To provide the effective technique related to the peel-off prevention of the interior material attached to the inner wall of a tunnel.
This preparatory construction method has an attachment implement arranging process for attaching an attachment implement to the simulation tunnel of a tunnel wherein the interior material is attached to the tunnel substrate using the attaching implement; an interior material arranging process for attaching the interior material to the simulation tunnel; a variable pressure acting process for allowing variable pressure to act on the interior material attached using the attaching implement; and a displacement quantity measuring process for measuring the displacement quantity of the attachment implement and the interior material produced by the acting variable pressure.
YABE TORU
KIYOMIYA OSAMU
KIYOMIYA OSAMU
Next Patent: INSTRUMENT FOR MEASURING PEEL-OFF CHARACTERISTICS OF INTERIOR MATERIAL