To reduce construction cost by facilitating construction.
A preceding handrail 1, which is mounted as a handrail of a scaffold newly constructed at the uppermost stage in a tube and coupler scaffolding 2 formed by erecting a plurality of standing poles 4 parallel to each other and horizontally stretching a scaffolding board 7 between the adjacent standing poles 4, includes: vertically long support posts 8 each detachably installed to the standing pole 4; and a lower sash bar 9 and braces 10 detachably installed between the support posts 8. Fasteners for fixing the support post 8 to the standing pole 4, and fixtures 13, 16 for mounting the lower sash bar 9 and the braces 10 are installed on the upper and lower ends of the support post 8, respectively. A hook which can be hooked and fixed to a support member 6 for the scaffolding board 7 is installed on the lower part of the support post 8 and above the fixture 16.
JP2003147953A | 2003-05-21 | |||
JP2010196403A | 2010-09-09 | |||
JP2013060780A | 2013-04-04 | |||
JP2012062654A | 2012-03-29 | |||
JP2005188275A | 2005-07-14 | |||
JP2000054621A | 2000-02-22 | |||
JP2007277963A | 2007-10-25 | |||
JP2004278106A | 2004-10-07 |