To provide an operating system for a reheating electric power plant capable of reducing start up time of a turbine by performing effective warming up.
This system is provided with a boiler 52, a steam turbine 51 driven by steam generated by the boiler 52, a first tube 11 for supplying steam generated by the boiler 52 to the steam turbine 51, a reheater 53, a second tube 19 for supplying steam after driving the steam turbine 51 to the reheater 53, a third tube 12 connecting the first tube 11 and the second tube 19 enabling steam generated by the boiler 52 to bypass the steam turbine 51, a valve 42 provided on the second tube 19 in passing through the steam turbine 51 for flowing out to the outside from the second tube 19, and a controlling part controlling opening of the valve 42. The controlling part 42 controls opening of the valve 42 at intermediate opening in warming up of the steam turbine 51.
Next Patent: TURBINE PROTECTING DEVICE