To provide a suspended scaffold construction method capable of reducing the number of cables for suspending a scaffold, and a device for construction.In a suspended scaffold construction method, assembly and integration is made by perfor...
|
JP2022182576A |
To provide a suspended scaffold construction method capable of reducing the number of cables for suspending a scaffold board, and a device for construction.A suspended scaffold construction method includes a preparation step of attaching...
|
JP7179924B2 |
To provide a suspended scaffold that can be efficiently placed even if placing a scaffold from the ground is difficult.From the side of an existing scaffold pivotably supporting each scaffold frame 10, the scaffold frames 10 are pivoted ...
|
JP7178908B2 |
To provide a temporary scaffolding in a tunnel, which has a simple structure and which makes it possible to ensure construction work of an auxiliary construction method at a relatively low cost.A temporary scaffolding in a tunnel accordi...
|
JP7175539B2 |
To provide a scaffold device capable of being installed wherever a reinforcement piece is positioned and preventing working efficiency from decreasing.A scaffold device 1 is installable around a formwork 3 for a concrete armour unit. The...
|
JP7161641B1 |
[Task] The present invention provides a suspended scaffolding device that facilitates storage and transportation of vertical beams even when the vertical beams are provided with hanging material brackets to which hanging materials can be...
|
JP7161381B2 |
To provide a protective net mounting device in a suspended scaffold for preventing a tool or the like from falling when connecting an additional scaffold to the end of an assembled scaffold.A lower scaffold and an upper scaffold having a...
|
JP7153823B1 |
INDUSTRIAL APPLICABILITY The present invention enables a gondola used in a crane for high-altitude work to be efficiently positioned at a desired position by threading between branches while removing obstructive branches, thereby prevent...
|
JP2022153207A |
To provide a fork type parking device having an inspection platform with a simple structure.A fork type parking device 1 includes a plurality of storage units 30 in which a fork type storage cart 72 is stored, and a hoistway 20 in which ...
|
JP2022543262A |
The monorail assembly includes a first scaffold system and at least one monorail beam including at least one framework member that is an elongated structure having a bottom chord and a plurality of panel points along the bottom chord. an...
|
JP2022148015A |
To provide a scaffold enabling safe lifting work of a lifting object.A scaffold 10 installed on an outer periphery of a structural member 2a that constitutes a structure 1, includes: a pair of first scaffold portions 20 projecting outwar...
|
JP7149094B2 |
To provide a construction method of a fireproof wall capable of executing construction work of a fireproof wall for a vertical hole section extending over a plurality of floors around an elevator shaft in parallel with building skeleton ...
|
JP2022542026A |
The present invention relates to an anchorage device for the type of self-climbing structure used on vertical and near-vertical concrete surfaces, which is provided with metal inserts in pre-fabricated concrete towers and with rotary and...
|
JP2022134534A |
To provide a mobile device support mechanism capable of improving rotation rigidity of a mobile body.A mobile device support mechanism according to an embodiment includes: a mobile body 10; a plurality of wires 20 extending in different ...
|
JP2022133675A |
To provide a jib crane device capable of improving conveyance efficiency of a permanent scaffold panel.A jib crane device 100 comprises a support 110 extending in a vertical direction, an arm part 140 rotatably attached to the support 11...
|
JP2022129921A |
To provide a lifting mechanism for a funnel-shaped protective shelf that allows the funnel-shaped protective shelf to be easily and safely installed in accordance with an installation state at the site.A lifting mechanism for moving up a...
|
JP2022127702A |
To propose a temporary scaffold that can easily place and remove an on-water structure when constructing the same and a construction method of the on-water structure using the temporary scaffold.A temporary scaffold placed on a batter pi...
|
JP7122080B2 |
To provide a temporary scaffold that can be easily attached to or detached from an architectural structure and is highly versatile.A temporary scaffold 10 is installed so as to surround an outer periphery of a column member 40 that has n...
|
JP7120747B2 |
To provide scaffolding materials for piers that can be used as scaffolding immediately after installation.The present invention comprises a detachable band portion 2 that is detachable from a support pile extending above a water surface ...
|
JP7116583B2 |
To provide a suspended scaffold for beam construction which is easily attached to and removed from a truss beam of a truss bridge, and can easily transport and store constituent members.A suspended scaffold for beam construction is chara...
|
JP7116832B1 |
[Task] SUMMARY OF THE INVENTION An object of the present invention is to provide a scaffolding device and a scaffolding device assembling method that can reduce the weight of the components that make up the scaffolding device, facilitate...
|
JP2022114750A |
To provide a connection structure between a beam forming an opening and a scaffold attachment hardware, which can release the opening without removing the scaffold attachment hardware and can perform fireproof covering work and boundary ...
|
JP7112146B1 |
To provide a movable and connected hanging scaffold that can be moved to a work site after ground setting is performed in a safe place and the scaffold is raised to a height work level by a lifting machine, and a method for using the sam...
|
JP2022108009A |
To provide a side wall panel for closing a side space of a scaffold board in a suspended scaffold.Side wall panels are arranged in a row in an erected state along an edge part of a scaffold board in a suspended scaffold, and adjacent sid...
|
JP2022101087A |
To provide a hanging scaffold having a side part scaffold which is lightweight and can be simply attached and in which sufficient lighting is possible, and to provide an attaching metal fitting used for the same.A hanging scaffold having...
|
JP2022101207A |
To provide an ascending/descending device for repairing a building which securely prevents rolling of an ascending/descending base with a simple and inexpensive configuration and which is advantageous in improving workability.In an ascen...
|
JP2022100094A |
To provide a work bench provided with a handrail frame pivoted on a working floor and rotatable between a standing position and a horizontal position, which avoids a situation in which the handrail frame cannot keep its standing position...
|
JP7094046B2 |
To solve the problem in which, by conventional scaffold support devices and support devices, it is difficult to support an upper end side of a scaffold suitably and improve the stability of the scaffold.A support device 10 of a scaffold ...
|
JP2022097028A |
To provide a support member for a temporary material that supports a work scaffold that also serves as spark curing, a fall prevention curing net, and other temporary materials in units of work layers, that is placed on the outdoor side ...
|
JP2022097091A |
To provide manufacturing method for installing a scaffold under an elevated structure with an excellent workability.A manufacturing method of a scaffold under an elevated structure comprises steps (1)-(3). (1) A delivering tool is fixed ...
|
JP3237888U |
To effectively solve the problem of material rotation transfer in a core tube, reduce the waste of human resources and material resources, and reduce the waste of human resources and material resources. It provides a standardized unloadi...
|
JP7082888B2 |
To propose a construction method of a tank bottom slab and a cradle for a bottom slab using therewith which allow a construction period to be reduced comparing to the prior art.A construction method of a tank bottom slab comprises: an ar...
|
JP7082260B2 |
To provide a guide rail for a moving body and a guide rail system facilitating attaching and detaching work by reducing the number of attachment metal fittings such as a bolt and the like as well as capable of reducing risk of accidents ...
|
JP2022083245A |
To provide a gondola facilitating maintenance and inspection work even for a cylindrical structure.A gondola is suspended by a wire rope and can be raised and lowered by winding/feeding the wire rope by a winch provided on an upper part ...
|
JP7076702B2 |
To provide a support device that can perform seismic base isolation by concurrently moving together with a base-isolated structure during an earthquake, without being affected by some dust and waste.In the present invention, a support de...
|
JP2022076527A |
To provide a temporary scaffold unit allowing easy work of a worker, and applicable to a vertical wall face.A temporary scaffold unit (1) is temporarily installed in an internal space of a facility from an opening (MH) provided on a wall...
|
JP2022070557A |
To shorten working time required for repairing a chimney.A chimney repair device is equipped with a gondola which can be raised and lowered inside a chimney and on which equipment and materials used for repair work can be mounted, and a ...
|
JP7066253B2 |
To reduce the construction period for a top level part of a blowing-through structure.In construction of a top level part of a blowing-through structure 1, a plurality of a pair of temporary columns 6, 6 are disposed so as to sandwich a ...
|
JP2022068727A |
To provide a scaffold device and an operation method on a roof allowing operation to be carried out safely and to be improved in spite of a simple structure upon the operation on the roof.A scaffold device 10 comprises: a scaffold board ...
|
JP3237295U |
To provide a climbing type construction work platform outside a building having a rational structure, convenient elevating and lowering, safe and reliable, and having good popularization value. A climbing type construction work platform ...
|
JP7058566B2 |
To provide a demolition method of a cylindrical structure capable of preventing adverse effect to peripheral environment and improving workability and safety when demolishing the cylindrical structure.A demolition method of a cylindrical...
|
JP7049812B2 |
To provide a hanging metal material which can be attached to and detached from a hanging side member made of a round pipe easily and effectively by little manpower.A hanging metal material 1 attached to a hanging side member 22 made of a...
|
JP7048003B2 |
To provide an external scaffolding for a narrow land used when working on a building to be built close to a neighboring house from outside.There is provided an up-and-down movable external scaffolding for a high-rise building comprising:...
|
JP7046328B1 |
To provide a lightweight suspended scaffold and a method for installing the scaffold. The suspended scaffold of the present invention has a rectangular first support portion, a rectangular second support portion which is foldable so that...
|
JP2022050735A |
To provide a suspended scaffolding that can improve work efficiency while minimizing the disadvantage to road users.A suspended scaffolding 1 suspended and supported by a pair of bridge girders 10, 10 facing each other comprises: a floor...
|
JP2022049293A |
To provide a scaffolding construction method, scaffolding structure, and scaffolding support material, and the like, for the lower side of an elevated structure that allows a scaffolding panel to be installed at a desired position even w...
|
JP7041892B2 |
To further improve safety in fiber reinforced resin corridors.A fiber reinforced resin corridor comprises: a main girder 1; braces 2 standing on both sides of the main girder 1; and handrails 3 attached to the braces 2. The main girder 1...
|
JP2022046320A |
To provide a scaffolding device that can be installed at a high place on the frame without waiting for the completion of the external scaffolding, allows workers to safely install and remove the scaffolding and can reduce finishing work....
|
JP7037106B2 |
To provide an inspection work bench allowing safe and efficient inspection work of a dust collector.An inspection work bench 10 of a dust collector of the present invention comprises a pair of detachable connection plates 12 mounted betw...
|
JP2022040662A |
To provide a temporary scaffold forming jig capable of dispersing the suppression of reaction force to a load of a temporary scaffold added to a support bracket and avoiding the deterioration of workability at the time of installation an...
|