To provide a tile easy to be positioned in the eave ridge direction between the tiles adjacent to the left ad the right in the tile, in which a shiplap upper piece section and a shiplap lower piece section vertically superposed at the time of laying in the horizontal direction are formed to left-right both sides respectively.
A front hanging section 7, in which the eave-side front end of a shiplap upper piece section 2 is bend downwards and projected, is formed, and a rear handing section 17, in which the ridge-side front end of the shiplap upper piece section 2 is bent downwards and projected, is formed. The eave-side front end 3a of a shiplap lower piece section 3 is retreated by the thickness section of the front hanging section 7 towards the ridge side from the extension of the ridge-side front edge of a tile body 4, and the ridge-side front end 3b of the shiplap lower piece section 3 is retreated by the thickness section of the rear hanging section 17 towards the eave side from the extension of the ridge-side front edge of the tile body 4.
HIGASHITSUTSUMI YASUHISA
Next Patent: EXECUTION METHOD OF TILE ROOF AND TILE ROOF STRUCTURE