Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
杭打設施工管理方法
Document Type and Number:
Japanese Patent JP7436321
Kind Code:
B2
Abstract:
To provide a pile-driving construction management method enabling more reliable recognition whether or not a pile driven into a ground using a vibratory hammer has reached a bearing layer.SOLUTION: A pile-driving construction management method comprises: a step in which N value measurement of a ground G and a preliminary test to drive pile 1 to the ground G using a vibratory hammer 2 are performed beforehand to acquire correlation data between the degree of penetration resistance when the pile 1 penetrates the unpenetrated ground Ga for each vibration cycle of the vibratory hammer 2, which is calculated using measurement data strain sensor 10 and accelerometer 11 set on the pile 1 and the N value of the ground G; and a step in which a determination value is calculated using the intrusive resistance and correlation data of the target pile 1, which is calculated using the measurement data obtained by the strain sensor 10 and the accelerometer 11, which are set on a target pile 1 inserted into the ground G by the vibratory hammer 2, and it is determined whether or not the target pile 1 has reached the bearing layer S based on a comparison between a target value of the N value of penetration resistance set for the bearing layer S and the determination value.SELECTED DRAWING: Figure 1

Inventors:
Hiroyuki Saegusa
Hideyuki Asada
Hirofumi Taguchi
Application Number:
JP2020131736A
Publication Date:
February 21, 2024
Filing Date:
August 03, 2020
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
Toa Construction Industry Co., Ltd.
International Classes:
E02D13/06; E02D1/02
Domestic Patent References:
JP11209978A
JP2016180206A
JP6346443A
JP2018062738A
JP2007139454A
JP10102493A
JP2019078012A
JP3093915A
JP2015063803A
Attorney, Agent or Firm:
Clear stream international patent attorney corporation
Takayoshi in the daytime
Masao Sakaizawa