To shorten the construction period of a refuse incineration facility.
In a building method for a building of a refuse incineration facility comprising a refuse charging stage to/from which a refuse collection vehicle moves, a refuse pit to charge the refuse from the refuse charging stage, an incinerator to charge and incinerate the refuse in the refuse pit, a boiler to generate steam by the combustion exhaust gas obtained by burning the refuse, and an exhaust gas treatment device to remove harmful components in the combustion exhaust gas passing through the boiler, precast concrete beams 3 are used for the beams 3 at the side of an incinerator of a hopper stage as high as a charging port 5 for charging the refuse in the refuse pit into the incinerator.
JP7424937 | concrete slab formwork |
JP2022116804 | DECK PLATE UNIT AND COMPOSITE SLAB |
HOSHIKA SATOSHI
IIDA YASUHIKO
YOSHIDA KATSUTOSHI
SEO ICHIYO
OKAMOTO NORIAKI
Next Patent: TWO-STAGED PARKING FACILITY