Title:
CONSTRUCTION METHOD FOR EARTH-RETAINING PREBUILT SOLDIER BEAM
Document Type and Number:
Japanese Patent JP2006193896
Kind Code:
A
Abstract:

To reduce a construction period and costs when an underground exterior wall is required in the demolition of an existing building, in terms of a construction method for an earth-retaining prebuilt soldier beam.

In this construction method for the earth-retaining prebuilt soldier beam, the underground exterior wall 3 and pressure-resistant slab 4 of the existing building are left behind after the demolition and removal of the existing building; the soldier beam 5 is erected inside the exterior wall 3 by being supported by the exterior wall 3 and the slab 4; horizontal sheathing is horizontally laid between the soldier beams; and a new building is constructed inside the horizontal sheathing between the soldier beams.


Inventors:
MIYAKE HIROMI
KIMURA KENJI
NOGUCHI TAKASHI
ITO TATSUNARI
OGAWA HIROAKI
ENDO TETSUYA
Application Number:
JP2005003756A
Publication Date:
July 27, 2006
Filing Date:
January 11, 2005
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
TODA CONSTRUCTION
International Classes:
E02D29/045; E02D5/02; E21D13/00
Domestic Patent References:
JP2001303599A2001-10-31
JPH11193641A1999-07-21
Attorney, Agent or Firm:
Isao Sasaki
Kyoko Kawamura