To provide a raw material transport ship allocation planning system and a raw material ship allocation planning method, capable of producing an efficient berth unloading plan and stably supplying raw material.
The raw material transport ship allocation planning system plans a ship allocation plan of steel raw material transport ship in the steel industry having a plurality of manufacturing plants. The raw material transport ship allocation planning system comprises a ship allocation plan planning device 110 planning a long period row material transport ship allocation plan, a ship allocation plan planning device 120 planning a short period row material transport ship allocation plan, and a factory-based cargo-handling adjusting device 210 adjusting a factory-based raw material transport ship allocation plan in each factory. The factory-based cargo-handling adjusting device 210 corrects the factory-based raw material transport ship allocation plan according to the short period raw material transport ship allocation plan. The ship allocation plan adjusting device 120 corrects the short period raw material transport ship allocation plan according to the corrected factory-based raw material transport ship allocation plan. By repeating those processing, the short period raw material ship allocation plan is planed.
COPYRIGHT: (C)2008,JPO&INPIT
Nagato Yasuto
Hiroo Okada
Sasuma trunk right
Endo Yuki
JP11100127A | ||||
JP2005343630A |
Kiyoshi Yasushima
Souji Sasaki
Noboru Omura
Takanashi Norio