increasing the weight of a sidewall and a...
|
|
JP2011236657 |
To provide an earthquake proof reinforced structure that when a revetment structure is built by installing a revetment sheet wall for soft grounds including a liquefaction layer, can reduce settlement at time of earthquake, obtain the le...
|
|
JP2011236705 |
To effectively suppress floating of piles during an earthquake.A region of a foundation portion of a building 2 is excavated in advance, and a ground improvement body 3 is constructed to a predetermined depth in the whole area of a prede...
|
|
JP2011236665 |
To provide a support for an anchor plate by which workability in supporting the anchor plate on a form is improved and usable positions and the shape of anchor plate are not limited.A support for anchor plate comprises: a base part 3 mou...
|
|
JP2011231607 |
To provide a pile foundation formation technique for ground reinforcement for soft ground by using of wing metal piles in order to reduce the weight of piles and vibration/noise during pile construction.While a wing receiving pile 10 hav...
|
|
JP2011231538 |
To provide an oblique penetration type tip expansion anchor having steel bar branches for a structure surface on the ground side of a structure in contact with ground, the structure surface that cannot be reinforced by a steel plate, and...
|
|
JP2011231519 |
To provide a reinforcement method with excellent workability, improving the load bearing capacity of underwater structures by mutually connecting piles of the existing underwater structures via reinforcement bodies in water to enhance ri...
|
|
JP2011231537 |
To provide an umbrella-shaped tip expansion anchor for aseismatic reinforcement, the tip expansion anchor capable of exerting a holding force onto a surface on the ground side of a structure in contact with ground, the structure that can...
|
|
JP2011231574 |
To prevent a connection slab around a pile head from cracking and to prevent the pile head from breaking even if a bending moment and the shear force are applied to the pile head.The structure in which a pedestal column 5 reinforced with...
|
|
JP2011226254 |
To reduce cost by eliminating waste of a soil improvement part and also to realize a simple and compact structure.The device comprises: main drilling revolving shafts 2 with three axes which are set in parallel to each other; main drilli...
|
|
JP2011226066 |
To install a base isolation device in a normal position of layout accurately and firmly.A temporary plate with an anchor member 8 is positioned and installed in a normal position of the upper face of a foundation, and concrete is injecte...
|
|
JP2011226111 |
To provide a construction method which is excellent in workability for increasing load bearing ability of an underwater structure by connecting piles of the underwater structure together using a reinforcement body in water to enhance the...
|
|
JP2011226203 |
To provide a pile head cap capable of maintaining the bearing power of a bearing pile by eliminating the need for processing for storing a subterranean heat piping to the bearing pile becomes unnecessary, and storing the subterranean hea...
|
|
JP2011226098 |
To provide a joint structure, of a precast concrete pile and a floor slab, in which the precast concrete pile can be used as a column for supporting the floor slab.In a structure 10, a precast concrete pile 12 and a floor slab 14 are joi...
|
|
JP2011226174 |
To provide a foundation structure for steel column base part excelling in workability, and capable of more effectively preventing the occurrence of corn shape destruction etc.The foundation structure 1 for steel column base part comprise...
|
|
JP2011226248 |
To provide a termite prevention structure and termite prevention method manifesting a better termite prevention effect.A nonwoven fabric 5 impregnated with chemicals is constructed on a foundation 2, an electric wire 29, a cable 30 and/o...
|
|
JP2011226200 |
To provide a foundation structure in which termites are effectively exterminated by using a small amount of termite prevention agent as far as possible in a building having an upper structure which does not use wood as a main material fo...
|
|
JP2011220010 |
To provide a simply configured foundation structure suitable to supporting a structure that is supported by the base.The foundation structure, in replace of conventional foundation structures, includes: a plurality of base-isolating mech...
|
|
JP2011220095 |
To be able to not only prevent the lift of a foundation pile by reducing a pull-out force to the foundation pile caused by an earthquake but also reduce costs.The frame includes: a foundation beam 2 for supporting a structure 10 provided...
|
|
JP2011220108 |
To provide an embankment construction method on a soft ground with improved strength and toughness performance and the embankment structure thereof.In an embankment construction method on a soft ground, beam members 5 of which bending ri...
|
|
JP2011219993 |
To provide a ground improvement spread foundation construction method allowing a user to continuously use a building even in a case of uneven settlement of an improvement wall itself by adjusting unevenness using a jack-up while improvin...
|
|
JP2011220073 |
To provide a pile head junction technique which does not require welding operation on an application site, facilitate construction, improves working efficiency, and enables building of a firm pile head junction structure for a high-tough...
|
|
JP2011220088 |
To use only natural materials in order to build an excellent resource saving healthy dwelling house; and to achieve forest conservation and reduction in the unit price of dwelling house by making effective use of a thinning material.Simp...
|
|
JP2011219992 |
To provide a ground improvement spread foundation construction method allowing a user to continuously use a building even in a case of uneven settlement of an improvement wall itself by adjusting unevenness using a jack-up while preventi...
|
|
JP2011219987 |
To provide a ground driving member with drainage function and construction method thereof, a underground wall and plug protection components.A ground driving member's main body 6 with drainage function has a drainage member 5 forming a d...
|
|
JP2011214290 |
To provide a method for the construction of a base concrete structure for a building, along with a base concrete structure for a building, in which the high fluidity of concrete is maintained stably for a long period of time even if temp...
|
|
JP2011213529 |
To provide a method for constructing a basic concrete structure for building which can keep stable and high flowability for a long time even when a temperature condition in the construction is varied and has excellent handleability, and ...
|
|
JP2011207667 |
To provide a method for constructing a foundation concrete structure for buildings which has both a good constructing property and excellent hardened body characteristics and where the occurrence of initial cracks on the foundation concr...
|
|
JP2011208478 |
To provide a simple and inexpensive base isolation method intended for an existing building with a mat foundation.In the base isolation method of the existing building 1 constructed on the mat foundation 12, a space 14 for a beam is form...
|
|
JP2011208360 |
To provide a ground stabilizing method for stably holding a structure by pressure-injecting substance other than soil into foundation soil of a structure to reinforce the foundation soil.The method for improving or lift-supporting suppor...
|
|
JP2011202387 |
To provide a reinforcing structure which enables base concrete with an opening, made in reform or termite prevention work etc., to be effectively reinforced following a small number of construction procedures without needing a bed-sill.I...
|
|
JP2011202372 |
To provide a coupled structure of a foundation pile, which prevents settlement of a foundation and a structure on the foundation, cause by an decrease in the strength of the whole pile after construction, by making a breakage such as a c...
|
|
JP2011202459 |
To provide a structure and a method, which can inexpensively and effectively reinforce a reinforced concrete deck slab supported on foundation piles.On the upper surface 2a of the reinforced concrete deck slab 2 supported on the foundati...
|
|
JP2011196053 |
To provide a method of injecting grout which can prevent the quality of the grout from being lowered due to the injection thereof, in water, into the gap between a foundation pile and a part to be mounted, which can reduce a construction...
|
|
JP2011196131 |
To provide an earthquake-proof laminated pile foundation structure having excellent deformation performance and a method of construction thereof.The foundation structure includes a laminated pile (10) comprising a plurality of pile secti...
|
|
JP2011196173 |
To provide a pile arranging method that can enhance an improving effect in pile type improvement.An X axis and a Y axis intersecting on a plane are set, and a plurality of piles 2 arranged in m-rows with center distances d1 in an X axis ...
|
|
JP2011190645 |
To provide a structure for a liquefaction countermeasure, which exerts both the effect of suppressing shear deformation caused by an underground wall and a restraining effect brought about under the weight of a structure, and which hardl...
|
|
JP2011190590 |
To improve a flaking prevention function of the periphery of an anchor section comprising an anchor hole and an anchor bolt.An anchor hole 42, which undergoes the insertion of the anchor bolt 41 for fixing a building unit onto a foundati...
|
|
JP2011184950 |
To provide a slide foundation structure which has a high seismic force reducing effect while significantly reducing an excavation cost, a seismic layer construction cost, a base isolation device cost, and the like.The slide foundation st...
|
|
JP2011184882 |
To solve the problem that an increase in cost and a decrease in design efficiency are caused by execution of sufficient strengthening work in a conventional construction method for seismically strengthening a foundation by using an addit...
|
|
JP2011184927 |
To provide a reinforcing structure capable of easily and effectively reinforcing a foundation which is made of plain concrete and includes joint parts of substantially L-letter, T-letter and cross shapes in cross section.The reinforcing ...
|
|
JP2011184954 |
To provide a construction method for arranging a pile head tension anchor reinforcement at a position where it never contacts with the main reinforcement of a foundation beam without being affected by construction errors of a cast-in-pla...
|
|
JP2011179213 |
To provide a foundation structure using an inexpensive concrete block which makes a construction period short and which can be easily transported and installed by man power.The foundation structure 10 makes equipment A for a building sup...
|
|
JP2011179283 |
To provide a jet agitation device enabling improvement of the ground immediately under an existing structure easily, in a short time, and without incurring high cost.The jet agitation device includes: a drilling rod 2 comprising an outer...
|
|
JP2011179175 |
To provide a prestressed concrete well capable of efficiently constructing a high quality bridge, and also provide a method of constructing a bridge.This prestressed concrete well includes a cylindrical prestressed concrete well body 21 ...
|
|
JP2011174290 |
To provide an extremely simple foundation structure of a building without damaging an underground drain pipe etc. by screwing a steel pipe pile into the ground.The foundation structure of the building includes a steel plate 1 laid on the...
|
|
JP2011173202 |
To install a setting object without using anchor bolts.The upper surface of a concrete foundation 1 is subjected to joint cutting along the installation position of a base plate 16. Concrete nails 6 are used for underlay-resin-mortar lev...
|
|
JP2011174274 |
To provide a fitting for a building foundation and a building foundation structure, which reduce the vibration of a pillar and improve the earthquake resistance of a building.A screw cylinder 22 is mounted movably upward and downward to ...
|
|
JP2011168975 |
To provide a seismic strengthening method for a structure, which can apply seismic strengthening to the structure for bearing at least an earth pressure load from a back side, such as an abutment and a retaining wall.A hole 8, which hori...
|
|
JP2011163073 |
To surely execute adjustment for the inclination of a flat foundation due to its unequal sinking, and prevent the inclination of the flat foundation in a temporary receiving state by making the front end of the lowermost reinforcement pi...
|