To control conveyance by a method wherein the conveyance control parameter of a conveying device in a production system is automatically optimized.
A conveyance control device comprises a simulation executing part 31 to simulate the motion of a work at a production system, a parameter correcting part 34 to correct the control parameter of a conveying device based on a simulation result by the simulation executing part 31, and a conveyance control part 22 to control the conveying device based on a control parameter corrected by the parameter correction part 34. Since the parameter correction part 34 corrects the control parameter of the conveying device based on a simulation result by the simulation executing part 31, the control parameter of the conveying device is automatically optimized.
KAKEBE TAKESHI
SASAKI MASATOSHI
Next Patent: MANUFACTURE OF POLISHING SUBSTANCE