To output the production capacity and cost from designing to manufacture in a short time by shortening the time and operation needed to examine the production capacity and cost at the design department and manufacturing factory without depending upon experience.
This device inputs component information, substrate information, production plan information, and production system information from a data input part 1. Then a production load rate examination result, a production capacity examination result, a cost examination result, and an area productivity examination result are outputted from a result output part 4 by a facility database, a line constitution database, and a cost database as component allocation know-how of the factory stored in a database part 2 and the production capacity examining algorithm, cost examining algorithm, and other various algorithm of an algorithm part 3.
YOKOMORI TADASHI
HAMANAKA HIROSHI
ONO HIROSHI
GOTO MASAHARU