Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
PRODUCTION PLANNING METHOD AND INTEGRATED OPERATION SYSTEM FOR DYEING FACTORY
Document Type and Number:
Japanese Patent JP2002073149
Kind Code:
A
Abstract:

To securely receive an order from a customer with short-period delivery and to maximize a production quantity as to a production planning method for a dyeing factory having multi-stage batch production processes.

A bottleneck process is preferentially allocated according to the date of delivery that a consumer desires and the day when raw materials and dyeing conditions are obtained and other processes are allocated according to the period of the allocated bottleneck process, so high-precision production planning is actualized and the dyeing factory can actualize short-period delivery that the customer requires, the abidance of the date of delivery, and prevention against a decrease in production quantity.


Inventors:
TANAKA YASUHIRO
HIROTA MASASHI
HORIO TOMOYUKI
IIMURO HIROYUKI
Application Number:
JP2000262078A
Publication Date:
March 12, 2002
Filing Date:
August 31, 2000
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
TEIJIN LTD
International Classes:
D06B23/00; G05B19/418; G06Q50/00; G06Q50/04; (IPC1-7): G05B19/418; D06B23/00; G06F17/60
Domestic Patent References:
JPH11852A1999-01-06
JPS63298665A1988-12-06
JPH05181871A1993-07-23
JPH07105278A1995-04-21
Attorney, Agent or Firm:
Tsunede Hayashi (1 person outside)