To provide a means for determining iron and steel slug to be used according to operating environments and purposes when iron and steel slug is used as a sand covering material or a back-filling material.
An arranging location of a sand covering material or a back-filling material is determined (S101). Iron and steel slug to be used is temporarily determined (S102). In the case that the sand covering material or the back-filling material made of temporarily determined iron and steel slug is arranged at the arranging location, the state of solidification is predicted on the basis of at least either the concentration of hydroxyl group ions or the concentration of calcium ions in pore water of the iron and steel slug at the arranging location (S103) to determine whether the predicted state of solidification is in a desired state or not (S104). In the case that it is not in the desired state (No in S105), the evaluation of the temporarily determined iron and steel slug is repeated until the desired state of solidification is achieved.
SHINOZAKI HARUHIKO
SHIMODA KAZUTOSHI
NAKAGAWA MASAO
TSUJII MASATO
KISO EIJI
YAMADA HIROTERU
JPN6010036728, 尾島啓介, "高炉水砕スラグを用いた地盤改良工法の試験施工結果と固結要因の検討", 沿岸センター研究論文集, 200208, No.2, 81−84, JP, 沿岸開発技術研究センター
Yasuo Nara
Katsuyuki Utani