Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
Systems and methods to generate the expected load at the completion of the turbine start-up sequence
Document Type and Number:
Japanese Patent JP6334131
Kind Code:
B2
Abstract:
Systems and methods for generating a predictable load upon a completion of a start sequence of a gas turbine 110 are provided. According to one embodiment, a system 100 may include a controller 600 to control the gas turbine 110 and a processor communicatively coupled to the controller 600. The processor may be configured to receive a start duration and a desired final load, and to calculate a target load rate to substantially reach the desired final load within the start duration based on the start duration and the desired final load. Measurements of a present load may be periodically received from a measuring device and used to periodically recalculate the target load rate. A present load rate may be periodically adjusted by the controller 600 based on the recalculation.

Inventors:
Noemi Dion Woolet
Nathan S Race
Application Number:
JP2013222855A
Publication Date:
May 30, 2018
Filing Date:
October 28, 2013
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
GENERAL ELECTRIC COMPANY
International Classes:
F02C7/26; F01D17/20; F01D17/24; F01D19/00; F02C9/28
Domestic Patent References:
JP2011069356A
JP2011153621A
JP2004116416A
Attorney, Agent or Firm:
Arakawa Satoshi
Hirokazu Ogura
Toshihisa Kurokawa
Takuto Tanaka