To provide a substrate structure of a building wall surface, for setting scaffolding thereon, which facilitates setting of a wall tie for preventing toppling of the scaffolding, on an outer wall of a building, and dispenses with water-proofing with putty after removal of the scaffolding.
According to the substrate structure, a tapping screw 8 is inserted into a cylindrical sealing material 6 and a stainless steel cylinder 7, and its tip screw portion is screwed into a screw hole 5 in a wall substrate steel frame 3. When a head of the tapping screw 8 is protruded from a joint surface, the protruded portion serves as an engaging portion for engaging a wall tie receptacle 9. On the other hand, when the tapping screw 8 is screwed into the joint so as to be almost flush with the joint, the cylindrical sealing material 6 is compressed to be expanded, to thereby ensure sealing in a hole 4.
TAKAHASHI SHUICHI
SONODA CHIE
DAIWA GENERAL RES INST CO LTD