Login| Sign Up| Help| Contact|

Patent Searching and Data


Matches 701 - 750 out of 2,138

Document Document Title
JP3520486
To provide an outside curing scaffold which is installed at the peripheral part of a building and replaceable upward in accordance with the progress of the construction on constructing the building, also the replacement method and the de...  
JP2004044155
To provide a self climbing movable scaffold capable of moving the whole movable scaffold together with a moving rail and being smoothly moved even if the movable scaffold is inclined when it is supported.The movable scaffold 6 moved by a...  
JP2004044376
To provide a circular nacelle apparatus capable of being easily transported on a narrow road, easily assembled and disassembled in a small site, allowing a load on a cylindrical steel tower itself to be minimized by reducing the number o...  
JP3519651
To provide a ladder for a suspended scaffold capable of securing the safety of a worker during his as cending and descending motion, capable of being retracted in the work, and folded without problem and provide the suspended scaffold fi...  
JP2004036091
To provide a climbing-type work unit which allows quick assembly and disassembly thereof, and to provide a unit frame.The climbing-type work unit is comprised of vertical supports 21 formed by arranging a plurality of support frames 30 e...  
JP2004027658
To make an advantage of construction by a slip form construction method effective without disturbing construction based on the slip form construction method by the installation of a temporary work scaffolding in installing the temporary ...  
JP2004019375
To provide an inserting connection pipe for assembling a suspended scaffold, requiring no components to be connected in vertical and lateral directions during assembling scaffold frames and no tool such as a monkey wrench, allowing easy ...  
JP2004011193
To propose a scaffold device for the inner-wall surface operation of a tower tank body conducting the inner-wall surface operation of a tower tank body safely with excellent workability and an inner-wall surface operation method using it...  
JP2004003246
To provide a scaffold and a scaffolding method, which satisfy conditions for scaffolding, such that the scaffolding, first of all, makes roofing work safe, can be easily built and enhances a working effect.This scaffolding are easily bui...  
JP2004003186
To provide a building structure that is economical on a long-term basis since the cost and period of performing repair work for an exterior wall or temporary work for the construction of a new exterior wall are reduced, while the efficie...  
JP3505900
To provide a scaffolding device for installation of an elevator capable of easily and temporarily setting a scaffold projected to the inside of an elevator shaft from the side of a platform regardless of a status of a deep wall of the el...  
JP2003343080
To provide a structure of a working platform as well as a technology facilitating the conveyance by a worker and quickly and safely performing repair work or the like. The working platform A comprises an locking frame body 5 having an ap...  
JP2003343081
To efficiently and rapidly install and remove scaffolding for maintenance inspection on the periphery of equipment such as a gas turbine unit 50. A base part 10 of a protective fence 3 for being coupled to the equipment side of a passage...  
JP2003343083
To provide an easy-to-handle wall-tie mounting fitting for scaffolding, which can be easily attached to a steel frame of a building and is prevented being bulky in transportation, storage and the like. This fitting 1 is equipped with scr...  
JP2003326390
To perform various operations on a tower inner wall under safer working environment, with improved workability and with high reliability.From a suspension supporting base 8 installed inside a tower 1, a suspended beam 9 is hangingly supp...  
JP3492940
To provide an elevating/lowering suspension frame along the outside of a steel tower. This frame 1 comprises four columnar members 2a-2d, first connection members 3a-3d and second connection members 4a-4d in a tower in a surrounding mann...  
JP3489447
To provide a deformable truss framing for a suspended scaffold excellent in work efficiency capable of being transferred with the transfer of a wall surface of a structure in a suspended state while keeping the suspended scaffold moved u...  
JP2003314054
To provide a temporary scaffold being lightweight owing to the use of existing treads as scaffold plates, while ensuring high security using corner scaffolds, and allowing even one worker to easily mount and remove it to and from column ...  
JP2003314055
To provide a repairing method without requiring construction work for temporary scaffolding, for the range of the outside of a building that is out of reach and usually requires construction work for temporary scaffolding.A working table...  
JP2003314053
To provide a working table for a large precast retaining wall enabling a very safe operation while increasing operating efficiency.The working table, which is removably attached to a large precast retaining wall having suspension jigs to...  
JP3488185
To provide a circular gondola device, which is assembled and disassembled easily in transport on a narrow road and at a narrow site, in which loading applied to cylindrical steel tower itself is reduced extremely by decreasing suspension...  
JP2003301601
To provide a self-propelling work unit capable of quickly executing upward movement work.An outer frame part 22 includes vertical members 24a, b, both the ends of each of which are connected to each of horizontal members 25a, b, and an i...  
JP3483119
To install an ancillary facility such as a work platform, a decorating, a lighting, a signboard, etc., easily onto a wall surface at the time of the execution of a curtain wall and at the time of maintenance by a DPG building constructio...  
JP3479667
To provide a scaffolding which can easily be installed from the tower side and which allows a worker to have easy access to the cable and safely and to perform a maintenance job safely in a stable condition. A suspension support 31 is pr...  
JP3477256
PURPOSE: To construct a passage between a temporary scaffold and a building frame by using an integrated scaffold structure. CONSTITUTION: A beam frame 10 is mounted on the side of a temporary scaffold 2 in such a way that the height of ...  
JP2003268968
To safely and surely deliver a material to a worker in a car gondola without using an outside elevator for work of a building structure and an inside elevator.The car gondola 1 is hung on a rooftop crane of the building structure 3, and ...  
JP3471332
To provide a temporary cargo-receiving stage capable of stably supporting building materials, and being easy to install and remove. The temporary cargo-receiving stage 1 comprises a cargo- receiving stand 10 for placing building material...  
JP2003247340
To solve such a problem that a conventional wall face suction type cleaning robot requires smoothness of an objective face and hence, there is restrictions in objective buildings applicable therefor, there is drawbacks in versatility, an...  
JP2003247339
To provide a panel for a suspended scaffolding in erection of which the panel can simply and rapidly be connected, which can simply and rapidly be removed, and which is increased in the degree of freedom of selection of suspending positi...  
JP2003239529
To provide a scaffold board support device for a veranda handrail enabling easy use when providing a scaffold board for work temporarily on an outer side of a veranda handrail wall of a building being constructed and stretching a curing ...  
JP2003239528
To provide a work scaffold and a method of using it capable of reducing the number of members and cost.A support base 20 is formed by one longitudinal column 40 and a horizontal bar 50 crossing the longitudinal column 40 orthogonally. A ...  
JP3463223
PURPOSE: To provide a scaffold in common use, which can be installed in any one of a fitting for corner and a fitting for flat surface freely to be disconnected of which fitting and removing work can be performed safely, securely and qui...  
JP2003232011
To provide an installation method for a working scaffold and a supporting jig used therefor capable of installing the working scaffold around a main girder at a low cost without impairing the external appearance of a bridge after the wor...  
JP2003222311
To obtain a temporary structure for dismantling an incinerator which can be adjusted according to the size of a furnace to be dismantled and can be constructed and removed rapidly and easily.In this temporary structure for dismantling th...  
JP2003221925
To provide a working scaffold of which the construction and withdrawal can be easily and rapidly carried out at a site and which can cope with the external diameter and the inclination of an object.The working scaffold is formed in a hor...  
JP2003206627
To provide a scaffold support jig capable of corresponding to a wide range of working purposes and promoting workability of a construction work.The scaffold support jig includes a supporting member 16 supporting a first holding and conne...  
JP3452138
To propose a method for installing a scaffold in a piping in which there is no danger of fall of a worker and pressing under materials when the scaffold for maintenance is mounted in a vertical pipe section continued from a horizontal pi...  
JP2003201764
To provide a device for preventing scattering of coating applied to a roof of a building, whose main body does not have to be so long and heavy, which can be easily mounted even by one person, and which is mounted on a peripheral part of...  
JP3452816
To provide a temporary work method for work scaffolding for a cylindrical structure by definitely supporting work scaffolding by a cylindrical structure and efficiently carrying out the work while securing safety at the turning point. A ...  
JP3447719
To provide an apparatus for installing a scaffold cage, which is specially used for installing section steel flange, onto an existing wall easily and surely. The installation apparatus 1 is installed between a flange installation part 3 ...  
JP2003184033
To develop and provide a method for engaging a scaffold for use in constructing a concrete structure and a method for sliding the same, which prevent the scaffold from inclining outward even if a fixture for engaging the adjacent scaffol...  
JP2003184301
To provide a climbing work unit capable of quickly carrying out assembly and disassembly work and, at the same time, quickly carrying out rising and moving work.The climbing work unit 20 has a unit frame body 21, the unit frame body 21 i...  
JP3443190
PURPOSE: To facilitate the fitting and removal of a working stage, which is to be provided in a steel framed column. CONSTITUTION: Each slide member 2 is provided in both ends of a horizontal bar 1, which has a locking hole 1a, freely to...  
JP3439196
To provide a means for surely and easily assembling a scaffold for applying maintenance work to an outer wall of a building. This suspended scaffold is composed of a plurality of guide members 20 suspended along the outer wall W by a par...  
JP3439555
PURPOSE: To obtain a hanging scaffolding member using an expand metal plate having a sufficient strength for a scaffold board provided on a basic frame while maintaining the strength of main members constituting the basic frame and the j...  
JP2003166350
To provide a mobile safety protection carriage which has excellent general-purpose properties for various types of buildings and can reduce the cost of equipment for roofing work.This carriage is used in the roofing work for the building...  
JP2003161035
To provide an elevating step capable of preventing a fixing bolt from falling off.This elevating step has: an approximately U-shaped bracket 3 which is welded and fixed to a steel frame 2 of a building; a frame-shaped step body 20 which ...  
JP2003161036
To provide a coupling metallic material for hanging scaffolding, which can be inexpensively manufactured by using an existing single-pipe clamp and can effectively prevent a pipe member from falling off.This coupling metallic material is...  
JP2003160913
To provide a suspended scaffold for inspecting a bridge in which transportation to a working site and storage are facilitated by making a structure simple and miniaturizing, and also, attaching and detaching to/from a balustrade can be e...  
JP2003163518
To enable maintenance work without removing a radome in maintenance of an array antenna mounted on a wall.A maintenance device has a maintenance gondola 4 at the lower part within a radome 3 of an array antenna 2, a hoisting machine 5 at...  

Matches 701 - 750 out of 2,138