| Document |
Document Title |
|
JP10204853 |
To carry out an unerring control of a gate and a pump by predicting a water level in an estuary weir in a weir control system. On the basis of forecasted data on sea levels and outside-the- measurement water levels from the first water g...
|
|
JP10198405 |
To sharply shorten manhour required for a simulation test for checking the operation of a control program and to surely check the operation of the control program at the time of executing the simulation test. In the sequence control devi...
|
|
JP10193368 |
To obtain a target molding shape even if a cooling time is shortened by simulating deformation generated after a molding is removed from an initial shape immediately before removing it from a mold, and calculating alteration of the initi...
|
|
JP10174479 |
To improve estimating accuracy of a spindle position increment value by providing a means storing a spindle position command calculated from a stored spindle position command increment value, means storing a spindle position calculated f...
|
|
JP10143221 |
To provide a system and a method for supporting development with which the action of equipment corresponding to a control instruction can be easily comprehended and the operation of an equipment control program can be easily confirmed. A...
|
|
JP10133708 |
To realize a simulation with high precision, and to realize a high level operation support of a producing system by executing the simulation through connection with the information on the producing system when the producing system is ope...
|
|
JP2780526 |
PURPOSE: To correctly execute the heat accumulation of a heat accumulator to which an air conditioner is connected as following the transition of a season. CONSTITUTION: The enthalpy of outside air is found by a temperature sensor 10 and...
|
|
JP10124111 |
To improve a digital control system in generation of overshoot and undershoot caused in a feedback control system. The state quantum 14 of a controlling object 1, the quantity of state 17 of the device 2, quantity of state 18 of a model ...
|
|
JP10116105 |
To provide the generalized predictive control system which can be switched to smoothly without any large deviation in command value at the time of the switching to the generalized predictive control system. When a control system 31 inclu...
|
|
JP10105203 |
To provide a control system which has small delay of control response. A controlled system 1 consists of a linear controlled system, an actuator which changes the operation state of the controlled system, and a sensor which detects the o...
|
|
JP10105038 |
To obtain the plant simulating device which can simulate even delicate timing by independently providing a process simulating means, a controller simulating means, and an arithmetic unit which is put in charge of the operation of an oper...
|
|
JP2765691 |
To speedily perform a simulation processing again by model correction after retrogression to the simulation process at optional time halfway from a process. When process results of processes 12 and 13 at the end of the processes are not ...
|
|
JP10083490 |
To reducing a time for countermeasure preparation and personnel against rising water by predicting a dam outlet time over a long time and reporting of it to a relevant position in an early stage. A circumference area rainfall data collec...
|
|
JP10083412 |
To reduce the number of processes invalidating the processing of events by calculating event limit time through the use of the spatial influence range of the events at the inspecting of the non-contradiction of the processes execution. T...
|
|
JP2754192 |
To realize training to recognize fundamental characteristics and operation techniques about power generation facilities very economically as well as easily on an operator basis only by preparing a light weight and small computer. Three d...
|
|
JP2755893 |
PURPOSE: To provide a method for controlling rolling and device therefor with which control gain in a succeeding stage is optimized for every material to be rolled taking disturbance that is happened in the preceding stage into considera...
|
|
JP10058288 |
To flexibly perform the simulation of process elements working being influenced by one another within a certain process while it exists independently such as a machine tool. An expanded Petri net is produced by an expanded Petri net inpu...
|
|
JP2748919 |
To attain high efficiency in work and to execute adjustment without depending on the knowhow of a worker by automatically analyzing and deciding the adjustment quantity of a dielectric filter. The characteristic of an adjusting element i...
|
|
JP10039914 |
To shorten time for deceleration by reaching a target position when the deceleration is completed. When a deceleration start signal S12 is inputted from a deceleration start monitoring part 2, a predictive part 3 predicts an excess movin...
|
|
JP10034577 |
To attain efficient control by narrowing down a plurality of sensor information by filtering, and preparing a robot control program using only necessary sensor information at the time of controlling a robot mounted with a plurality of se...
|
|
JP10027008 |
To provide a method and device for controlling model having excellent transient characteristics by modeling an object to be controlled and easily realizing the reverse model of the object even when the object has a waste time or higher-o...
|
|
JP10020913 |
To easily extend a swing display diameter and enable safe, easy-to- understand confirmation by extending and superimposing a swing diameter on other operations according to the specified extension rate, and graphically displaying a machi...
|
|
JP10018014 |
To enhance the accuracy of a plating coating weight by decreasing the errors between a control command value and the actual value of a controlled object. This controller has a calculator 140 for control which calculates the command value...
|
|
JP10011103 |
To provide an actuator control device capable of calculating feedback gain in accordance with a controlled object at the time of controlling the feedback of an actuator. Control characteristics for a specimen 10 to be a controlled object...
|
|
JP10011111 |
To provide a working machine operating virtual oscillation generating device capable of executing suitable operation with presence by realistically grasping a working state even when a working position can not be observed. Operation sign...
|
|
JP10003302 |
To realize model prediction control where desired responsiveness is provided with few calculation loads by dividing controlled variable into the one with quick change and the one with slow change and executing the thinning of a predictio...
|
|
JP10002993 |
To provide a method formulating a model of a linear control system which is asymptotically stable if a given initial deviation as within a certain limit. To being with, a parametric model of a quasi-steady state system is formulated in t...
|
|
JP09325178 |
To make it possible to compare the actually measured data with dynamic characteristic analysis result data in electric dynamic characteristic comparison and discussion means at the time of analyzing the electric dynamic characteristics o...
|
|
JP09309665 |
To grasp the behavior of paper by forming a virtual paper feeding- conveying system in a computer on the basis of data obtained from a real paper feeding-conveying system, and conveying the virtually defined paper in the virtual paper fe...
|
|
JP09312509 |
To attain high efficiency in work and to execute adjustment without depending on the knowhow of a worker by automatically analyzing and deciding the adjustment quantity of a dielectric filter. The characteristic of an adjusting element i...
|
|
JP09305203 |
To provide a disturbance estimating device which can constitute a stable servo system even if an actual system and a model have differences in characteristic. This disturbance estimating device 7 consists of a feedback loop stabilizing f...
|
|
JP09297524 |
To enable effective training in a training simulation device of the facility control system which trains operators in a systematized monitoring and controlling device so that prompt and exact operations for minimizing damages in the cond...
|
|
JP09277260 |
To solve the problem that it is required that a mold is opened after a sufficient cooling time is elapsed when molten plastic is molded by the mold and production quantity per a unit time is restricted by the cooling time. When a mold is...
|
|
JP09269804 |
To surely secure stability by speedily execute arithmetic processing by simple constitution in the stable controller for an automatic control system utilizing current control. The responding characteristic of a control object GT is measu...
|
|
JP09268544 |
To alter the fluid model formula change of a piping whole part by employing a fluid model formula derived from a stationary inspection volume in a water conduit system simulation device used in the fluid analyzation of a water conduit sy...
|
|
JP09257990 |
To improve operability and efficiency for reducing labor to be spent the setting of operation parameters. This system is provided with an operation plan fail stroeing part 11 capable of storing a plurality of operation plane data files, ...
|
|
JP09251320 |
To prevent collision between operation parts on the same axis with simple control by simulating the operation of respective operation parts, predicting the presence or absence of the collision of the respective operation parts and correc...
|
|
JP09244705 |
To constitute a control model of high performance when a control system is controlled by the control model. A data dividing means 114 divides plural data, stored in a data base 121 for control model constitution supporting device 100, in...
|
|
JP09231198 |
To improve the reliability of a simulation result by simulating a phenomenon generated with the shift of an article by taking notice of space and time. Course information LA and LB, start position information MA and MB, start time inform...
|
|
JP09230778 |
To realize training to recognize fundamental characteristics and operation techniques about power generation facilities very economically as well as easily on an operator basis only by preparing a light weight and small computer. Three d...
|
|
JP09221998 |
To promote high degree of accuracy of forecasting operations for a ventilating state inside a tunnel having combined flow point and branch point and to make it possible to operate accurately a ventilation equipment. A traffic operation d...
|
|
JP09212219 |
To easily display an animation, etc., corresponding to the operation state of the controlled object by updating graphics display data on a three- dimensional virtual model in a previously set three-dimensional apace according to dynamic ...
|
|
JP09212211 |
To reduce the cost and time of repetitive practice in simulation by reading out accumulated data stored in individual storage means and calculating various quantities of new dam control with a start command for retrial. According to oper...
|
|
JP09204203 |
To provide a control command value calculator for searching a command value at high speed. A command value calculation part 100 at a control command calculator 111 fetches a target output as the target value of control output stored in a...
|
|
JP09185407 |
To guarantee a constant response matched with a controller even when the number of function of electric facility equipment is fluctuated by parallelly connecting simulation units as many as the number of equipment to be controlled as sim...
|
|
JP09185316 |
To easily simulate a flying body mounted with an engine which is in a development stage and to grasp problem points in the early stage of the development by using the output obtained when the engine mounted on an airframe to be simulated...
|
|
JP09179620 |
To provide a method and device for deciding the format of an object to be interfered with (hereinafter referred to as an object), an automatic deciding method for a work supporting format and an automatic decision method for a tooling fo...
|
|
JP09146614 |
To stably continue the control of running even when the use of a measuring instrument for obtaining control data is temporarily interrupted. While obtaining data related to a disturbance factor/operation state to be used for controlling ...
|
|
JP09146611 |
To stabilize a non-self-adjusting process or closed-loop unstable process by calculating a predictive control variable corresponding to an operated variable and increasing the value of the operated variable based on the difference betwee...
|
|
JP09146610 |
To provide a robust and efficient process control system. This process controller is structured as a nonlinear PID feedforward type controller for many variables equipped with a decoupling type external loop controller 10 which performs ...
|