To shorten a period of developing a simulation model, and to estimate conveyance capacity accurately.
This conveyance simulation system is provided with a facility-to-facility connection data storing section 104 storing a production facility-to-conveyance facility connection information table defining connection information between a production facility processing work and a conveyance facility conveying the work, and a conveyance facility-to-conveyance facility connection information table defining connection information between the conveyance facilities of a conveyance origin conveying the work and a conveyance destination, and an operation control program storing section 102 storing an operation control program controlling an operation for moving the work between the production facility and the conveyance facility based on the operation of the production facility for processing the work and the connection information defined in the production facility-to-conveyance facility connection information table, and an operation for moving the work between the conveyance facilities based on the connection information defined in the conveyance facility-to-conveyance facility connection information table. A simulation means 106 executes the production simulation according to this operation control program.
HARADA TOKUMI
YAMANO ATSUO
Next Patent: ROBOT CONTROL SYSTEM