Document Document Title
JP6929078B2
To improve worker's safety and work efficiency.In a scaffold device 100 having a ladder portion 110 provided with a suspending member 113 provided on one end side in the longitudinal direction and a scaffold portion 120 having a pair of ...  
JP6929180B2
To provide a temporary installation method of scaffolds in a boiler furnace which facilitates install a simple configuration scaffold in a clinker hopper.A temporary installation method of scaffolds in a boiler furnace to install scaffol...  
JP6928008B2
A supply scaffold for arranging in the interior of a tower, in particular in the interior of a tower of a wind power installation, and to a scaffold module for a supply scaffold of said type, and to a tower having a supply scaffold of sa...  
JP6926028B2
To allow a temporary frame to be installed efficiently even if there are restrictions on the work contents.The temporary frame column has a first temporary frame 1 having a guide column 11 attached vertically with respect to the column C...  
JP6925707B2
To provide basement attic structure or the like which can facilitate work such as piping installation and electrical wiring at an attic space, and facilitate ceiling construction.A basement attic structure according to the invention is p...  
JP2021116647A
To provide a temporary scaffold which has a folding mechanism even with a simple structure, and can be strongly fixed to an engaged part while having a depth.A temporary scaffold 1 fixed to an engaged part (gate 2) includes a scaffolding...  
JP2021113488A
To provide a scaffold device capable of improving a workability safely during a work on a roof.A scaffold device 10 comprises: a plurality of scaffold plates 20 on which a worker gets on a slate roof R; and a pair of annular guide rails ...  
JP6915218B2
To provide an FRP walkway with fewer parts of the main girder and easy to secure strength of the main girder.There is provided FRP walkway comprising a main girder 1, a support pillar 2 erected on both sides of the main girder 1, and a h...  
JP3233176U
To provide a temporary member auxiliary support having a simple structure, a small number of component parts, and an effective use of an upper portion or a lateral region of a rising wall portion. A temporary member auxiliary support 1 h...  
JP6909521B1
To provide a gondola device capable of correcting a left-right inclination of a work floor at low cost. The height position of the hanging point of the left rope 41 for suspending the left end of the work floor on the gondola main body o...  
JP6911094B2
To provide a working floor device capable of simply reducing the workload of a worker.A working floor device 1 comprises a beam and an arm-type work assisting instrument 9. The working floor device 1 is hung on at least two hanging parts...  
JP6898161B2
To provide a temporary passage system which can make passage of construction participants possible between outside of a high-rise structure and a suspended gondola, and improve workability, and provide a repairing method of the high-rise...  
JP6885888B2
To provide a scaffold installation method capable of efficiently carrying out a scaffold installation work and reducing scaffold installation cost when installing a scaffold in a large structure.A scaffold 10 is installed by lifting a pl...  
JP2021514437A
The present invention relates to a slip foam device (12,14,16) and a method of operating the slip foam device (50) for constructing a primary slip foam structure (22) from one side thereof. The slip foam device comprises a platform (12) ...  
JP2021085294A
To provide a cylindrical structure assembly method that can work even in a narrow space.A cylindrical structure assembly method comprises: a lamination step (S11) for laminating a first cylindrical body and a second cylindrical body in a...  
JP2021075934A
To provide a work gondola device that can stably maintain a position thereof even when the height of a building is high or when a main body of the gondola is blown by wind.In a work gondola device 1 in which a plurality of mounting brack...  
JP2021075871A
To provide a pipe connecting mechanism used for a frame member for a suspended scaffold capable of extremely easily constructing a frame member for a scaffold corresponding to a curved skeleton such as an expressway like an assembling wo...  
JP6875120B2
To provide a floor panel, a floor structure using this floor panel, a method of constructing a floor part, and a method of reuse of a building frame which make it possible to easily construct a temporary floor and be removed independentl...  
JP6872767B2
To provide a support structure and a support method for a suspended scaffolding that support a horizontal member for supporting a suspended scaffolding with a girder or a beam of an elevated structure, the support structure and the metho...  
JP6868342B2
To effectively use a vertical hole space formed in a vertical direction through a multi-storied building, and enhance work efficiency inside the vertical hole space.An installation method of a suspension scaffold includes the following s...  
JP6860323B2
To provide a movable work platform for repairing a building with which, in repairing work for a wall surface of a concrete building, repairing construction itself can be efficiently performed because there is no necessity of assembling a...  
JP6856949B2
To solve the problem in which a conventional support device of a scaffold and a support device had a problem that it was hard to support an upper end side of the scaffold properly and to improve a stability of the scaffold.A support devi...  
JP2021055454A
To provide a building construction method improving a workability and to provide a temporary structure used in a building construction method.A building construction method utilizes a panel attaching tool 1 used in attaching a building p...  
JP2021055514A
To disclose a scaffold for wall paintings production with a ruler function and a compass function.The scaffold for wall paintings production with a ruler function and a compass function comprises a support frame, a safety rod is installe...  
JP6851784B2
To provide a suspension scaffold suspended on a beam member such as a steel frame in a building.A suspension scaffold comprising a suspension mechanism (3) having a support arm (10) extending transversely from an upper end of a strut (5a...  
JP2021042535A
To provide a working scaffold installation structure in a boiler furnace capable of providing a working scaffold in the boiler furnace while reducing the vertical height of a beam insertion opening provided in a boiler wall.MEANS FOR SOL...  
JP6844122B2
To provide a foothold assembling method and a work foothold capable of improving the workability in assembling work of a work foothold while ensuring the safety in an initial stage of assembling of the work foothold installed on a roof.A...  
JP2021031868A
To provide an installation method of a scaffold capable of more efficiently disassembling a cylindrical structure.A method for installing a scaffold around a cylindrical structure, the method comprises: (1) a step of welding a plurality ...  
JP6818201B2
To provide a scaffolding material lifting carrier which is applicable in a short time without using labor, and to a narrow space.Provided is a holder for lifting scaffolding materials including long articles, including: a box 2 having a ...  
JP6818786B2
To provide a method for installing a falling-prevention covering body on a concrete outer wall, capable of installing the falling-prevention covering body on the concrete outer wall without using a heavy machine.A work scaffold 2 is inst...  
JP6815548B1
To provide a method for constructing a layered body capable of preventing damage to a surface to be constructed and a fall accident by a simple process. A method of constructing a layered body is an injection device operated by an operat...  
JP6812025B1
To provide a building tool which facilitates aerial work and pillar installation work. A shaft-shaped main body 2 and a pair of engaging shafts 3, 3 provided on the side surfaces of the main body 2 are provided, and the pair of engaging ...  
JP6813546B2
A work platform system for implementation in relation to a structure, as well as subsystems and components thereof and methods of implementation and use relating thereto, are disclosed herein. In at least one embodiment, the work platfor...  
JP6809834B2
To provide a scaffold support member configured to easily form a scaffold even in a folded-plate roof including a seam fastening structure in a crest part, and a scaffold structure on the folded-plate roof.A scaffold support member 1 is ...  
JP6795573B2
To provide a hung scaffold and a fall preventing metal fitting with which a worker can secure safety by a life rope when moving on a hung scaffold and a building beam.A hung scaffold 100 comprises: a hung scaffold body 110 which includes...  
JP6786070B2
To provide a method of installing a non-scaffold for a bridge inspection permanent scaffold capable of reducing work labor and installation costs by extremely reducing work which requires traffic stop, and also providing excellent workab...  
JP6785576B2
To provide an assembling method of hanging foothold capable of improving the workability by reducing the work load imposed to works at site.The assembling method of a hanging foothold 1 is an assembling method in which a long columns 11 ...  
JP6783011B1
To provide a hanging scaffold that can be easily lifted without using a horizontal member. A rectangular frame 13 composed of an X beam 11 in the longitudinal direction arranged to face each other and a Y beam 12 arranged to face the X b...  
JP6783069B2
To enable shortening of time for temporary hanging scaffold installation work in work for the investigation, inspection and repair of a structure such as a bridge, enable securement of safety and labor saving, and prevent a hindrance to ...  
JP6779740B2
To provide an elevated structure inspection device, an elevated structure inspection device installation method, and an elevated structure inspection method that allow an inspection worker to perform an inspection while ensuring his or h...  
JP6777322B2
To improve installation workability of a temporary passage to a service platform.A temporary passage to a service platform is installed on a service platform 10. The service platform 10 is provided with: a plurality of sleeper members 13...  
JP3228416U
To eliminate noise, damage to a building side and breakage of a power supply cable by eliminating hitting of a wall surface by a power supply cable, and to raise and lower a work gondola which can smoothly raise and lower a gondola and m...  
JP6774253B2
To shorten an operation stop time of a furnace in maintenance of a heat treatment furnace.In a scaffolding assembly method in a heat treatment furnace, a plurality of scaffolding beams J are inserted into a heat treatment furnace 1 from ...  
JP2020169459A
To provide a gangway ladder for a gondola which suppresses rocking of a gondola during work, facilitates getting on and off of a worker to a veranda, and enhances safety of work.A rectangular mounting part 7 to be mounted on an upper sur...  
JP6765933B2
To provide a building open-ceiling part construction method capable of reducing temporary construction cost by eliminating the necessity of a temporary working platform, and shortening a construction period.The building open-ceiling part...  
JP6762905B2
To provide a connecting material and a connecting method capable of suppressing lowering of installation accuracy of a form.A joining material according to one embodiment is a connecting material that connects an external scaffold to an ...  
JP6762130B2
To develop a cushioning material for a stepping member fitted on the stepping member of a ladder and the like for protecting a solar battery panel.A ladder 1 comprises a ladder body 2, and a cushioning member 3 for a stepping member. The...  
JP2020143473A
To provide a scaffolding instrument for insulators with which insulators are possible to be lifted and lowered and which can be used safely as scaffolding.The invention is a scaffolding instrument for insulators which can be mounted on i...  
JP6752482B2
To improve workability of a work scaffold base mounting work when a connection cylinder body is constructed.A work scaffold base 40 is used when a man shaft and the like, which is a connection cylindrical body formed by connecting shaft ...  
JP2020124664A
To provide a steel tower maintenance method which can secure sufficient durability and the safety of construction while simplifying a process of the maintenance work of a steel tower, and a steel tower maintenance device.This steel tower...  