To provide a construction method of a foundation structure capable of remarkably reducing a construction scale, a construction period of time and a manufacturing cost by supporting the foundation structure on a lime ground.
A geological state of a construction ground 2 is investigated by a method improving accuracy of a survey by the combination of a physical survey before the base construction, a necessary place of a hollow section 4 is homogenized by being filled with a grout having strength equivalent to the peripheral ground from the ground, and after the safe foundation structure 5b has been constructed by carrying out an observation construction in the case of construction, added value becomes larger in a design made as a rigid foundation, and it is clarified by making a series of designing procedures as flow-chart.
WO/2011/059310 | LIQUID SURCHARGING FOR GROUND IMPROVEMENT |
JPH06212648 | FOUNDATION CONSTRUCTION |
JP2010007459 | STRUCTURE FOR PREVENTING LATERAL FLOW OF GROUND |
OUCHI MASATOSHI
SHIMOMURA SHU
MATSUI TAKASHI
TAKAHASHI MICHIO
MATSUSHIMA TAKUMI
NITTOC CONSTRUCTION
FUDO CONSTRUCTION CO