Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
電力系統監視装置、電力系統監視方法及び電力系統監視プログラム
Document Type and Number:
Japanese Patent JP6377537
Kind Code:
B2
Abstract:
The objective of the invention is to execute an online linked function test without impacting the operation of an actual system. This electric power system monitoring device includes: an information acquiring unit 15 which acquires failure information 32 indicating that a failure has occurred during monitoring and control, or in a test, in a monitoring server S, which is a computer which monitors and controls an electric power system, and a plurality of which are connected together using an information transmission network 4; and a determining unit 18 which, on the basis of information indicating whether or not test usage, set for each monitoring server S, is possible, determines a monitoring server S performing monitoring and control, to act as a monitoring server S that will execute a failover in response to a failure during monitoring and control, and determines a monitoring server S for which test usage is possible, to act as a monitoring server S which will execute a failover in response to a failure in a test.

Inventors:
Ryo Nakayama
Yuki Otomaru
Shimada Makoto
Application Number:
JP2015006157A
Publication Date:
August 22, 2018
Filing Date:
January 15, 2015
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
Toshiba Corporation
Toshiba Energy Systems Co., Ltd.
International Classes:
H02J13/00; G05B9/03; G06F11/20; G06F11/36
Domestic Patent References:
JP10051980A
JP6296325A
JP2000311153A
Foreign References:
WO2013094048A1
Attorney, Agent or Firm:
Kiuchi Mitsuharu