To provide a steel pipe pile capable of constructing a uniform foot protection section and a construction method for the steel pipe pile.
This steel pipe pile 1 has a plurality of injection nozzles at intervals in the circumferential direction thereof at the end. At least one of the plurality of injection nozzles is an inward injection nozzle 2 disposed in such a manner as to inject toward the inner surface of the steel pipe pile. In this construction method, the steel pipe 1 pile stated above is used. Using a vibro-hammer, the steel pipe pile 1 is intruded a predetermined depth while injecting a high pressure water from the injection nozzles 6 for injecting in the direction of intruding the steel pipe pile and the inward injection nozzle 2. In place of the injection of the high pressure water, a fluidized solid material is injected from each injection nozzle to construct the foot protection section by solidifying the fluidized sold material at the end of the steel pipe pile.
ISHIHAMA YOSHIRO
YAMASHITA HISAO
TANAKA RYUTA
KIKUCHI YOSHIAKI
SUZUKI YUKICHI
YOKOYAMA HIROYASU
TAKAHASHI KENJI
PORT & AIRPORT RES INST
CHOWA KOGYO KK
JPS4933410A | 1974-03-27 | |||
JPS142089Y1 | ||||
JPS5310510A | 1978-01-31 | |||
JP2004270157A | 2004-09-30 | |||
JP2004176349A | 2004-06-24 | |||
JP2006207320A | 2006-08-10 |
Yasuhiko