To provide a technique of filling the whole interior of a communicating through-hole with a filler, facilitating inhibition of the ingress of air bubbles into the filler, and ensuring workability in nut tightening work in execution of attachment construction work of fastening/attaching an attachment to a concrete base material with a bolt put through the through-hole in which a base material through-hole penetrating the concrete base material communicates with a bolt through-hole penetrating the attachment.
The attachment construction work includes a fastening process of fastening/fixing a cap 2 to a tall concrete column 1 using a fastener 10 having a bolt 11 with an injection hole 11c for filler injection, a nut 12, and a pair of washers 13 having a vent slot 13a formed therein, and a filler injection process of injecting a filler 5 into a communicating through-hole 4 through the injection hole 11c of the bolt 11, the filler injection process being executed following the fastening process. The attachment construction work is carried out to provide a fastening portion structure.
FUJII YASUNARI
IKENO SEIJI
KOBAYASHI KAORU
HIGASHI NIPPON RYOKAKU TETSUDO
JP2001355209A | 2001-12-26 | |||
JP2003227106A | 2003-08-15 | |||
JP2004346509A | 2004-12-09 | |||
JP2007154600A | 2007-06-21 | |||
JPH03243160A | 1991-10-30 | |||
JPH04207915A | 1992-07-29 | |||
JPH11323842A | 1999-11-26 | |||
JPH05172129A | 1993-07-09 | |||
JPH0262414A | 1990-03-02 |
Tadashi Takahashi
Takashi Watanabe
Suzuki Mitsuyoshi
Kazuya Nishi
Yasuhiko Murayama