PURPOSE: To improve the durability and appearance on the slope face of the reinforcing filling and reduce the construction period and construction cost by carrying out the light work for the construction of the slope face.
CONSTITUTION: The ground at the construction position of the reinforcing filling is constructed on a foundation part 4 of crushed stones, etc., and a foam styrol block 1 rolled by a reinforcing member 2 is arranged at the position corresponding to the slope face on the foundation part 4, and the reinforcing member 2 is laid on the foundation part 4. Soil is piled up to the height of the foam styrol block 1 on the laid reinforcing member 2, and the foam styrol block 1 and the reinforcing member 2 are piling-arranged similarly on the constructed filling layer 3, and filling is carried out up to the height of the foam styrol block in succession.