Document |
Document Title |
JP2001235098A |
To ensure simplification of an execution work process and reliability for a long period.The storage facilities in a base rock are provided with a pressure proof buffer material 14 set up to an inner surface side of a cavity part 12 forme...
|
JP2001512806A |
The invention described is a system for seismic isolation or vibration of structures which is simple, relatively inexpensive and readily used for smaller structures. It involves use of bearings comprising a ball (10) and ball seats (12, ...
|
JP2001226999A |
To allow a vibration shielding wall, comprising a single wall body, to demonstrate a sufficient vibration shielding effect while the vibration shielding wall is constructed at a large depth without requiring discharge of sediment, indepe...
|
JP2001226998A |
To allow a vibration shielding wall, comprising a single wall body, to demonstrate a sufficient vibration shielding effect while the vibration shielding wall is constructed at a large depth without requiring discharge of sediment, indepe...
|
JP2001226997A |
To provide a vibration control construction as well as a damping pile for a vibration propagation path ground wherein excavation is easily performed while a damping material is easily and safely installed.There are provided a vibration c...
|
JP2001227058A |
To form a building having earthquake-resistance, fire-resistance and wind-endurance.In the inner area of a panel, in a substantially plane of a framework, there are provided an enforcing means for enforcing at least one of framework memb...
|
JP3201600B2 |
To efficiently drain underground water or the like and hold a stable ground by joining a permeable porous body on a part of the outer wall face of a reflection board. A foaming resin base board or a foaming resin concrete base board 2 is...
|
JP3199866B2 |
PURPOSE: To provide an underground external wall having a sufficient water- proof effect and easy construction. CONSTITUTION: An underground external wall is provided with a concrete wall 11 supported by the frames 20 of the underground ...
|
JP2001212838A |
To provide a method for manufacturing a self-adhesive waterproof sheet in an unvulcanized state for the waterproofing work for a concrete surface.A method for manufacturing the self-adhesive waterproof sheet in the unvulcanized state has...
|
JP3195512B2 |
PURPOSE: To provide a structure constructed on the ground through a foundation, in which the natural vibration period of an upper structure to the foundation is made longer, and large earthquake motion can be prevented from being transmi...
|
JP2001207598A |
To provide a waterproofing construction method enabling a urethane coated film waterproofing material to be laminated without requiring a long time for a primer to cure after being applied.The primer containing (a) an isocyanate group te...
|
JP2001207465A |
To economically reduce a negative frictional force.A reinforced concrete structure 10 is built on a soft ground 10, thereafter backfilling is carried out on the outer periphery at the lower side of the structure 10, and a backfilling sed...
|
JP2001200548A |
To strengthen the adhesive force of a waterproof layer and a post-cast concrete layer in a forward waterproof method for the wall surface of the underground structure. A wall surface 101 of a landslide protection wall 100 is covered with...
|
JP3189885B2 |
To greatly reduce stress due the occurrence of earthquake for the whole of a pole from its head to tip by providing a cushion material layer around the peripheral surface of the pile body. The whole peripheral surface of a pile body is c...
|
JP3184018B2 |
PURPOSE: To continuously attach a corrosionproof sheet to enhance a productivity and to perform trimming with high accuracy by a method wherein the corrosionproof sheet is attached by rolls, an end part of the corrosionproof sheet projec...
|
JP3183989B2 |
PURPOSE: To manufacture a long-life barrier by making it contain soluble basic salt, which buffers an aqueous phase of a composition at a specified pH or above for a specified long period, and activated carbon. CONSTITUTION: A compositio...
|
JP2001182496A |
To provide a water leakage measure of a tunnel capable of carrying out work regardless of traffic in the tunnel and expecting a long term effect but not temporary repairing of water leakage. A plural number of injection holes 3 are drill...
|
JP2001182051A |
To provide a base isolation underground continuous wall, and a base isolation construction method and a base-isolated building using the base isolation underground continuous wall. This base isolation underground continuous wall to be us...
|
JP2001181015A |
To provide an industrial method and an apparatus for forming a high-concentration polymer film, capable of forming a waterproof layer securing excellent adhesion even when an objective material is in a wet state, preventing swelling and ...
|
JP2001181013A |
To provide a method and an apparatus for forming a permeable inorganic crystal layer, feedable under pressure by a pump, having no fear of causing sag when sprayed upon an objective material by compressed air. This apparatus comprises a ...
|
JP2001173143A |
To provide a constitutive groundsill which is effective for lateral deflection during earthquake or the like at soft ground where liquefaction phenomenon occurs easily in foundation work, groundsill constitution and floor framing constit...
|
JP2001164565A |
To provide a stress dispersing pile capable of preventing an connection face between the head of the pile and a structure thereon from being destroyed when the structure is subjected to a horizontal force in an earthquake by solving a pr...
|
JP3178319B2 |
To build a reliable water barrier layer economically. For example, a propulsion machine having at least two units of propulsion apparatuses connected by a grooving steel plate is advanced under the ground from a starting base A which is ...
|
JP2001159136A |
To provide a waterproof construction method of an earth-retaining wall surface, by which a waterproof layer having sufficient bonding power, by which there is no possibility of the generation of peeling and slipping-down, to the earth-re...
|
JP2001152475A |
To provide a covering corrosion-proof cover for an offshore steel structure whose condition of the substrates and the steel structure as a core member can be observed from the outside by using plastic protection members having transparen...
|
JP2001152476A |
To provide an aseismic ground capable of obtaining a sufficient earth quake resistance for an existing underground structure in a narrow construction work irrespective of the use condition of the structure.The aseismic ground is provided...
|
JP2001152463A |
To provide an artificial foundation capable of maintaining vibration isolation efficiency even when there are variations in additional construction of building or extension and alteration of building.An artificial foundation 10 is consti...
|
JP3172964B2 |
PURPOSE: To provide a connection method of an electrode for electrolytic protection of the steel members in concrete capable of easily, surely and firmly installing the electrode without requiring a boring operation in the bottom of an e...
|
JP2001132003A |
To provide repair wall construction of the existing underground structure, capable of completely waterproofing a wall in a basement or the like of the existing building, and at the same time, improving its earthquake resistance. Repair w...
|
JP3160659B2 |
To effectively cope with a disaster under the maintenance of a community system by creating artificial base-isolated subsoil using a street zone divided into a range large enough to form a row of houses as one unit, and constructing a de...
|
JP3160692B2 |
PURPOSE: To prevent vibration and sound waves from the steel side being the bone of a landslide protection wall from being penetrated in the underground outer wall of a building after propagation of the vibration and sound waves through ...
|
JP3161252B2 |
PURPOSE: To enhance reliability and maintain definitely and stably earthquake resistance for a long period by installing a seismic base isolation layer of a hardened substance which is a silicon composition into a clearance between a lin...
|
JP2001115378A |
To obtain a waterproof sheet good in fitness to a rugged surface on which it is laid and scarcely causing a laceration due to apically angled materials on the laid surface. This waterproof sheet is woven by using polyester yarns comprisi...
|
JP2001098574A |
To provide vibration reducing treated earth capable of preventing deformation of the ground to the possible minimum level while restraining vibration generated in a railway track and a road from propagating to the adjacent ground. Vibrat...
|
JP3154156B2 |
PURPOSE: To prevent floating of an underground structure and to reduce costs by placing upper soil on a widened bottom portion formed in the lower portion of the underground structure, the dead load of the upper soil being greater than t...
|
JP2001089839A |
To provide a corrosion preventive structure of a steel structure and a corrosion preventing method in which the operation can easily and inexpensively be executed while maintaining its corrosion resistance over a superlong period, in a c...
|
JP2001081800A |
To provide corrosion-resistant structure of a steel structure capable of being easily executed at a low cost while maintaining corrosion resistance for a very long period of time and a corrosion-resistant method in a corrosion- resistant...
|
JP2001503829A |
A ground surface (10, 77, 142) especially for transport surfaces, pathways, industrial and trade areas, horticultural and agricultural surfaces, whose surface (10, 77, 142) superstructure (13-16, 55-60, 99-102) contains at leat one barri...
|
JP3145669B2 |
To prevent ground vibration acting to an outer pipe from being transmitted to a structure through an inner pipe by closing a double pipe air gap with an elastic material, and supporting a vertical load with a support structure at an inne...
|
JP2001059232A |
To prevent a beam member from being subjected to an excessive vertical earth pressure by forming a number of through holes in the flange of a beam member buried in the underground composed of non-adhesive sand and gravel and making the s...
|
JP3139963B2 |
To isolate the vibration of a structure, by installing the bottom face of a structure on a supporting ground and forming a crevice between the side face of the structure and the ground surrounding it and installing an impervious wall at ...
|
JP2001049683A |
To absorb and disperse the vibration of ground by a base isolation layer due to an earthquake, and prevent the breakage of a tunnel by covering the whole outer peripheral face of the tunnel constructed underground by the base isolation l...
|
JP3134003B2 |
PURPOSE: To obtain a slope collapse detecting device which can detect the collapse of a slope formed along a railway or road due to a heavy rain, etc., and the scale of the collapse. CONSTITUTION: A detection fence 20 is installed on a s...
|
JP3133913B2 |
PURPOSE: To execute a water proofing work with no pollution caused, and concurrently prevent a water proofing layer from being damaged and peeled off by placed concrete, back filling material and the like produced when an underground str...
|
JP2001032270A |
To economically discharge the underground water without using any ready-made tank by forming an underground drain connecting chamber by a plurality of steel pipes in steel pipes forming a steel-pipe column wall. A water storage tank part...
|
JP2001031948A |
To obtain an agent that can penetrate and fill e.g. crazes causing water leak to prevent water from penetrating into them by mixing a dispersion prepared by dispersing a highly water-absorbing polymer in a dispersion medium essentially c...
|
JP3130275B2 |
To provide a method for executing a spraying and waterproofing work to prevent discharge of ammonia gas and perform a safe and comfortable work when an anion rubber asphalt emulsion and an ammonia salt water solution are simultaneously s...
|
JP2001026977A |
To separate a lining layer from a building in disassembling and recycle a concrete structure by forming an RFR lining layer by use of a reinforced fiber in the construction of the concrete structure.In construction, a resin anticorrosive...
|
JP2001026991A |
To provide a ventilation panel capable of ensuring ventilation by a simple structure, being attached simply, and being manufactured inexpensively.This windbreak structure is applied on a building having a foundation 10, a groundsill 30 p...
|
JP2001021189A |
To obtain a system and a method for removing moisture from high temperature high humidity atmosphere (air) being supplied to an underground storage facility from the outside by condensing moisture without requiring such an air conditione...
|