To provide a sluice gate suitable for a water non-cutoff installation method, and the water non-cutoff installation method of the sluice gate in which a space of a gate room is not required as a flow passage after the sluice gate is installed.
When installing a sluice gate 1 in a flow passage pipe 13 penetrating a gate room R, the water non-cutoff installation method implements the steps of, in order: (1) cutting the flow passage pipe 13 within the gate room R; (2) mounting a communicating pipe 21 formed from double pipes to the sluice gate 1 beforehand and carrying the sluice gate 1 into the gate room R while contracting the communicating pipe 21; and (3) elongating the communicating pipe 21, fixing the sluice gate 1 to a skeleton 12 of the gate room R while communicating an end portion of the communicating pipe 21 to one cut end of the flow passage pipe 13, and fixing a door stop installation body 28 to the skeleton 12 around the other cut end of the flow passage pipe 13.
WATANABE YOSHIYUKI
MAEZAWA ENGINEERING SERVICE KK
JP2002146758A | 2002-05-22 | |||
JP2003286743A | 2003-10-10 | |||
JPH09209339A | 1997-08-12 | |||
JP2007120005A | 2007-05-17 | |||
JP2008196638A | 2008-08-28 | |||
JP2004278593A | 2004-10-07 | |||
JP2004019854A | 2004-01-22 | |||
JPH03153987A | 1991-07-01 | |||
JP2011058042A | 2011-03-24 |
Etsuo Tada
Next Patent: EXCAVATION CLAW AND BODY FOR EXCAVATION CLAW