Login| Sign Up| Help| Contact|

Patent Searching and Data


Matches 1,051 - 1,100 out of 14,941

Document Document Title
JP2014062363
To provide a steel pipe pile that can have the base protected to sufficient strength and secure high reliability in a clay layer and a gravel layer, and a construction method thereof.A cap (13) having an insertion hole (13A) is fixed to ...  
JP2014062398
To provide a liquefaction countermeasure construction method for preventing liquefaction of an entire liquefaction countermeasure zone including a block area surrounded by roads by implementing reduction of a groundwater level step by st...  
JP2014058843
To enable highly accurate construction of a CB mortar solidified wall even at a site having a narrow facility yard for a bentonite stabilizing liquid plant.In an excavation method using a bentonite stabilizing liquid: a used bentonite st...  
JP2014058798
To provide a foundation structure for a solar cell panel frame which has sufficient load resistance, can be flexibly designed so as to deal with various solar cell module designs and is capable of compressing a construction period and co...  
JP2014059066
To provide a device capable of recovering a push-in tool such as a weight for use in arranging a heat exchange tube within a precast pile, re-utilizing it and further installing the heat exchange tube at a prescribed depth position withi...  
JP2014055463
To provide a collecting device for a sample in soil, capable of collecting a sample not only at a tip of an earth auger but also at an intermediate position of a drilling rod.A collecting device for a sample in soil is provided on an ear...  
JP2014051780
To provide a connection structure between a steel pipe and a foundation of a building structure, which can firmly fix the foundation of a building structure to a foundation steel pipe erected in a ground, and by which the foundation of t...  
JP2014051869
To provide a plug for water conduction capable of preventing a filter from damaging and also preventing fine particles of viscous soil from sticking on the filter.A plug for water conduction includes a plug body 6a, and a filter 7 and a ...  
JP2014051843
To improve recyclability of a steel pipe sheet pile by providing a novel steel pipe sheet pile joint structure.A first joint part (male-type joint part) of a steel pipe sheet pile includes a stud part 11 that is a shaft-like engage part,...  
JP2014051821
To provide a combined steel wall with steel pipes at pitches such as to reduce the stress of steel sheet piles generated near middles between the adjacent steel pipes, develop the effects of combination with the steel pipes, and secure t...  
JP2014051866
To provide a steel material with drainage function by which a filter is hardly clogged at the time of installation of the steel material in a foundation and by which gap water can be surely discharged from the upper part at the time of l...  
JP2014051868
To provide a plug for water conduction capable of preventing a filter from peeling or breaking.A plug for water conduction includes a plug body 6a having a through hole 6d penetrating in an axial direction and a filter 7 provided in the ...  
JP2014051820
To provide a combined steel wall capable of developing the effects of combination with steel pipes, and securing the safety and soundness of a wall body while avoiding steel sheet piles from yielding over the extension of the wall body.A...  
JP2014051867
To provide a steel material with drainage function capable of preventing peeling and breakage of a filter.A draining member 3 is installed in a steel material 2 and a plug 16 for steel material having a filter 7 is fitted to a plurality ...  
JP2014047534
To provide an apparatus which enables recovery and reuse of a weight used for placing a heat exchange tube in a precast pile, and can set the heat exchange tube at a designated depth in the precast pile.An apparatus of this invention ins...  
JP2014047475
To facilitate a work for mounting an object to be supported or connection elements on a plurality of base structures, and to improve workability thereof.A finished structure is constructed on a ground by: a plurality of base structures 1...  
JP2014047514
To provide a ready-made pile capable of securing vertical bearing resistance even when concrete of a pile body is destructed.A surface of a concrete pile body 2 is coated with a resin reinforcement coat 3. The reinforcement coat 3 is a c...  
JP2014047560
To reduce labor and costs for joining a pile and concrete together, while increasing transmission strength of a structure for joining the pile and the concrete together.A joint jig 1 is used to join a pile head part of a pile 20 to concr...  
JP2014047531
To provide a sampling device for a filler sample in a bored hole that has a simple structure, is easily mounted on an excavation head for pile insertion hole formation, and does not increase in excavation resistance.A sampling device for...  
JP2014040736
To enhance an end bearing capacity of a core material erected in a soil improvement body to support a structure, to improve workability by reducing resistance when the core material is erected in the soil improvement body, and to improve...  
JP2014037713
To provide a steel product with drainage function capable of preventing damage to water jet hoses when pulling the water jet hoses off after constructing the steel product with drainage function.In a steel product 2, a draining member 3 ...  
JP2014037699
To provide a cut-off structure and a cut-off method for a sheet pile joint part, which can reliably bring a section between sheet piles into a cut-off state.A cut-off structure for a sheet pile joint part 12 in a location, in which steel...  
JP2014037679
To provide a water channel capable of decreasing a speed of water flowing down on a channel bed.A water channel includes: a concrete floor slab 1 that is provided in a covering manner on a surface of ground G; a plurality of roughness el...  
JP2014037712
To provide a steel product with a drainage function capable of sufficiently developing drainage effects.In a steel product 2, a draining member 3 forming a drain channel 4 is provided along the longitudinal direction of the steel product...  
JP2014034806
To provide a spiral pile propulsion auxiliary means and a spiral pile propulsion method in which the spiral pile can be advanced at a low cost and easily even in the ground in which obstacles exist and in which the spiral pile capable of...  
JP2014031634
To provide a method capable of collecting a cover in a distal end of a stirring rod.According to the method, a stirring rod in which a stirring blade is mounted around a hollow tube is used. While discharging a solidification material, t...  
JP2014031700
To provide a base structure which enables elimination of bulkiness, improved stability at the time of being placed and weight saving so as to achieve improved handleability and cost reduction and to hardly cause frost heave problem; and ...  
JP2014031914
To provide a method for burying heat exchange pipe of underground heat, and a propeller for burying capable of efficiently lowering a heat exchange pipe even when there is an obstacle such as a lump of mud in a pile hole.A pile hole 42 i...  
JP2014031622
To surely present a supporting strength in tight contact with a solidified foot protection liquid over entire surfaces of protrusions of a precast pile inside of a foot protection part.A bottom-end precast pile 1 to be used includes annu...  
JP2014031706
To make it possible to conduct work for liquefaction countermeasure in a narrow place between an existing structure such as an existing detached house and a neighboring house silently and at a low price.A foundation 12 immediately below ...  
JP2014031717
To provide a joint structure which makes two steel pipe piles serially and mechanically coupled together by fitting and pinning inner and outer joint pipes fixed to corresponding end surfaces of the steel pipe piles by welding.An outer j...  
JP2014029062
To provide a construction method of a soil cement continuous wall with which increase in the quantity of mud can be suppressed by preventing cement milk of an injection material from being increased considerably, even in the case of cons...  
JP2014029076
To provide an anchor in which steel wires in the anchor buried in a ground can be cut at a give position and the cut steel wires can be removed.In an anchor member 10, a second diameter part 20 is provided with a diameter-expansion space...  
JP2014029102
To provide a landslide prevention pile and a construction method for the same capable of reliably stabilizing the ground while enhancing a landscape at a low cost.In the ground 10, a landslide prevention pile 1 is buried through a mobile...  
JP2014025329
To provide a ready mixed concrete pressurizing apparatus for a pile hole in which ready mixed concrete flowing into the vicinity of a pile head to be an upper side of the pile hole is pressurized towards an inner circumferential wall sur...  
JP2014025255
To construct a foundation pile at low cost while securing a sufficient support strength by the foundation pile.A foundation pile is constituted by successively implementing: a first step of plunging a pipe body 2 in which a rotary blade ...  
JP2014025245
To provide a pipe pile capable of reaching a bearing layer of a ground because another pipe pile can be easily added to it, having no possibility of breakage of the pipe pile during construction work, and low in cost as a whole, and a co...  
JP2014020116
To provide a pile concrete placing method capable of securing the maximum vertical accuracy of an underground piled column when placing a pile concrete after erecting the underground piled column.An underground piled column 1 is previous...  
JP2014020079
To provide a slope reinforcing structure in which a shallow slide and a deep-seated landslide of a slope can be prevented.A mold is formed from a band-like sheet bundle obtained by joining band-like sheets 11A, 11B which are neighboring ...  
JP2014020144
To provide an establishment method of a press-in continuous wall with which a continuous wall can be constructed efficiently and at a low cost.A continuous wall is constructed by forming a plurality of pile bodies Gp while using a pile p...  
JP2014020017
To provide a pile head structure capable of improving workability and increasing horizontal bearing capacity of a pile.In a pile head structure 1, an outer pipe 4 is installed at an outer peripheral side of an upper portion of a tubular ...  
JP2014020129
To enable a construction cost to be reduced, in constructing a wall body having a corner, bent or curved section, by constructing the same using only one type of steel sheet piles, to enable the cost and labor required for fabrication by...  
JP2014015826
To provide a foundation assembly which can be constructed easily by absorbing positional displacement between a supported object and a foundation structure in three axial directions and mounting a pole or the like of the supported object...  
JP2014015773
To effectively reinforce rigidity and strength of an entire steel pipe by efficiently introducing prestress into concrete while combining a steel pipe member with the concrete.A concrete filled steel pipe structure comprises: a steel pip...  
JP2014015786
To provide a cast-in-place concrete pile and a construction method for the same capable of: reducing an amount of excavated soil, to be carried out of a site, by using pre-packed concrete; and preventing decline in bending capacity and s...  
JP2014015812
To enable airtightness of an anchorage zone of a PC steel wire or a PC steel wire strand to be secured by easy construction.There is provided a method for sealing an anchorage zone by filling a filler such as shrinkage-compensating morta...  
JP2014009455
To provide an inexpensive anchor construction method that facilitates construction, and a drilling jig.An anchor construction method includes: a drilling step of drilling a hole Ca in an object C; an anchor fixing step of fixing an ancho...  
JP2014009440
To provide a steel pipe pile, which is used for reinforcing the ground or a foundation of a structure and modifying an inclination of an existing foundation and can be pressed into the ground while injecting mortar therein, capable of be...  
JP2014009577
To provide an earth retaining sheet pile 13 in which a steel sheet pile 15 and a sheet pile 16 of an easy-to-cut member are connected together by a small connection part 14 with high strength.In an earth retaining sheet pile 13, a steel ...  
JP2014009454
To provide an inexpensive anchor construction method that facilitates construction, and a drilling jig.An anchor construction method includes: a first drilling step of drilling a first hole Ca in an object C; a second drilling step of dr...  

Matches 1,051 - 1,100 out of 14,941