Title:
【発明の名称】ブラシなし直流電動機の転流時のピーク電流抑圧方法
Document Type and Number:
Japanese Patent JP3148269
Kind Code:
B2
Abstract:
A current actual value determination takes place exclusively in the DC intermediate circuit of the converter. The current build-up compared to the current redn. is delayed about a time span (tv). The current redn. is introduced with the arrival of a commutation signal of a rotor position transmitter and the current build up is delayed for the time span (tv). The current redn. before the arrival of a commutation signal of a rotor position transmitter (6) is introduced and the current build up is delayed for the time span (tv).
More Like This:
JP2000206213 | METHOD FOR MONITORING INSULATION OF ROTATING MACHINE |
JP2002199786 | APPARATUS AND METHOD FOR DETECTING OVERLOAD IN INDUCTION MOTOR |
JP2005147882 | TESTING APPARATUS |
Inventors:
Helmut Meyer
Kai Albrecht
Jürgen Seeberger
Kai Albrecht
Jürgen Seeberger
Application Number:
JP8113891A
Publication Date:
March 19, 2001
Filing Date:
March 22, 1991
Export Citation:
Assignee:
Heidelberger Druckmaschinen AG
International Classes:
G01R31/34; H02P6/15; H02P6/28; (IPC1-7): H02P6/14
Domestic Patent References:
JP6356190A | ||||
JP6464585A | ||||
JP58144592A |
Attorney, Agent or Firm:
Nobuyuki Kaneda (2 others)