Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
建物の水平修復工法および建物の水平修復構造
Document Type and Number:
Japanese Patent JP6777408
Kind Code:
B2
Abstract:
PROBLEM TO BE SOLVED: To provide a horizontal repair method for a building that curtails an amount of time needed for horizontal repair of a foundation, even when a batholith of a retaining wall is at a location where a bearing pile for a ground is to be installed, by realizing in a short period of time a situation where reactive force is obtained from the ground by the bearing pile.SOLUTION: In the horizontal repair method for a building, reactive force is obtained from a ground when a batholith 102 of a retaining wall 101 is at a location where a bearing pile 2 for a ground 100 is to be installed, by inserting the bearing pile 2 into a through-hole 102a formed through the batholith 102. The horizontal repair method includes the following steps for: forming a casing pipe hole 12 through the ground 100 above the batholith 102, by pressing a casing pipe 1 into the ground; forming the through-hole 102a through the batholith, by inserting a boring tip tool into the casing pipe hole 12; and pressing the bearing pile 2 into the ground 100 underneath the batholith 102, by inserting the bearing pile 2 into the casing pipe hole 12 and then into the through-hole 102a of the batholith 102.SELECTED DRAWING: Figure 3

Inventors:
Hirofumi Kanemura
Ikeda Motoyuki
Koji Mimura
Application Number:
JP2016051883A
Publication Date:
October 28, 2020
Filing Date:
March 16, 2016
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
Dual Point Systems Co., Ltd.
DAIWA HOUSE INDUSTRY CO.,LTD.
International Classes:
E02D35/00; E02D37/00
Domestic Patent References:
JP10183661A
JP10317424A
JP2002295027A
JP2015101937A
JP60078015A
JP2006057312A
JP2015055105A
JP2014214458A
JP2006037491A
Foreign References:
WO2013113996A1
Attorney, Agent or Firm:
Taizo Jimbo