| Document |
Document Title |
|
JP2003314012 |
To constitute a roofing tile cutter for positioning and placing a plate surface of a roofing tile on a plate surface of a receiving base at an accurate angle according to a gradient angle of a roof to a cutting line by a straight line cu...
|
|
JP2003314014 |
To provide an inexpensive roofing tile nail cutting tool for cutting a nail for fixing a removed roofing tile without damaging a normal roofing tile and a normal fixing nail.This roofing tile nail cutting tool is characterized by having ...
|
|
JP3481174 |
To provide a solar battery module mounting frame offering good high-place workability while inhibiting the increasing number of processes, and a construction method using the solar battery module mounting frame. Hanging hooks 16, 16 are ...
|
|
JP3479496 |
To provide the facility device of a safety rope for works, in which there is no compulsoriness in a working posture even on a ladder, the sure and easy throw of a guide rope is devised and the safety rope such as a lifeline can be instal...
|
|
JP2003278325 |
To easily and surely install a newly constructed mounting metal fitting to an existing roof without hammering or driving the metal fitting and to minimize generation of dust during construction of the newly constructed roof.A driving for...
|
|
JP2003278341 |
To provide a drain pan retaining device for preventing a drain pan from being tilted forwards and downwards by the application of impact forces to a driven corner drain being temporarily secured to a concrete form, while also preventing ...
|
|
JP3473712 |
PURPOSE: To improve coating efficiency by mounting a roll of waterproof sheet material on a movable coating machine and applying adhesives to the waterproof sheet material, while the material is being drawn out. CONSTITUTION: An upper fr...
|
|
JP3469778 |
To safely operate a bolt holding jig by being provided with an abutment part being in contact with a building structure, a bolt holding part movably holding a bolt, a spring member energizing the bolt holding part by a spring, and a tens...
|
|
JP2003245724 |
To provide a manual groove forming tool which can form a groove at a joint end of a cylindrical member of a metallic sheet and can allow the simple drawing of the joint end.A body lower rod 2 having a groove-forming recess 6 in its front...
|
|
JP2003232109 |
To provide a guard net capable of ensuring the same free walking as a previous state without sliding the foot of an operator, and to provide a method in which the above-mentioned guard net can be installed easily.The guard nets 10 and 20...
|
|
JP2003193645 |
To provide a roof snow removing system which controls its snow removing arm so as to carry out roof removing action by applying a small force, reduces a load imposed from the snow to the arm, carries out the snow removing action over a w...
|
|
JP2003184247 |
To provide a snow removing instrument which is available in snow removing work carried out from below a roof, can very easily separate and remove snow on the roof without operation that imposes a burden on members of an eaves edge, and i...
|
|
JP2003176608 |
To solve the problem that normal roofing materials are stepped and broken when is a heavy weight carried in the case wherein correction work by placing a heavy weight is conducted when part of the roofing material is caused to lift at an...
|
|
JP2003170363 |
To provide a bend-forming tool capable of bending a long surface material formed of a sheet metal used for formed metal exterior wall material or metal roofing material to satisfactorily finish the appearance thereof by bending the area ...
|
|
JP2003161014 |
To provide a new method for positioning a waterproof connecting material in which the waterproof connecting material in a roofing structure in which plate tiles and the waterproof connecting materials are combined and roofed and piled up...
|
|
JP2003129614 |
To provide a roof material fixing device for overlapping roofing and a method therefor capable of facilitating the construction more than a conventional method without dropping dust indoors and being removed from an existing roof materia...
|
|
JP2003129629 |
To provide a slipping down prevention system for work on a roof capable of being installed and removed simply and quickly and usable even in local work on the roof by a simple configuration.This slipping down prevention system for work o...
|
|
JP2003119980 |
To provide a drain pan holding device capable of definitely preventing a tilt of the drain pan caused by an impact force applied to a drive type longitudinally drawn drainage in a state of temporary fixation to a concrete form.A drain pa...
|
|
JP2003119981 |
To make it possible to drop and flow accumulated snow from a high place and drop snow directly to the ground even from another roof upstairs.A turned rope 2 is fixed at a point 4 on a corrugated sheet 3. A non-slip board 1 is attached to...
|
|
JP3420554 |
To save labor while performing the construction of a long and heavy metallic roof member by human labor so as to reduce the work on a roof greatly. In a construction method for the roof for a large building, the roof is tiled by making t...
|
|
JP2003106311 |
To provide a plate fastening tool capable of safely and simply performing fastening work for stays of a corrugated sheet and flat sheet from a back side and being hard to have any regulation in use.A female band 13 and male band 13 are a...
|
|
JP2003105941 |
To provide a ruler capable of cutting a plate surface of a roofing tile at an angle corresponding to the pitch angle of the roof without requiring ruling work, by simply determining either the cut-in or cut-out side where the roofing til...
|
|
JP3416574 |
To provide a main rope support attaching construction for roof which can be also utilized for the maintenance work for the roof of a wooden building. A main rope support 1 equipped with a main rope linking portion 3 at the top end and an...
|
|
JP3415460 |
To provide a roof working load placing device capable of placing a load such as tile, other necessaries for roof working, tool or the like on a roof in a stable state. This roof working load placing device is so constituted that a pair o...
|
|
JP2003097002 |
To provide an eaves gutter cutting aid capable of accurately and easily cutting an eaves gutter.The eaves gutter cutting aid 1 has a detachable frame 9 for fitting a longitudinal portion of an eaves gutter 2 therein and is adapted for cu...
|
|
JP2003082828 |
To provide a structure in which a roof end section such as the edge of eaves, a verge or the like is executed efficiently.A placing surface A1, a spacing surface A2 in which one side end of the placing surface A1 is folded down and a hei...
|
|
JP2003082854 |
To provide a method for laying a waterproof sheet on a concrete surface, which performs a function of uniformizing an overlapping width of the waterproof sheets, produces no wrinkles in the laid waterproof sheet, forms no air bubbles bet...
|
|
JP3408135 |
To provide a fence for roof work which is arranged on a roof in a roof work site and used as a handrail. A plurality of outer tubes 15 forming legs 16 are installed in the inner tubes 11 of a fence for roof work 10. The legs 16 are exten...
|
|
JP2003074158 |
To simplify the execution work and eliminate the generation of rubbish by improving the main body of a roof drain to be used in a deck plate method.A coupling means for connecting a roof drain main body 1 to a drive metal fittings 5 is c...
|
|
JP2003064836 |
To solve problems such as freezing, a high running cost, and a high equipment cost in a conventional processing method for handling accumulated snow and solve problems such as operation difficulties on a roof having a complicated structu...
|
|
JP2003056184 |
To provide a guard fence support capable of easily and rapidly supporting a guard fence. This guard fence support mounted to the eaves of a roof to support the guard fence is provided with a body part having a lower face engaging part en...
|
|
JP3400572 |
PURPOSE: To easily mount a safety strip by forming a fixed section to the inside of a ridge tile, and providing a safety strip metal fixture consisting of safety strip mounting sections extended along slope of roof tiles between a ridge ...
|
|
JP2003041764 |
To provide an inexpensive positioning tape for architectural external facing easier in positioning than a method by inking, having the high working efficiency, and easy in manufacture. A tape uses paper as a base material. This positioni...
|
|
JP2003013536 |
To provide a deck roof structure and roof unit for forming a substantially horizontal roof face while providing a water gradient.A deck roof is constituted by connecting two or more roof units 61 each having a slab 62 supported on a fram...
|
|
JP2003013573 |
To provide an equipment inspection deck on a slate roof and its construction method for easily and surely attaching it to the vicinity of various equipment arranged on a slate roof and safely performing work such as maintenance, inspecti...
|
|
JP2003003614 |
To equalize a finished surface, to shorten an execution time and to reinforce a bonded surface while reducing the quantity of a pasty rubber by devising a ridge model for simply and distinctly explaining tile-roof reinforcement by a foam...
|
|
JP2003003633 |
To provide an FRP roof board mounting apparatus which can mount a commercially available FRP roof board which is difficult to work with, has a large dimensional tolerance in a short side direction thereof due to the shape and structure t...
|
|
JP3383287 |
To provide a ruler for locating a roof light window, which enables the suitable setting of a position wherein the roof light window is laid on the roof. This ruler is used to locate the position wherein the roof light window (5) is laid ...
|
|
JP2002349034 |
To enhance safety and increase working efficiency of an electric carriage which helps transport sheathing roof boards of a steep-sloped roof part concerning roofing works of a building. The electric carriage is made up of an engagement m...
|
|
JP2002339531 |
To provide a method for fixing an instrument to be embedded in concrete, which facilitates separation of the instrument embedded in the concrete, such as drain main body, a cover receiving frame, etc., of a roof drain, from the concrete ...
|
|
JP2002327540 |
To provide safe structure and the like for work on a roof, easily formed without taking time and coping with even an existing object.A main rope 3 is stretched on the roof 1 by ropes 4 hung onto the edge 7 of the roof 1.
|
|
JP2002322779 |
To safely conduct a roof work without slipping of a worker.An upper supporting pipe 4 is arranged along the upper edge of a mat 1A which comprises a soft mat layer 2 capable of deforming corresponding to unevenness of a tile when stepped...
|
|
JP2002307381 |
To provide a cutting tool for eaves gutter and a cutting method for eaves gutter preventing eaves gutter from being cut obliquely during cutting the eaves gutter.This cutting tool 3 has a roughly same section shape as an eaves gutter joi...
|
|
JP2002276198 |
To provide a snow damage alleviating method which alleviates damage caused by collapse of enlarged snow hoods 2a, 2b being formed by sliding of snow accumulated on a roof in a roof sloping direction (indicated by an arrow S), and overhan...
|
|
JP2002256666 |
To fix a safety rope support-cum-an antenna guy fittings to a steel beam, to support antenna guy for parabola antenna before or after the exterior finishing work by using the safety rope support, and to safely carry out maintenance and i...
|
|
JP2002256667 |
To provide a power and heat generating type snow melting and removing machine supported on the shoulder capable of removing snow accumulated on the roof of a house or a factory with a slight labor and physical strength.A rotation motor (...
|
|
JP2002250106 |
To provide an execution method for a roof, by which the slipping of a worker or a tile on a tile roofing ground is prevented when a tile laying work is executed by temporarily arranging the tiles on the tile roofing ground.In the executi...
|
|
JP2002242399 |
To provide a roof snow falling machine tool for removing snow falling and accumulating on a roof.Both the ends of a rectangular thin plate are curved, a sliding body 1 forming a cross section in the form of a U-shape and both the ends of...
|
|
JP2002242400 |
To provide a roof snow removal tool capable of efficiently and surely removing snow accumulating on the eaves part of a roof from a position near under an eaves on ground even when a worker does not climb on the roof.An insertion plate 2...
|
|
JP2002242401 |
To eliminate a possibility of damaging a branch when removing snow from a garden tree due to the difficulty in handling since a shape of a conventional snow removing tool is large in resistance of snow, and is also heavy.A metal fitting ...
|