To provide a construction method of an artificial low water permeable layer adopted as a kind of underground water level lowering construction method at underground work of the large depth in the sand ground or the gravel ground having a high underground water level.
A water filling well 3A is arranged in one of the construction object ground, and a pumping well 3B is arranged in the other. At least two aqueous solutions X and Y are simultaneously or separately injected into the ground from the water filling well. Water is pumped up from the pumping well, and a hydraulic gradient is formed in the ground, and an underground water flow is generated to promote permeation. Water permeability of the ground is reduced by generating a fine and water insoluble deposit in the ground by contacting and reacting the two aqueous solutions in the ground.
Taya, Yuji
Hirai, Yoshio
Aoki, Masamichi
Mori, Kunimitsu
Okuda, Nobuyasu
Next Patent: CAISSON AND ITS CONSTRUCTION METHOD
