Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
電力管理装置、電力管理システム、電力管理方法、および電力管理プログラム
Document Type and Number:
Japanese Patent JP5755729
Kind Code:
B2
Abstract:
[Problem] Power supply-demand adjustment among power customers and apparatuses within a given area is performed while taking into account power supplied from distributed power sources. [Solution] An information processing apparatus 1 receives second management information and third management information from a second power management apparatus 2 provided to each power customer. The second management information represents an amount of power demand and an amount of power generation at a given future time point. The third management information represents an amount of power demand and an amount of power generation adjustable by the customer. The apparatus 1 receives configuration information from a third power management apparatus 4 provided to a power distribution grid. The configuration information includes pieces of information on power distribution apparatuses provided to the power distribution grid, customers, and an allowable capacity of power for each of power distribution grid sections. The apparatus 1 calculates a sum of amounts of power demand and a sum of amounts of power generation at the given future time point on the basis of the second management information. The apparatus 1 calculates an amount of power surplus or an amount of power shortage using a difference between the sum of amounts of power demand and the sum of amounts of power generation. The apparatus 1 creates first management information based on the configuration information and the amounts of power demand or the amounts of power generation adjustable by the customers represented by the third management information. The first management information includes a plan to reduce the amount of power surplus by increasing the amounts of power demand or reducing the amounts of power generation by the customers within a range not exceeding the allowable capacity of power for each power distribution grid section. Then, the apparatus 1 transmits the first management information to the second management apparatus 2.

Inventors:
Youhei Kawata
Hirohito Yano
Takayoshi Nishiyama
Application Number:
JP2013511815A
Publication Date:
July 29, 2015
Filing Date:
April 26, 2011
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
株式会社日立製作所
International Classes:
H02J3/00; H02J3/38; H02J3/46; H02J13/00
Domestic Patent References:
JP2007151371A2007-06-14
JP2011061931A2011-03-24
JP2011078168A2011-04-14
JP2004015882A2004-01-15
JP2007151371A2007-06-14
JP2011061931A2011-03-24
Attorney, Agent or Firm:
Isshiki International Patent Service Corporation