To provide a cogeneration system capable of operating a cogeneration device in a state intended by a user.
An operation control means 7 manages a present electric power load, a present hot water supply heat load and a present terminal heat load, in addition to a time-series electric power load, a time-series hot water supply load and a time-series terminal heat load in a heat-consuming terminal, determines a time zone for operation capable of conducting energy saving by the operation of the cogeneration device 3 on the basis of managed information, and operates the cogeneration device 3 in the time zone for operation. Further a prohibition time zone setting means R is mounted for setting a prohibition time zone prohibiting the operation of the cogeneration device 3, and the operation control means 7 prohibits the operation of the cogeneration device 3 in the prohibition time zone set by the prohibition time zone setting means R even in the time zone for operation.
COPYRIGHT: (C)2004,JPO&NCIPI
Shin Iwata
Keiji Takimoto
Masahiro Yoshimura
Hiroshi Takagi
Satoshi Yoshida
Yoshio Fujimoto
Tatsuro Arai
Hiraku Yamamoto
Toho Gas Co., Ltd.
Seibu Gas Co., Ltd.
Noritsu Co., Ltd.
Chofu Manufacturing Co., Ltd.
JP6225598A | ||||
JP2002138902A | ||||
JP2002335627A | ||||
JP2002364863A | ||||
JP60228848A |