Login| Sign Up| Help| Contact|

Patent Searching and Data


Matches 1,601 - 1,650 out of 33,636

Document Document Title
JP6579512B2  
JP6579945B2  
JP2019157475A
To provide a water-stopping structure that can improve the water-stopping performance of a tensile material such as an elongate material (for example, a steel stranded wire or a steel bar) on which tension is applied in a ground anchor w...  
JP2019157417A
To provide cutoff steel members allowing a cutoff wall construction with compensation function for wide and/or narrow spacing and with a stiffer structure.A cutoff steel member 1 in a H-section steel shape is provided with: an upstream s...  
JP2019157476A
To provide a ground anchor head protection and maintenance mechanism capable of easily observing the state of the ground anchor while reliably preventing corrosion at the ground anchor head.A ground anchor head protection and maintenance...  
JP2019157615A
To provide an auxiliary tool for fixing foundation piles and a method for fixing foundation piles that can align foundation piles easily and quickly to fix them in accurate positions, and that can shorten a construction period.An auxilia...  
JP2019157400A
To provide an earth retaining wall and like with high rigidity which can be easily constructed.An earth retaining wall 1 is constructed in the ground 3 to resist lateral pressure from the ground 3. In the earth retaining wall 1, soil cem...  
JP2019157349A
To provide an easily constructable wall body.A wall body 1 comprises steel pipes 13 with lower parts buried underground and upper parts protruded from the ground, upper lids 15 and lower lids 17 closing upper ends and lower ends of the s...  
JP2019526723A
[Subject] A cable fixing implement that installation is easier and safer is provided. [Means for Solution] The present invention relates to a cable fixing implement provided with at least one tube part (6) which stores a thin long elemen...  
JP6576230B2  
JP6576088B2  
JP6575553B2  
JP6577004B2  
JP6577093B1
[Subject] Joint structure of a steel pipe pile where connection intensity of a steel pipe pile can be guaranteed is provided. [Means for Solution] The 1st joint that hits an inside upper end of an inside cylinder-like outer ring part, fo...  
JP2019151990A
To provide a foundation pile capable of performing a strength test without generating vibration pollution and its construction method.A foundation pile 1 inserted into a previously excavated pile hole has: a steel pipe foundation pile bo...  
JP2019152083A
To provide a steel pipe foundation pile in which upper and lower steel pipe piles are securely united by means of accurate work and inspection for welded areas regarding a joint part of steel pipe piles subject to jack-up press-in type s...  
JP6573468B2  
JP6573491B2  
JP2019148105A
To provide a gap obturator used in a micropile construction method capable of efficiently performing pressure injection of a grout material in the final process of the micropile construction method, and the micropile construction method ...  
JP2019148070A
To provide a construction method of an underground structure that can make a construction period shorter.A construction method comprises: a first step of constructing an adit 2 and a glory hole 12 extending upward from an adit in the soi...  
JP6569171B2  
JP6569160B1
[Subject] The present invention indicated a cast-in-place beam-denominated construction method. [Means for Solution] As for the concrete pile driver device, fixed installation of the rise-and-fall electrical machinery 101 is carried out ...  
JP6572030B2  
JP6569317B2  
JP6569560B2  
JP6569248B2  
JP6570435B2  
JP6569161B1
[Subject] The present invention indicated an automation cast-in-place beam-denominated construction method. [Means for Solution] As for the concrete pile driver device, fixed installation of the rise-and-fall electrical machinery 101 is ...  
JP6570973B2  
JP2019143449A
To provide a foundation structure for a platform door with a simple configuration for installing a door unit on a platform formed by banking to which the loading weight is strictly limited.A foundation structure of a platform door for in...  
JP2019143314A
To provide an alignment method of bearing plates on a construction site, which eliminates welding to welder the bearing plate on a pile head pipe, allows a concrete skeleton to be thinner, ensures high bending strength of a coupler throu...  
JP2019143447A
To provide a base-isolated building including a heat exchange system and a base isolation repair method for foundation that can use underground heat without preparing steel pipes dedicated to heat exchange.The present invention includes ...  
JP6565335B2  
JP6567327B2  
JP6567350B2  
JP6567793B1
[Subject] While making unnecessary welding operation in a stake construction site, without being based on bolt joining structure, securable pile steel pipe joining structure is easily provided for intensity of a joined part. [Means for S...  
JP6566233B1
An execution method of a stake which makes it possible to heighten bearing power of a stake certainly is provided. It is an execution method of a stake provided with a process of giving vibration by a vibratory hammer and driving in a st...  
JP2019138091A
To provide a burying device and a burying method for an environmentally friendly pipe anchor in which working on a pipe anchor can be done at a minimum limit and that can provide for sufficient propulsive force toward underground without...  
JP2019138093A
To provide a steel sheet pile including a joint part that can reduce wear of the neck lower portion of the join part so that it can be applied to a temporary steel sheet pile installed underground repeatedly.In a steel sheet pile accordi...  
JP2019135353A
To provide an installing method of an under-ground piled column using a prefabricated pile that allows an under-ground piled column connected to the prefabricated pile to be installed with high vertical accuracy.An installing method of a...  
JP6561104B2  
JP6558684B2  
JP6560922B2  
JP2019132109A
To suppress movement of a pile and suppress inclination of a house, even when a part of the ground collapses.A house foundation structure 10 includes a plurality of piles 12 driven into the ground 11, an annular frame 13 which is connect...  
JP2019132115A
To provide a screw-in type steel pipe pile which prevents an adverse effect in a bearing power, does not affect an increase in a manufacturing cost and an adjacent screw-in type steel pipe pile, and is excellent in workability in a hard ...  
JP2019131990A
To provide a permanent sub-structural column erection method capable of erecting a permanent sub-structural column in a cast-in-place pile in a short time with precision when constructing a building using an inverted construction method....  
JP2019522129A
According to the present invention, it sets to the waveform Grout bulb (100) for subterranean bearing power reservation of micropyle (10), Along the length direction of the cylindrical pillar section (110) prolonged downward, multiple pr...  
JP2019132103A
To provide a pile head joint member and a pile head joint structure which facilitate a welding work in a construction site, can shorten a welding work time, and exhibit an excellent bearing force.A pile heat joint structure 50 is formed ...  
JP2019131998A
To disclose an example of a reinforced concrete structure capable of exhibiting high rigidity and high yield strength when an excitation force such as an earthquake is applied.A plurality of second axial rebars 12 are arranged at positio...  
JP2019132117A
To provide a screw joint of a steel pipe which easily starts rotation and fitting and is excellent in fitting workability even in a multiple screw having three or more strip numbers.A screw joint 1 of a steel pipe is provided on the end ...  

Matches 1,601 - 1,650 out of 33,636