PURPOSE: To attain the changeover control to a standby path satisfying a requirement with respect to connection quality notified by the user at a fault of a transmission line of a communication network.
CONSTITUTION: Cross connect devices 7, 8 implementing path changeover between a standby transmission line 12 and active transmission lines 11a, 11b accommodating plural paths handled as a unit of line bundle between transmission installation terminal stations or lines connecting exchanges 1-6 are used to decide a standby path allocation quantity satisfying that the connection quality among the exchanges 1-6 is a preset criterion for each line group among the exchanges 1-6 when a fault takes place in the current transmission lines 11a, 11b of a communication network. The active path of the faulty active transmission line is switched to the standby path being the standby transmission line 12 according to the decided standby path allocation.
INOUE AKINARI