To cut off a construction work tunnel from an operation tunnel in an underground disposal facility in which the construction work tunnel and the operation tunnel cross each other, and to enable a boring shear to be carried out and materials to be carried in by using the construction work tunnel.
In a disposal facility where a construction work tunnel 4 for carrying construction materials and a boring shear and an operation tunnel 5 for carrying in waste from a ground facility cross each other, a solid crossing part 41 is provided by expanding the construction work tunnel 4 at a crossing part 50 where the construction work tunnel 4 and the operation tunnel 5 cross each other, and detours the operation tunnel and cutoff doors 52, 53 are provided for cutting off the construction work tunnel 4 from the operation tunnel 5. Therefore, the operation tunnel 5 is cut off from the construction work tunnel 4 and the construction work tunnel 4 is used to carry out the boring shear and carry in the materials, on the other hand.
JP2002106289A | 2002-04-10 | |||
JP2002048900A | 2002-02-15 | |||
JP2004101306A | 2004-04-02 | |||
JP2006249735A | 2006-09-21 | |||
JP2006062821A | 2006-03-09 | |||
JP2000072210A | 2000-03-07 | |||
JP2007146522A | 2007-06-14 | |||
JP2004183441A | 2004-07-02 | |||
JPH0414599A | 1992-01-20 |
Next Patent: RECORDER