PURPOSE: To actualize the shortening of a construction period in an elevator hall extension work, and curtailing a span of elevator operation stopping time and so on.
CONSTITUTION: A curing plate 10 is conveyed with a car 1, and it is locked to an elevator shaft wall 6 of a floor 7b installing an elevator hall. After that, an opening is installed in this wall 6. Concrete dust K is checked by the curing plate 10, namely, it is not entered into an elevator shaft 8. After the concrete dust K is cleaned up, operations are over by way of installation of a hall door 5 and suchlike. There is no need of installing a scaffold in this elevator shaft 8. It is recommendable that the curing plate 10 may be conveyed after being divided into several pieces for convenience' sake.