PURPOSE: To easily use the system by releasing orders of a shop floor as planned and analyzing the planned release again at the time of the occurrence of a failure of production.
CONSTITUTION: The order list and an appointed date 41 of delivery received from a production release plan system 30 are monitored by a production dispatch system 42; and if production fails, the production dispatch system 42 bears the responsibility to determine a revised dispatch rule to be conformed to and a position (work section) to which an article in process should be sent. The production dispatch system 42 calculates again the dispatch rule to be conformed to and a sequence for completion of a work unit based on the priority input revised by a user and generates a revised sequence and a priority recommended in a block 45 based on the analysis result. This information is fed back to the production release plan system 30 which gives a bottom up system to generate a plan order list 41. Thus, the system easy to use is obtained.
JPS6268260A | 1987-03-28 | |||
JPS62210546A | 1987-09-16 | |||
JPS62251051A | 1987-10-31 | |||
JPS60263656A | 1985-12-27 | |||
JPS62288903A | 1987-12-15 | |||
JPS60247706A | 1985-12-07 | |||
JPS5789149A | 1982-06-03 |
Next Patent: EARTH LEAKAGE BREAKER WITH OVERVOLATGE PROTECTION FUNCTION