AUTOMATIC CHANGE PROPAGATION IN AN AREA-BASED OPEN PIT MINE DESIGNER
Document Type and Number:
WIPO Patent Application WO/2013/148898
Kind Code:
A1
Abstract:
Automatic change propagation in an area-based open pit mine designer is disclosed. One example includes an economic shell receiver module to receive an economic shell. In addition a user input module receives a user parametric input denoting an open pit mine shape based on the economic shell. An open pit mine designer module automatically develops an open pit mine design from the user parametric input. The user input module receives an additional area to be incorporated into the open pit mine design. The open pit mine designer module automatically propagates the additional area into the open pit mine design to generate a modified open pit mine design.

Inventors:
FERRIER ADRIAN (US)
SANTAMARIA JUAN CARLOS (US)
OPDENBOSCH AUGUSTO (US)
ROSENBALM LARRY (US)
ALTMAN MITCH (US)
DARBY GEORGE DERRICK JR
Application Number:
PCT/US2013/034190
Publication Date:
October 03, 2013
Filing Date:
March 27, 2013
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
TRIMBLE NAVIGATION LTD (US)
International Classes:
G01V9/00; G06T11/00
Domestic Patent References:
WO2009119960A12009-10-01
Foreign References:
US20120046818A12012-02-23
US20090306942A12009-12-10
US20080290718A12008-11-27
US20110299730A12011-12-08
Other References:
See also references of EP 2834790A4
Attorney, Agent or Firm:
GALLENSON, Mavis S. et al. (Suite 2100Los Angeles, California, US)
Download PDF:
Claims:
CLAIMS

We claim:

1. A method for automatic change propagation in an area-based open pit mine design, said method comprising:

receiving, at a computer system, an open pit mine design;

receiving, at the computer system, a user parametric input denoting an additional area to be incorporated into the open pit mine design; and

automatically propagating, at the computer system, the additional area into the open pit mine design to generate a modified open pit mine design.

2. The method of Claim 1 further comprising:

providing an annotation field related to the modified open pit mine design.

3. The method of Claim 2 wherein the annotation field provides information selected from the group consisting of: a user reasoning for the additional area, a cost metric for the additional area and a time line change for the additional area.

4. The method of Claim 1 further comprising:

erasing a portion of the additional area; and

automatically propagating, at the computer system, the erasing into the open pit mine design to generate the modified open pit mine design.

5. The method of Claim 1 further comprising:

comparing the user parametric input denoting the additional area to be incorporated into the open pit mine design with a present area of the open pit mine design; and

automatically limiting the additional area to areas that are not part of the present area of the open pit mine design.

6. The method of Claim 1 further comprising:

receiving the user parametric input for a deepest layer of the additional area to be incorporated; and automatically propagating the additional area from the deepest depth of the additional area to a top elevation.

7. The method of Claim 1 further comprising:

receiving the user parametric input for a surface layer of the additional area to be incorporated; and

automatically propagating the additional area from the surface layer to a deepest layer.

8. The method of Claim 1 further comprising:

receiving the user parametric input for a selected depth layer of the additional area to be incorporated; and

automatically propagating the additional area in both a shallow and a deeper direction from the selected depth layer.

9. The method of Claim 1 further comprising:

evaluating the modified open pit mine design against design objective metrics selected from the group consisting of: a minimized amount of waste to be removed, a time frame, a maximization of ore obtained and a mine machinery availability.

10. A parametric open pit mine designer with automatic change propagation comprising:

an economic shell receiver module to receive an economic shell;

a user input module to receive a user parametric input denoting an open pit mine shape based on the economic shell;

an open pit mine designer module which automatically develops an open pit mine design from the user parametric input;

the user input module to receive an additional area to be incorporated into the open pit mine design; and

the open pit mine designer module automatically propagates the additional area into the open pit mine design to generate a modified open pit mine design.

11. The parametric open pit mine designer of Claim 10 further comprising: an annotation field related to the additional area to be incorporated into the open pit mine design, the annotation field containing information selected from the group consisting of: a user reasoning for the additional area, a cost metric for the additional area, and a time line change for the additional area.

12. The parametric open pit mine designer of Claim 10 wherein the user input module limits the additional area to be incorporated into the open pit mine design to areas that are not part of the open pit mine design.

13. The parametric open pit mine designer of Claim 10 further comprising: the user input module to receive a user parametric input of a deleted area indicating a portion of area to be removed from the open pit mine design; and

the open pit mine designer module automatically propagates the deleted area through the open pit mine design to generate a further modified open pit mine design.

14. The parametric open pit mine designer of Claim 13 further comprising: an annotation field related to the deleted area, the annotation field containing information selected from the group consisting of: a user reasoning for the deletion, a cost saving metric for the deleted area, and a time line change for the deleted area.

15. The parametric open pit mine designer of Claim 10 further comprising: an open pit mine design evaluator to automatically evaluate the open pit mine design against design objective metrics selected from the group consisting of: a minimized amount of waste to be removed, a time frame, a maximization of ore obtained and a mine machinery availability.

16. The parametric open pit mine designer of Claim 10 wherein the open pit mine designer module automatically develops the open pit mine design from the group consisting of: down from the user parametric input, up from the user parametric input and both down and up from the user parametric input.

17. A method for automatic change propagation in an area-based waste storage design, said method comprising: receiving, at a computer system, a waste storage design for waste from an open pit mine design;

receiving, at the computer system, a user parametric input denoting an additional area to be incorporated into the waste storage design; and

automatically propagating, at the computer system, the additional area into the waste storage design to generate a modified waste storage design.

18. The method of Claim 17 further comprising:

providing an annotation field related to the modified waste storage design.

19. The method of Claim 17 further comprising:

erasing a portion of the waste storage design; and

automatically propagating, at the computer system, the erasing into the waste storage design to generate the modified waste storage design.

20. The method of Claim 17 further comprising:

automatically propagating, at the computer system, the additional area into the waste storage design to generate a modified waste storage design from the group consisting of: down from the user parametric input, up from the user parametric input and both down and up from the user parametric input.

21. A method for an area-based designing of an open pit mine, said method comprising:

receiving, at a computer system, an economic shell for an open pit mine location;

receiving, at the computer system, user parametric input denoting an open pit mine shape based on the economic shell; and

automatically generating, at the computer system, an open pit mine design based on the parametric input in conjunction with user adjustable open pit mine design metrics.

22. The method of Claim 21 wherein the user adjustable open pit mine design metrics comprise: a mine machinery characteristic selected from the group consisting of: truck parameters, truck geometry, a slope restriction, a weight restriction, a turning radius and a width of a haul road for a given vehicle.

23. The method of Claim 21 wherein the user adjustable open pit mine design metrics comprise:

a geological metric selected from the group consisting of: available land, waste dump locations, ore drop locations and geological information for material around the ore.

24. The method of Claim 21 wherein the user adjustable open pit mine design metrics comprise:

an open pit mine characteristic selected from the group consisting of: bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information.

25. The method of Claim 21 further comprising:

automatically regenerating the open pit mine design when the user adjustable open pit mine design metric is modified.

26. The method of Claim 21 further comprising:

receiving the user parametric input for a deepest layer of the open pit mine; and automatically generating the open pit mine design from the deepest layer to a surface based on the parametric input.

27. The method of Claim 21 further comprising:

receiving the user parametric input for a surface layer of the open pit mine; and automatically generating the open pit mine design from the surface layer to a deepest layer based on the parametric input.

28. The method of Claim 21 further comprising:

receiving the user parametric input for a selected depth layer of the open pit mine; and automatically generating the open pit mine design in both a shallow and a deeper direction from the selected depth layer based on the parametric input.

29. The method of Claim 21 further comprising:

evaluating the open pit mine design against design objective metrics selected from the group consisting of: a minimized amount of waste to be removed, a time frame, a maximization of ore obtained and a mine machinery availability.

30. A parametric open pit mine designer comprising:

an economic shell receiver module to receive an economic shell;

a user input module to receive a user parametric input denoting an open pit mine shape based on the economic shell; and

an open pit mine designer module which automatically develops an open pit mine design from the user parametric input.

31. The parametric open pit mine designer of Claim 30 further comprising: an environmental information provider to provide environmental information to the open pit mine designer module, the environmental information selected from the group consisting of: available land, waste dump locations, ore drop locations and geological information for material around the ore.

32. The parametric open pit mine designer of Claim 30 further comprising: a user adjustable open pit mine characteristic definer to provide slope information to the open pit mine designer module, the open pit mine characteristic selected from the group consisting of: bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information.

33. The parametric open pit mine designer of Claim 30 further comprising: a user adjustable engineering metric to provide engineering information to the open pit mine designer module, the engineering metric selected from the group consisting of: truck parameters, truck geometry and vehicle capability characteristics.

34. The parametric open pit mine designer of Claim 33 wherein the vehicle capability characteristics is selected from the group consisting of: a slope restriction, a weight restriction, a turning radius and a width of a haul road for a given vehicle.

35. The parametric open pit mine designer of Claim 30 further comprising: an open pit mine design evaluator to automatically evaluate the open pit mine design against design objective metrics selected from the group consisting of: a minimized amount of waste to be removed, a time frame, a maximization of ore obtained and a mine machinery availability.

36. The parametric open pit mine designer of Claim 30 wherein the open pit mine designer module automatically develops the open pit mine design from the group consisting of: down from the user parametric input, up from the user parametric input and both down and up from the user parametric input.

37. A method for parametrically designing a waste pile, said method comprising:

receiving a waste material amount based on an open pit mine design;

receiving a user parametric input denoting a waste storage shape; and automatically generating a waste storage design based on the parametric input and the waste material amount.

38. The method of Claim 37 further comprising:

automatically generating the waste storage design from the group consisting of: down from the user parametric input, up from the user parametric input and both down and up from the user parametric input.

39. The method of Claim 37 further comprising:

utilizing a mine machinery characteristic when automatically generating the waste storage design, the mine machinery characteristic information selected from the group consisting of: truck parameters, truck geometry, a slope restriction, a weight restriction, a turning radius and a width of a haul road for a given vehicle.

40. The method of Claim 37 further comprising: utilizing a geological data when automatically generating the waste storage design, the geological data selected from the group consisting of: available land, waste dump locations, ore drop locations and geological information for material around the ore.

41. The method of Claim 37 further comprising:

receiving a user adjustable waste storage design characteristic; and

automatically regenerating the waste storage design when the user adjustable waste storage design characteristic is modified.

42. The method of Claim 40 wherein the waste storage design characteristic is selected from the group consisting of: bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information.

43. A method for designing an open pit mine, said method comprising:

receiving, at a computer system, an economic shell for an open pit mine location, the economic shell comprising the ore to be obtained;

accessing, at the computer system, a geological data and a mine machinery characteristic for the open pit mine location; and

utilizing a minimum amount of waste to be removed metric in correlation with a maximum amount of ore recovered metric in conjunction with the economic shell, the geological data and the mine machinery characteristic information to automatically generate, at the computer system, an open pit mine design.

44. The method of Claim 43 further comprising:

receiving a mine metric modification; and

redesigning the open pit mine design based on said mine metric modification.

45. The method of Claim 43 wherein the geological data is selected from the group consisting of: available land, waste dump locations, ore drop locations and geological information for material around the ore.

46. The method of Claim 43 wherein the mine machinery characteristic information is selected from the group consisting of: truck parameters, truck geometry, a slope restriction, a weight restriction, a turning radius and a width of a haul road for a given vehicle.

47. The method of Claim 43 further comprising:

generating a plurality of individual layers, each individual layer denoting a distinct elevation portion of the open pit mine design; and

combining the plurality of individual layers to form a complete open pit mine design.

48. The method of Claim 47 further comprising:

utilizing the geological data to determine a bench height for a wall of the open pit mine design; and

utilizing the bench height to define the elevation separation distance between the plurality of individual layers.

49. The method of Claim 43 further comprising:

utilizing the mine machine characteristic in conjunction with the geological data to determine slope information comprising: a bench height; a berm width; a slope angle; and a ramp width.

50. An open pit mine designer comprising:

a metric receiving module to receive an economic shell metric including ore information and an open pit mine metric;

a user input module to receive user modifiable information; and

an open pit mine designer module which automatically combines the open pit mine metrics, the user modifiable criteria and a waste reduction criteria to develop an open pit mine design, wherein user modifiable information may be used to adjust the open pit mine design during the life of the open pit mine.

51. The open pit mine designer of Claim 50 wherein the open pit mine metrics receives metric information further comprises:

an environmental metric; and

an engineering metric.

52. The open pit mine designer of Claim 51 wherein the environmental metric is selected from the group consisting of: available land, waste dump locations, ore drop locations and geological information for material around the ore.

53. The open pit mine designer of Claim 52 wherein the slope information is selected from the group consisting of: bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information.

54. The open pit mine designer of Claim 51 wherein the engineering metric is selected from the group consisting of: truck parameters, truck geometry and vehicle capability characteristics.

55. The open pit mine designer of Claim 54 wherein the vehicle capability characteristics is selected from the group consisting of: a slope restriction, a weight restriction, a turning radius and a width of a haul road for a given vehicle.

56. The open pit mine designer of Claim 50 wherein the economic shell metric is selected from the group consisting of: a type of an ore, a quantity of the ore and a value of the ore.

57. The open pit mine designer of Claim 50 wherein the user modifiable criteria is selected from the group consisting of: a mining timeline, an ore retrieval ranking, and a vehicle availability.

58. The open pit mine designer of Claim 50 wherein the waste reduction criteria is based on a least amount of waste to be removed while obtaining the ore in the economic shell metric.

59. A method for designing a waste pile, said method comprising:

receiving a waste material amount based on an open pit mine design;

receiving geological data about the waste material and a storage location; and utilizing the geological data and the storage location in conjunction with the waste amount to automatically develop a waste storage design.

60. The method of Claim 59 further comprising:

receiving a waste material amount modification; and

redesigning the waste storage design based on the waste material amount modification.

61. The method of Claim 59 further comprising:

receiving a waste delivery vehicle characteristic; and

redesigning the waste storage design based on the waste delivery vehicle characteristic.

62. The method of Claim 59 further comprising:

utilizing the waste delivery vehicle characteristic in conjunction with the geological data to determine slope information for the waste storage design comprising: a bench height; a berm width; a slope angle; and a ramp width.

63. The method of Claim 59 further comprising:

generating a plurality of individual layers, each individual layer denoting a distinct elevation portion of the waste storage design;

utilizing the bench height to define the elevation separation distance between the plurality of individual layers; and

combining the plurality of individual layers to form a complete waste storage design.

Description:
AUTOMATIC CHANGE PROPAGATION IN AN AREA-BASED OPEN PIT MINE

DESIGNER

CROSS REFERENCE TO RELATED U.S. APPLICATIONS

[0001] This application claims priority to and benefit of co-pending United States Provisional Patent Application Serial Number 61/616,868, Attorney Docket Number TRMB-3030.PRO, entitled "MINE OPTIMIZATION," by George Derrick Darby, Jr., with a filing date of March 28, 2012, and assigned to the assignee of the present application.

[0002] This application is related to co-pending United States Patent Application Serial Number 13/827,239, Attorney Docket Number TRMB-3030, entitled "Open Pit Mine Designer," by Darby et al., with a filing date of March 14,2013, and assigned to the assignee of the present application.

[0003] This application is related to co-pending United States Patent Application Serial Number 13/827,461 , Attorney Docket Number TRMB-3030-1, entitled "Area- Based Open Pit Mine Designer," by Ferrier et al., with a filing date of March 14, 2013, and assigned to the assignee of the present application.

[0004] This application is related to co-pending United States Patent Application Serial Number 13/829,804, Attorney Docket Number TRMB-3030-2, entitled

"Automatic Change Propagation In An Area-Based Open Pit Mine Designer," by Darby et al, with a filing date of March 14, 2013, and assigned to the assignee of the present application.

BACKGROUND

[0005] Open pit mines are one of a plurality of types of mines that can be used to extract ore from the Earth. However, instead of using tunnels or other types of underground extraction processes, open pit mines remain open to the environment. They may also be known as surface mines. BRIEF DESCRIPTION OF THE DRAWINGS

[0006] The accompanying drawings, which are incorporated in and form a part of this application, illustrate and serve to explain the principles of embodiments in conjunction with the description. Unless noted, the drawings referred to this description should be understood as not being drawn to scale.

[0007] Figure 1A is a diagram of an economic shell of an open pit mine according to one embodiment of the present technology.

[0008] Figure IB is a graphical representation of slope information according to one embodiment of the present technology.

[0009] Figure 1C is a plan view for one elevation level of an open pit mine design according to one embodiment of the present technology.

[0010] Figure ID is a diagram of a ramp construct for a given elevation according to one embodiment of the present technology.

[0011] Figure IE is a diagram of a convex turn according to one embodiment of the present technology.

[0012] Figure IF is a diagram of a concave turn according to one embodiment of the present technology.

[0013] Figure 2 is diagram of a completed open pit mine design according to one embodiment of the present technology.

[0014] Figure 3 is an open pit mine designer according to one embodiment of the present technology.

[0015] Figure 4A is a flowchart of a method for automatically generating an open pit mine design according to one embodiment of the present technology.

[0016] Figure 4B is a flowchart of a method for automatically generating a waste storage design according to one embodiment of the present technology. [0017] Figure 5 is an area-based open pit mine design shown in accordance with one embodiment of the present technology.

[0018] Figure 6A is a flowchart of a method for an area-based designing of an open pit mine shown in accordance with an embodiment of the present technology.

[0019] Figure 6B is a flowchart of a method for automatically developing a waste storage design shown in accordance with one embodiment of the present technology.

[0020] Figure 7A is an area-based open pit mine design with a user parametric input denoting an additional area to be incorporated into the open pit mine design shown in accordance with one embodiment of the present technology.

[0021] Figure 7B is an area-based open pit mine design with a user parametric input denoting an area to be erased from the open pit mine design shown in accordance with one embodiment of the present technology.

[0022] Figure 8A is a flowchart of a method for automatic change propagation in an area-based open pit mine design shown in accordance with an embodiment of the present technology.

[0023] Figure 8B is a flowchart of a method for automatic change propagation in an area-based waste storage design shown in accordance with one embodiment of the present technology.

[0024] Figure 9 is a block diagram of an example computer system upon which embodiments of the present technology may be implemented.

DESCRIPTION OF EMBODIMENT(S)

[0025] Reference will now be made in detail to various embodiments of the present technology, examples of which are illustrated in the accompanying drawings. While the present technology will be described in conjunction with these embodiments, it will be understood that they are not intended to limit the present technology to these embodiments. On the contrary, the present technology is intended to cover alternatives, modifications and equivalents, which may be included within the spirit and scope of the present technology as defined by the appended claims. Furthermore, in the following description of the present technology, numerous specific details are set forth in order to provide a thorough understanding of the present technology. In other instances, well-known methods, procedures, components, and circuits have not been described in detail as not to unnecessarily obscure aspects of the present technology.

[0026] Unless specifically stated otherwise as apparent from the following discussions, it is appreciated that throughout the present description of embodiments, discussions utilizing terms such as "receiving", "storing", "generating", "transmitting", "inferring," or the like, refer to the actions and processes of a computer system, or similar electronic computing device. The computer system or similar electronic computing device manipulates and transforms data represented as physical (electronic) quantities within the computer system's registers and memories into other data similarly represented as physical quantities within the computer system memories or registers or other such information storage, transmission, or display devices.

Embodiments of the present technology are also well suited to the use of other computer systems such as, for example, mobile communication devices.

Overview

[0027] Embodiments of the present invention enable the automatic and efficient generation of an open pit mine design. In the following discussion, the automated open pit mine design develops an open pit mine design that utilizes a least amount of waste removal criterion while retrieving a majority of the ore delineated by the economic model. That is, the open pit mine designer provides a design that results in the least amount of waste needing to be removed while recovering approximately all of the ore delineated by the economic model. [0028] In other words, any moved earth is purely a cost factor to the mine. Therefore, by utilizing the open pit mine designer described herein to plan a mine that requires less earth/waste removal to obtain the same amount of ore, the mine will make the same amount of money, e.g., acquired ore, while reducing the ancillary costs of waste removal, and enforcing the engineering constraints to ensure sufficient structural integrity of the bench walls and allowing efficient routes for earthmoving equipment.

[0029] With reference now to Figure 1A, a diagram 100 of an economic shell 108 of an open pit mine is shown in accordance with one embodiment. For purposes of the present discussion, the economic shell 108 provides a perfect world open pit mine design. In other words, the economic shell 108 only notes the type of ore deposits 109a, 109b, the ore deposit locations and a standardized slope for achieving the open pit design. Thus, the economic shell 108 illustrates what an open pit mine would look like if the ore and waste was removed without concern of how the actual ore and waste removal occurred. For example, the economic shell usually does not include haul roads, engineering criteria, geological information used to determine the actual slope, or the like.

[0030] Referring now to Figure IB, a graphical representation of slope information 150 is shown in accordance with an embodiment. In general, the slope information 150 includes bench height 155, berm width 157, ramp width 158 and slope angle 159.

[0031] With reference now to Figure 1C, a plan view for one elevation level of an open pit mine plan 175 is shown in accordance with one embodiment. Elevation cross-section mine plan 175 includes economic shell 108, actual pit perimeter 165, a portion of a waste haul road 170 and a portion of an ore haul road 173.

[0032] In general, the elevation level refers to a cross-section for the open pit mine design at a given elevation. For example, if the open pit mine economic shell 108 includes an elevation range of 300 meters, that is, the bottom of the mine is 300 meters below the top of the mine, the cross-section 175 would include only a specific elevation, e.g., 150 meters. For example, in one embodiment if bench height 155 is 15 meters there may be 20 cross-sections 175 for an open pit mine design having a desired depth of 300 meters. In another embodiment, the number of cross-sections for the mine design may be based on other metrics such as those discussed herein.

[0033] With reference now to Figure ID, a ramp construct 185 for a portion of road 190 for a given elevation is shown according to one embodiment. That is, in conjunction with the cross section for each section of the mine pit as shown in Figure 1C, a ramp construct 185 is determined. Although only one ramp construct 185 is shown, in one embodiment, multiple ramp constructs 185 may be utilized for each cross-section of elevation to support independent transportation of material, for example, ore haul roads and waste hauling roads. In one embodiment the length 188 of the ramp construct road 190 is determined by the height 155 of the cross-section in conjunction with the determined road grade slope.

[0034] For example, if the bench height 155 is 15 meters and the road grade is determined to be 10%, then the length 188 for the ramp construct portion 185 would be 150 meters. In one embodiment, ramp construct 185 may additionally utilize information, such as but not limited to, a stack height, e.g., a number of benches 192, a stack slope: based on material failure; a step out width and a switchback haul road-to reach a location without going around the pit.

[0035] With reference now to both Figures 1C and ID, in one embodiment, the location of ramp construct 185 (e.g., haul roads 170 and 173) for each level are picked at the elevation chosen in a prior level and are sloped in an appropriate direction based on whether the road 190 is moving up or down. For example, the haul road boxes 170 and 173 shown in further detail in ramp construct 185 are moved up in the direction of the surface and go to the crest string. A surface elevation tie in is used to ensure that each of the prior ramp construct 185 surfaces smoothly meet the next levels ramp construct 185 surfaces in the correct direction and location.

[0036] With reference now to Figure IE, an embodiment of a convex turn 195 is shown. In Figure IF, an embodiment of a concave turn 197 is shown. In general, the turns 195 and 197 illustrate two embodiments of turns being implemented between two of the layers shown in Figures 1 C and ID. [0037] With reference now to Figure 2, one version of a completed open pit mine design 200 is shown. Open pit mine design 200 includes the pit design 165, ore haul road 175 and waste haul road 170 ramp constructs 185 for every layer overlaid on the economic shell 108. In one embodiment, a color code may be utilized to show positive and negative areas within the open pit mine design 200 and to provide recommendations about open pit mine design modifications. In addition, color may be used in a per ore block basis to describe the type or types of minerals within an ore block, an actual cost of removing the ore block, and the like.

[0038] With reference now to Figure 3, an open pit mine designer 300 is shown in accordance with an embodiment of the present technology. In one embodiment, open pit mine designer 300 includes metric receiver module 310, user input module 320 and open pit mine designer module 330.

[0039] As shown in Figure 3, metric receiver module 310 receives input metrics such as environmental information 302, economic shell information 108 and engineering information 306. In general, environmental information 302 includes geological information about material around the ore, information such as a mineral type of the ore, a quantity of the ore and a value of the ore, as well as waste dump locations, ore drop locations and the like. Engineering information 306 may include vehicle availability, truck parameters, truck geometry and vehicle capability characteristics and the like.

[0040] In one embodiment, metric receiver module 310 provides the received information to user input module 320. User input module 320 may optionally receive additional input from user modifiable information 325. In general, user modifiable information 325 may include information related to user adjustments such as ore retrieval ranking, mining timeline information, vehicle availability, fuel availability, dump location changes, updated geological information and the like.

[0041] User input module 320 provides the information from metric receiver module

310 and any user modifiable information 325 to open pit mine designer module 330.

In one embodiment, open pit mine designer module 330 utilizes the input to develop an open pit mine design 200 with underlying criteria to develop a design with the least amount of waste that needs to be removed to obtain the ore delineated in the economic model.

Open Pit Mine Design

[0042] With reference now to Figure 4A, a flowchart 400 of a method for designing an open pit mine is shown in accordance with one embodiment of the present technology. That is, by planning a mine that requires less earth/waste removal to obtain the same amount of ore, the open pit mine makes the same amount of money, e.g., acquired ore, while reducing the ancillary costs of waste removal.

[0043] Referring now to 402 of Figure 4A and Figure 1 A, one embodiment receives an economic shell 108 for an open pit mine location, the economic shell 108 including the locations of the ore to be obtained.

[0044] With reference now to 404 of Figure 4A and Figure IB, one embodiment accesses a geological data and mine machinery characteristic for the open pit mine location. For example, the geological data may include soil type, consistency, and the like. In addition, a mine machinery characteristic may include vehicle parameters such as, but not limited to, width, length, empty weight, operating machine weight, maximum weight, capacity, front and rear weight distribution for empty and loaded conditions, tire size, net power, gross power, width of the truck, maximum grade slope, turning radius, fuel consumption and the like.

[0045] As described herein, the geological information in conjunction with the vehicle characteristics is utilized to determine the slope information 150. In one embodiment, the slope information 150 may additionally utilize one or more default characteristics or design specific criteria. For example, the haul road ramp width 158 may be determined by a default of approximately 3.5 times the width of the widest truck to allow passing between ascending and descending vehicles. In another embodiment, such as close pits, the haul road ramp width 158 may use a single width road default width. In one embodiment, the maximum grade slope may be a 10% default.

Although a number of defaults values are provided herein, the default values are representative of one embodiment and may be adjusted in different implementations. [0046] With reference now to 406 of Figure 4A and Figures 2- 3, one embodiment utilizes a minimum amount of waste to be removed metric in correlation with a maximum amount of ore recovered metric in conjunction with the economic shell, the geological data and the mine machinery characteristic information to automatically generate an open pit mine design.

[0047] In other words, one embodiment automatically generates the open pit mine design based on the least amount of waste to be removed while obtaining a majority of the ore delineated by the economic model 108. For example, one degree of slope of road, over the life of the mine, may be worth millions or billions of dollars in waste removal costs.

[0048] In general, open pit mine designer module 330 develops a number of elevation cross section layers 175 such as shown in Figure 1 C and then links each of the layers 175 to generate the open pit mine design 200. By developing the open pit mine design 200 as a number of specific layers and then linking the layers, the open pit mine designer 300 is capable of iterating the mine design multiple times and for a number of adjustable metrics. In so doing, the mine design can be evaluated with respect to a number of different adjustable metrics, re-evaluated and updated across the life of the mine.

[0049] For example, in one embodiment, open pit mine designer 300 may make recommendations as to which vehicles may be used. For example, the open pit mine design 200 iteration can be performed for different trucks with different geometries (weight restrictions, slope restrictions, etc.) to provide a metric based evaluation for the best truck for the job thereby incurring further cost savings.

[0050] For example, by utilizing a smaller truck the resultant design would have a narrower ramp width 158, lower weight restrictions, lower slope restrictions, or the like which could reduce the amount of waste to be removed. Conversely, utilizing larger trucks would require a wider ramp width 158, higher weight restrictions and higher slope restrictions which may increase the waste to be removed, but the increase in waste may be offset by the time savings generated by the increased load capabilities. [0051] In another embodiment, the open pit mine design 200 may be revisited throughout the actual life of the mine as user modifiable information 325 is provided. One example of user adjustable criteria is the order in which the ore should be retrieved in a mixed ore mine.

[0052] For example, if a mine has a number of different ores, e.g., gold, platinum, and the like, the initial design may have been made without an initial emphasis on which ore was the higher priority but instead on the most efficient way of removing the ore. In another embodiment, the initial design may have been predicated on removing one ore in a more expedient fashion. For example, the gold may have been a primary focus due to a high gold price point.

[0053] However, in a changing market environment, such as during the time of the mine planning and the extraction process, the market may begin to show an exponential increase in the value of platinum while the gold price may be rising linearly or even becoming stagnant. As such, it would be in the extractor's best interest to adjust the mine plan to focus on extracting the platinum.

[0054] Utilizing the tools described herein, one embodiment allows a mine plan to be adjusted, or redesigned, by adjusting an existing metric or adding a new metric and then performing a mine plan redesign. For instance, in the above example, the metric that is changed is the value of the extracted ore or the importance of the ore to be extracted. In other words, whereas the previous mine design either did not place an emphasis on the extraction of one ore over another or focused on the extraction of the gold over the extraction of the platinum, the mine redesign will adjust a mine design metric to place a priority on the extraction of platinum.

[0055] In another example, the mine may be a mine that was planned according to a sampling of the platinum and gold materials in the mine. Thus, a mine with a large gold ore potential and a smaller platinum ore potential is planned with an emphasis on reaching one or more of the larger gold deposits first. However, once the gold ore is reached, for any number of reasons, it may be realized that the gold ore is not as high of a quality as initially expected. As such, the mine owners may want to change the emphasis from the gold ore to the platinum ore, thus requiring a redesign of the mine plan.

[0056] By adjusting the metric of priority as to which ore should be extracted first, the mine plan would be redesigned. In addition, the redesign would also include any changes that have been made to the area since the open pit mining had begun. For example, initially reaching the gold ore may have included the construction of haul roads, a waste storage/disposal location and a change in the topography of the mined landscape. In one embodiment, each of these metrics is also adjusted, added to, or otherwise accounted for in the open pit design during the development of the redesigned plan. Therefore, when the emphasis changes from gold to platinum, the redesigned plan not only incorporates the changes needed to access the ore, but the open pit mine designer 300 also accounts for the existing haul roads, location of the waste storage/disposal and other established metrics while updating the open pit mine design.

[0057] With reference now to Figure 4B, a flowchart 450 of a method for automatically developing a waste storage design is shown in accordance with one embodiment of the present technology. That is, utilizing the same basic functionality described herein, a waste storage design can be automatically developed based on the amount of waste to be removed in the mine design.

[0058] Referring now to 452 of Figure 4B and Figure 1A, one embodiment receives a waste material amount based on the open pit mine design. The waste material amount being a measure of the waste material that planned to be removed during the design of the open pit mine.

[0059] With reference now to 454 of Figure 4B and Figure IB, one embodiment receives geological data about the waste material as well as a storage location. For example, the waste geological data may include waste material type, consistency, and the like. In addition, storage location information may include environmental parameters such as, but not limited to: storage area fitment requirements such as length of waste pile, width of waste pile and height of waste pile; environmental impact information such as run-off areas, wildlife areas, off-limit areas; geographical information including hills, valleys and waterways; and the like.

[0060] Similarly, vehicle characteristics that will be delivering the waste may be used with waste geological information to determine the slope information for the waste pile. In general, the waste storage design is an inverse of the mine design 150. Thus, the same characteristics that were utilized in developing the mine design are also used to develop the waste storage design, e.g., bench height, berm width, slope angle, ramp width and the like.

[0061] For example, the haul road ramp width 158 may be determined by a default of approximately 3.5 times the width of the widest truck to allow passing between ascending and descending vehicles. In one embodiment, the maximum grade slope may be a 10% default. Although a number of defaults values are provided herein, the default values are representative of one embodiment and may be adjusted in different implementations. Moreover, although all of the mine design characteristics are not repeated in the waste design description, any or all of the design characteristics that are applicable to the mine design may be similarly utilized during the waste storage design.

[0062] With reference now to 456 of Figure 4B and Figures 2- 3, one embodiment utilizes the geological data and the waste amount to automatically develop a waste storage design. For example, one embodiment automatically generates the waste storage design based on the waste information delineated by the open pit mine design. Thus, in one embodiment both the open pit mine design and the waste storage design may be generated and provided to the user at almost the same time.

[0063] Similarly, any modifications to the open pit mine design may be automatically carried over to the waste storage design. For example, if an increase in the size of the open pit mine design was contemplated, the user would be able to review the associated waste storage design. This information may be economically important if the adjustment to the open pit mine design resulted in a need for a secondary waste storage location or an adjustment to the waste storage design that would require additional permissions, or the like. Area-Based Mine Design

[0064] With reference now to Figure 5, an area-based open pit mine design 500 is shown in accordance with one embodiment. In general, area-based open pit mine design refers to the user level interaction with the open pit mine designer 300. For example, suppose a user wants to develop a mine design based on diagram 100 of the economic shell 108 described in Figure 1A. By utilizing an area-based or parametric design method and system, instead of providing a level by level line and point design, the user paints or otherwise indicates the open pit mine shape 508 over the economic shell 108. The open pit mine designer 300 then automatically generates the open pit mine design level by level and point to point based on the shape 508 indicated by the user.

[0065] With reference now to Figure 6A, a flowchart 600 of a method for an area- based designing of an open pit mine is shown in accordance with an embodiment. In one embodiment, the method can be performed on a computer system such as computer system 700 described in further detail herein.

[0066] Referring now to 602 of Figure 6A and Figure 1A, one embodiment receives an economic shell 108 for an open pit mine location. As stated herein, the economic shell 108 provides a perfect world open pit mine design. In other words, the economic shell 108 only notes the type of ore deposits 109a, 109b, the ore deposit locations and a standardized slope for achieving the open pit design. Thus, the economic shell 108 illustrates what an open pit mine would look like if the ore and waste was removed without concern of how the actual ore and waste removal occurred. For example, the economic shell usually does not include haul roads, engineering criteria, geological information used to determine the actual slope, or the like.

[0067] With reference now to 604 of Figure 6A and Figure 5, one embodiment receives user parametric input denoting an open pit mine shape 508 based on the economic shell 108. For example, in one embodiment, a user paints shape 508 on the surface of the economic shell 108. Although painting is discussed herein, shape 508 may be indicated in a number of different methods. For example, the user may draw the outline of shape 508 around the economic shell 108.

[0068] In addition, although the shape 508 is discussed as being provided on the surface of the economic shell 108, as discussed in more detail herein, shape 508 may be painted at different depths ranging from the surface to the bottom or deepest layer of the economic shell 108.

[0069] Referring now to 606 of Figure 6A and Figure IB, 1C, ID and IF, one embodiment automatically generates an open pit mine design based on the parametric input in conjunction with user adjustable open pit mine design metrics. In one embodiment, the user adjustable open pit mine design metrics include metrics such as bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, switchback haul road information and the like.

[0070] Additionally, user adjustable open pit mine design metrics may include mine machinery characteristic such as truck parameters, truck geometry, a slope restriction, a weight restriction, a turning radius, a width of a haul road for a given vehicle and the like. User adjustable open pit mine design metrics may also include geological metrics such as available land, waste dump locations, ore drop locations, geological information for material around the ore, and the like which have been discussed previously. In one embodiment, the user adjustable open pit mine design metrics may be predefined or may be configured during the mine design generation.

[0071] For example, if the user paints shape 508 on the surface, open pit mine designer 300 will utilize the user painted area in conjunction with user adjustable open pit mine design metrics to generate an open pit mine design 200. That is, in one embodiment, the open pit mine designer 300 will take the shape 508 designated by the user in conjunction with mine design parameters such as bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information to automatically generate the open pit mine design from the surface down. In another embodiment, if the user paints shape 508 at the lowest point in the economic model, the open pit mine designer 300 will take the shape 508 designated by the user in conjunction with mine design parameters such as bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information to automatically generate the open pit mine design from the bottom up.

[0072] In yet another embodiment, if the user paints shape 508 at an elevation between the surface and the lowest point in the economic model, the open pit mine designer 300 will take the shape 508 designated by the user in conjunction with mine design parameters such as bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information to automatically generate the open pit mine design down and up from the defined elevation.

[0073] In one embodiment, the haul roads, such as the waste haul road 170 and ore haul road 173, and the associated haul road parameters may be automatically defined during the initial design generation of the open pit mine design. In another embodiment, the initial open pit mine design may be generated without haul roads and once a design is selected, the haul roads and haul road parameters will be

automatically added to the open pit mine design.

[0074] In one embodiment, open pit mine designer 300 additionally includes a compliance requirement to ensure proper mine design characteristics. For example, in one embodiment painted shape 508 designates the lowest point in the economic shell 108. A compliance requirement may include inflating each layer above the lowest layer 508 until the desired top elevation is reached. In so doing, the compliance requirement will ensure that the open pit mine design will have no overhangs or any other violations to the constraints established by the user-specified parameters in the design.

[0075] Thus, by utilizing the area-based design the complexity of the mine design for the user is reduced since the user designate an elevation and shape of the desired open pit mine and then the open pit mine designer 300 will automatically perform the detailed design process as shown and described herein to generate the open pit mine design.

[0076] In addition to reducing user complexity, the open pit mine design can be evaluated against user defined design objective metrics such as a minimized amount of waste to be removed, a time frame for obtaining the ore, a maximization of ore obtained, mine machinery requirements and availability, and the like.

[0077] Moreover, because of the automatic generation of the open pit mine design, in one embodiment a user can provide a number of different shapes 508 to open pit mine designer 300 and receive a similar number of different open pit mine designs 200. The user can similarly compare and contrast each of the open pit mine designs against the above stated design objective metrics to help select an appropriate open pit mine design.

[0078] With reference now to Figure 6B, a flowchart 650 of a method for

automatically developing a waste storage design is shown in accordance with one embodiment of the present technology. That is, utilizing the same basic functionality described herein, a waste storage design can be automatically developed based on user parametric input.

[0079] Referring now to 652 of Figure 6B and Figure 2, one embodiment receives a waste material amount based on the open pit mine design. The waste material amount being a measure of the waste material that planned to be removed during the design of the open pit mine.

[0080] With reference now to 654 of Figure 6B and Figure 2, one embodiment receives user parametric input denoting a waste storage shape. For example, in one embodiment, a user paints a shape similar to 508 at the desired waste storage location. Although painting is discussed herein, the shape similar to 508 may be indicated in a number of different methods. For example, the user may draw the outline of shape 508 around the economic shell 108.

[0081] With reference now to 656 of Figure 6B and Figures 2- 3, one embodiment utilizes the parametric input and the waste material amount in conjunction with user adjustable waste storage design metrics to automatically develop a waste storage design.

[0082] Examples of the user adjustable waste storage design metrics may include waste material type, consistency, and the like. In addition, user adjustable waste storage design metrics may include environmental parameters such as, but not limited to: storage area fitment requirements such as length of waste pile, width of waste pile and height of waste pile; environmental impact information such as run-off areas, wildlife areas, off-limit areas; geographical information including hills, valleys and waterways; and the like.

[0083] Similarly, user adjustable waste storage design metrics may include vehicle characteristics for vehicles that will be delivering the waste. In general, the waste storage design is an inverse of the mine design 508. Thus, the same characteristics that were utilized in developing the mine design are also used to develop the waste storage design, e.g., bench height, berm width, slope angle, ramp width and the like.

[0084] For example, the haul road ramp width 158 may be determined by a default of approximately 3.5 times the width of the widest truck to allow passing between ascending and descending vehicles. In one embodiment, the maximum grade slope may be a 10% default. Although a number of defaults values are provided herein, the default values are representative of one embodiment and may be adjusted in different implementations. Moreover, although all of the mine design characteristics are not repeated in the waste design description, any or all of the design characteristics that are applicable to the mine design may be similarly utilized during the waste storage design. [0085] Thus, in one embodiment both the open pit mine design and the waste storage design may be generated and provided to the user at almost the same time.

[0086] Similarly, any modifications to the open pit mine design may be automatically carried over to the waste storage design. For example, if an increase in the size of the open pit mine design was contemplated, the user would be able to review the associated larger waste storage design. This information may be economically important if the adjustment to the open pit mine design resulted in a need for a secondary waste storage location or an adjustment to the waste storage design that would require additional permissions, or the like.

Automatic Change Propagation

[0087] Presently, when an open pit mine is being designed and a change in design has to be made, designers are required to delete large portions of their point and line design both below and above the region where the redesign occurs and redraw/design them from scratch. In a point and line design system, this can be very time consuming and require a lot of rework every time a change is made to an existing design. The following discussion allows redesign of only the area being redesigned and the designing system then automatically propagates changes necessitated by the redesign to regions above and below (if necessary) the region of redesign.

[0088] With reference now to Figure 7A, an area-based open pit mine design 700 with a user parametric input denoting an additional area 705 to be incorporated into the open pit mine design 200 is shown in accordance with one embodiment.

[0089] In one embodiment, the additional information is painted on an underlying open pit mine design 200 such as shown in Figure 2. Figure 7 also includes an annotation 710 and an area of exclusion 715. In one embodiment, annotation 710 allows a user to provide information about the addition. For example, annotation 710 may include an explanation as to the reasoning behind the addition that has been made to the open pit mine design 200. Annotation 710 may include additional metrics, such as but not limited to, the addition designer, the addition authorizer, a cost metric for the additional area and a time line change for the additional area. [0090] In one embodiment, the area of exclusion 715 is an area within the user specified additional area 705 that covers a previously identified area. For example, the area of exclusion 715 is an underlying rule that keeps the open pit mine designer 300 from attempting to generate a new open pit mine design over an area that is already a part of the original open pit mine design.

[0091] Referring now to Figure 7B, an area-based open pit mine design 750 with a user parametric input denoting an area to be erased 770 from the open pit mine design 200 is shown in accordance with one embodiment.

[0092] In one embodiment, the deleted information is painted on an underlying open pit mine design 700 such as shown in Figure 7A. Figure 7B also includes an annotation 775. In one embodiment, annotation 775 is similar to annotation 710 of Figure 7A. That is, annotation 775 allows a user to provide information about the reason for erasure. For example, annotation 775 may include an explanation as to the reasoning behind the erasure, the erasure designer, the erasure authorizer, a cost metric for the deleted area, a time line change based on the removed area and the like.

[0093] With reference now to Figure 8A, a flowchart of a method for automatic change propagation in an area-based open pit mine design is shown in accordance with an embodiment.

[0094] At 802, one embodiment receives an open pit mine design. In one embodiment the open pit mine design is an area based open pit mine design.

[0095] At 804, one embodiment receives a user parametric input denoting an additional area to be incorporated into the open pit mine design. For example, in one embodiment, a user paints additional area 705 on the surface of open pit mine design 200. Although painting is discussed herein, additional area 705 may be indicated in a number of different computer useable area delineating methods.

[0096] One embodiment compares the user parametric input denoting the additional area 705 to be incorporated into the open pit mine design 200 with a present area of the open pit mine design and automatically limits the additional area to areas that are not part of the present area of the open pit mine design. For example, area of exclusion 715 is drawn in the additional area 705 but is already part of the mine design 200. As such, the area of exclusion 715 is ignored by open pit mine designer 300 during the generation of the modified open pit mine design. In general, by utilizing an area of exclusion 715 for overlapping areas, the user's input does not have to be as exact since any overlap is automatically ignored. In addition, the safety of the mine design 200 is not compromised during the mine design generating process. Moreover, since no overlap occurs, the evaluation metrics of the new area will not include waste materials that would have been removed based on the underlying mine design 200.

[0097] One embodiment provides an annotation field 710 related to the modified open pit mine design 700. For example, the annotation field 710 may provide information such as, but not limited to, a user reasoning for the additional area, a cost metric for the additional area and a time line change for the additional area. For example, if a new deposit of ore were found, annotation 710 may state a basic or an in-depth description of the new ore. Similarly, annotation 710 may include a monetary metric to illustrate the value of mining the additional area 705. In another embodiment, annotation 710 may provide environmental or geological reasoning for the additional area 705. By providing annotation 710, when the mine design 700 is accessed, the accessor can review any changes and have an understanding as to the purpose of the additional area 705.

[0098] At 806, one embodiment automatically propagates the additional area into the open pit mine design to generate a modified open pit mine design. In one embodiment, the user parametric input may be provided for a deepest layer of the additional area to be incorporated. In so doing, the open pit mine designer 300 will automatically propagate the additional area from the deepest depth of the additional area to a top elevation. For example, if mine design 200 were for a 1000 meter deep mine, the additional area 705 may be for an area beginning at 500m deep. Thus, in one embodiment the open pit mine designer 300 would only need to modify the mine design beginning at the 500 meter mark. The mine design below 500 meters may not need any modification.

[0099] In another embodiment, the user parametric input may be provided for a surface layer, or top layer, of the additional area to be incorporated. In so doing, the open pit mine designer 300 will automatically propagate the additional area from the surface layer.

[00100] In yet another embodiment, the user parametric input may be provided for a selected depth layer of the additional area to be incorporated. In so doing, the open pit mine designer 300 will automatically propagate the additional area in both a shallow and a deeper direction from the selected depth layer.

[00101] In another embodiment, instead of denoting an area of addition 705, the parametric input may denote a portion of the mine design to be erased. In general, the erased portion is automatically propagated through the open pit mine designer 300 to generate the modified open pit mine design 750 in a fashion similar to the addition methods and systems described herein.

[00102] In one embodiment, open pit mine designer 300 additionally includes a compliance requirement to ensure proper mine design characteristics. A compliance requirement may include inflating each layer above the lowest layer until the desired top elevation is reached. In so doing, the compliance requirement will ensure that the open pit mine redesign will have no overhangs or any other violations to the constraints established by the user-specified parameters in the design.

[00103] After generating the open pit mine design 700, the modified open pit mine design may be evaluated against design objective metrics such as, a minimized amount of waste to be removed, a time frame, a maximization of ore obtained and mine machinery availability.

[00104] Referring now to Figure 8B, a flowchart of a method for automatic change propagation in an area-based waste storage design is shown in accordance with one embodiment. That is, utilizing the same basic functionality described herein, a waste storage design can be automatically modified based on user parametric input.

[00105] At 852 of Figure 8, one embodiment receives a waste storage design. In general, the waste storage design is similar to the waste storage designs described herein and as such, the discussion is not repeated herein for purposes of clarity and brevity. [00106] At 854 of Figure 8, one embodiment receives a user parametric input denoting an additional area to be incorporated into the waste storage design. In one embodiment, a user paints additional area 705 on the surface of the waste storage design. Although painting is discussed herein, the additional area may be indicated in a number of different computer useable area delineating methods.

[00107] At 856 of Figure 8, one embodiment automatically propagates the additional area into the waste storage design to generate a modified waste storage design.

[00108] One embodiment provides an annotation field related to the modified waste storage design. For example, the annotation field may provide information such as, but not limited to, a user reasoning for the modification, environmental or geological reasoning for the modification and the like. By providing the annotation, when the waste storage design is accessed, the accessor can review any changes and have an understanding as to the purpose of any modifications that were performed on the waste storage design.

Computer System

[00109] With reference now to Figure 9, portions of the technology for providing a communication composed of computer-readable and computer-executable instructions that reside, for example, in non-transitory computer-usable storage media of a computer system. That is, Figure 9 illustrates one example of a type of computer that can be used to implement embodiments of the present technology. Figure 9 represents a system or components that may be used in conjunction with aspects of the present technology. In one embodiment, some or all of the components of Figure 1A-F or Figure 3 may be combined with some or all of the components of Figure 9 to practice the present technology.

[00110] Figure 9 illustrates an example computer system 900 used in accordance with embodiments of the present technology. It is appreciated that system 900 of Figure 9 is an example only and that the present technology can operate on or within a number of different computer systems including general purpose networked computer systems, embedded computer systems, routers, switches, server devices, user devices, various intermediate devices/artifacts, stand-alone computer systems, mobile phones, personal data assistants, televisions and the like. As shown in Figure 9, computer system 900 of Figure 9 is well adapted to having peripheral computer readable media 902 such as, for example, a floppy disk, a compact disc, and the like coupled thereto.

[00111] System 900 of Figure 9 includes an address/data bus 904 for communicating information, and a processor 906A coupled to bus 904 for processing information and instructions. As depicted in Figure 9, system 900 is also well suited to a multiprocessor environment in which a plurality of processors 906A, 906B, and 906C are present. Conversely, system 900 is also well suited to having a single processor such as, for example, processor 906A. Processors 906A, 906B, and 906C may be any of various types of microprocessors. System 900 also includes data storage features such as a computer usable volatile memory 908, e.g. random access memory (RAM), coupled to bus 904 for storing information and instructions for processors 906A, 906B, and 906C.

[00112] System 900 also includes computer usable non-volatile memory 910, e.g. read only memory (ROM), coupled to bus 904 for storing static information and instructions for processors 906A, 906B, and 906C. Also present in system 900 is a data storage unit 912 (e.g., a magnetic or optical disk and disk drive) coupled to bus 904 for storing information and instructions. System 900 also includes an optional alpha-numeric input device 914 including alphanumeric and function keys coupled to bus 904 for communicating information and command selections to processor 906A or processors 906A, 906B, and 906C. System 900 also includes an optional cursor control device 916 coupled to bus 904 for communicating user input information and command selections to processor 906A or processors 906A, 906B, and 906C. System 900 of the present embodiment also includes an optional display device 918 coupled to bus 904 for displaying information.

[00113] Referring still to Figure 9, optional display device 918 of Figure 9 may be a liquid crystal device, cathode ray tube, plasma display device or other display device suitable for creating graphic images and alpha-numeric characters recognizable to a user. Optional cursor control device 916 allows the computer user to dynamically signal the movement of a visible symbol (cursor) on a display screen of display device 918. Many implementations of cursor control device 916 are known in the art including a trackball, mouse, touch pad, joystick or special keys on alpha-numeric input device 914 capable of signaling movement of a given direction or manner of displacement. Alternatively, it will be appreciated that a cursor can be directed and/or activated via input from alpha-numeric input device 914 using special keys and key sequence commands.

[00114] System 900 is also well suited to having a cursor directed by other means such as, for example, voice commands. System 900 also includes an I/O device 920 for coupling system 900 with external entities. For example, in one embodiment, I/O device 920 is a modem for enabling wired or wireless communications between system 900 and an external network such as, but not limited to, the Internet. A more detailed discussion of the present technology is found below.

[00115] Referring still to Figure 9, various other components are depicted for system 900. Specifically, when present, an operating system 922, applications 924, modules 926, and data 928 are shown as typically residing in one or some combination of computer usable volatile memory 908, e.g. random access memory (RAM), and data storage unit 912. However, it is appreciated that in some embodiments, operating system 922 may be stored in other locations such as on a network or on a flash drive; and that further, operating system 922 may be accessed from a remote location via, for example, a coupling to the internet. In one embodiment, the present technology, for example, is stored as an application 924 or module 926 in memory locations within RAM 908 and memory areas within data storage unit 912. The present technology may be applied to one or more elements of described system 900.

[00116] System 900 also includes one or more signal generating and receiving device(s) 930 coupled with bus 904 for enabling system 900 to interface with other electronic devices and computer systems. Signal generating and receiving device(s)

930 of the present embodiment may include wired serial adaptors, modems, and network adaptors, wireless modems, and wireless network adaptors, and other such communication technology. The signal generating and receiving device(s) 930 may work in conjunction with one or more communication interface(s) 932 for coupling information to and/or from system 900. Communication interface 932 may include a serial port, parallel port, Universal Serial Bus (USB), Ethernet port, antenna, or other input/output interface. Communication interface 932 may physically, electrically, optically, or wirelessly (e.g. via radio frequency) couple system 900 with another device, such as a cellular telephone, radio, or computer system.

[00117] The computing system 900 is only one example of a suitable computing environment and is not intended to suggest any limitation as to the scope of use or functionality of the present technology. Neither should the computing environment 900 be interpreted as having any dependency or requirement relating to any one or combination of components illustrated in the example computing system 900.

[00118] The present technology may be described in the general context of computer- executable instructions, such as program modules, being executed by a computer. Generally, program modules include routines, programs, objects, components, data structures, etc., that perform particular tasks or implement particular abstract data types. The present technology may also be practiced in distributed computing environments where tasks are performed by remote processing devices that are linked through a communications network. In a distributed computing environment, program modules may be located in both local and remote computer-storage media including memory-storage devices.

[00119] All elements, parts and steps described herein are preferably included. It is to be understood that any of these elements, parts and steps may be replaced by other elements, parts and steps or deleted altogether as will be obvious to those skilled in the art.

[00120] Broadly, this writing discloses at least the following:

Automatic change propagation in an area-based open pit mine designer is disclosed. One example includes an economic shell receiver module to receive an economic shell. In addition a user input module receives a user parametric input denoting an open pit mine shape based on the economic shell. An open pit mine designer module automatically develops an open pit mine design from the user parametric input. The user input module receives an additional area to be incorporated into the open pit mine design. The open pit mine designer module automatically propagates the additional area into the open pit mine design to generate a modified open pit mine design.

This writing further describes the following:

An open pit mine designer is disclosed. One example includes a metric receiver for receiving an economic shell metric including ore information and an open pit mine metric. In addition, a user input is provided to receive user modifiable criteria. The open pit mine designer combines the open pit mine metrics, the user modifiable criteria and a waste reduction criteria to develop an open pit mine design, wherein user modifiable information may be used to adjust the open pit mine design during the life of the open pit mine.

CONCEPTS

At least the following concepts are presented in this writing:

Concept 1. A method for automatic change propagation in an area-based open pit mine design, said method comprising:

receiving, at a computer system, an open pit mine design;

receiving, at the computer system, a user parametric input denoting an additional area to be incorporated into the open pit mine design; and

automatically propagating, at the computer system, the additional area into the open pit mine design to generate a modified open pit mine design.

Concept 2. The method of Concept 1 further comprising:

providing an annotation field related to the modified open pit mine design.

Concept 3. The method of Concept 2 wherein the annotation field provides information selected from the group consisting of: a user reasoning for the additional area, a cost metric for the additional area and a time line change for the additional area.

Concept 4. The method of any one of the preceding Concepts further comprising:

erasing a portion of the additional area; and

automatically propagating, at the computer system, the erasing into the open pit mine design to generate the modified open pit mine design.

Concept 5. The method of any one of the preceding Concepts further comprising:

comparing the user parametric input denoting the additional area to be incorporated into the open pit mine design with a present area of the open pit mine design; and

automatically limiting the additional area to areas that are not part of the present area of the open pit mine design.

Concept 6. The method of any one of preceding Concepts 1-4 further comprising: receiving the user parametric input for a deepest layer of the additional area to be incoiporated; and

automatically propagating the additional area from the deepest depth of the additional area to a top elevation.

Concept 7. The method of any one of preceding Concepts 1-4 further comprising:

receiving the user parametric input for a surface layer of the additional area to be incorporated; and

automatically propagating the additional area from the surface layer to a deepest layer.

Concept 8. The method of any one of preceding Concepts 1-4 further comprising:

receiving the user parametric input for a selected depth layer of the additional area to be incorporated; and

automatically propagating the additional area in both a shallow and a deeper direction from the selected depth layer.

Concept 9. The method of any one of the preceding Concepts further comprising:

evaluating the modified open pit mine design against design objective metrics selected from the group consisting of: a minimized amount of waste to be removed, a time frame, a maximization of ore obtained and a mine machinery availability.

Concept 10. A parametric open pit mine designer with automatic change propagation comprising:

an economic shell receiver module to receive an economic shell;

a user input module to receive a user parametric input denoting an open pit mine shape based on the economic shell;

an open pit mine designer module which automatically develops an open pit mine design from the user parametric input;

the user input module to receive an additional area to be incorporated into the open pit mine design; and the open pit mine designer module automatically propagates the additional area into the open pit mine design to generate a modified open pit mine design.

Concept 11. The parametric open pit mine designer of Concept 10 further comprising:

an annotation field related to the additional area to be incorporated into the open pit mine design, the annotation field containing information selected from the group consisting of: a user reasoning for the additional area, a cost metric for the additional area, and a time line change for the additional area.

Concept 12. The parametric open pit mine designer of Concept 10 or 11 wherein the user input module limits the additional area to be incorporated into the open pit mine design to areas that are not part of the open pit mine design.

Concept 13. The parametric open pit mine designer of Concept 10, 11 or 12 further comprising:

the user input module to receive a user parametric input of a deleted area indicating a portion of area to be removed from the open pit mine design; and

the open pit mine designer module automatically propagates the deleted area through the open pit mine design to generate a further modified open pit mine design.

Concept 14. The parametric open pit mine designer of Concept 13 further comprising:

an annotation field related to the deleted area, the annotation field containing information selected from the group consisting of: a user reasoning for the deletion, a cost saving metric for the deleted area, and a time line change for the deleted area.

Concept 15. The parametric open pit mine designer of any one of Concepts 10-14 further comprising:

an open pit mine design evaluator to automatically evaluate the open pit mine design against design objective metrics selected from the group consisting of: a minimized amount of waste to be removed, a time frame, a maximization of ore obtained and a mine machinery availability. Concept 16. The parametric open pit mine designer of any one of Concepts 10-15 wherein the open pit mine designer module automatically develops the open pit mine design from the group consisting of: down from the user parametric input, up from the user parametric input and both down and up from the user parametric input.

Concept 17. A method for automatic change propagation in an area-based waste storage design, said method comprising:

receiving, at a computer system, a waste storage design for waste from an open pit mine design;

receiving, at the computer system, a user parametric input denoting an additional area to be incorporated into the waste storage design; and

automatically propagating, at the computer system, the additional area into the waste storage design to generate a modified waste storage design.

Concept 18. The method of Concept 17 further comprising:

providing an annotation field related to the modified waste storage design.

Concept 19. The method of Concept 17 or 18 further comprising:

erasing a portion of the waste storage design; and

automatically propagating, at the computer system, the erasing into the waste storage design to generate the modified waste storage design.

Concept 20. The method of Concept 17, 18 or 19 further comprising:

automatically propagating, at the computer system, the additional area into the waste storage design to generate a modified waste storage design from the group consisting of: down from the user parametric input, up from the user parametric input and both down and up from the user parametric input.

Concept 21. A method for an area-based designing of an open pit mine, said method comprising:

receiving, at a computer system, an economic shell for an open pit mine location;

receiving, at the computer system, user parametric input denoting an open pit mine shape based on the economic shell; and automatically generating, at the computer system, an open pit mine design based on the parametric input in conjunction with user adjustable open pit mine design metrics.

Concept 22. The method of Concept 21 wherein the user adjustable open pit mine design metrics comprise:

a mine machinery characteristic selected from the group consisting of: truck parameters, truck geometry, a slope restriction, a weight restriction, a turning radius and a width of a haul road for a given vehicle.

Concept 23. The method of Concept 21 wherein the user adjustable open pit mine design metrics comprise:

a geological metric selected from the group consisting of: available land, waste dump locations, ore drop locations and geological information for material around the ore.

Concept 24. The method of Concept 21 wherein the user adjustable open pit mine design metrics comprise:

an open pit mine characteristic selected from the group consisting of: bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information.

Concept 25. The method of any one of Concepts 21-24 further comprising: automatically regenerating the open pit mine design when the user adjustable open pit mine design metric is modified.

Concept 26. The method of any one of Concepts 21-25 further comprising: receiving the user parametric input for a deepest layer of the open pit mine; and automatically generating the open pit mine design from the deepest layer to a surface based on the parametric input.

Concept 27. The method of any one of Concepts 21-25 further comprising: receiving the user parametric input for a surface layer of the open pit mine; and automatically generating the open pit mine design from the surface layer to a deepest layer based on the parametric input.

Concept 28. The method of any one of Concepts 21-25 further comprising: receiving the user parametric input for a selected depth layer of the open pit mine; and

automatically generating the open pit mine design in both a shallow and a deeper direction from the selected depth layer based on the parametric input.

Concept 29. The method of any one of preceding Concepts 21-28 further comprising:

evaluating the open pit mine design against design objective metrics selected from the group consisting of: a minimized amount of waste to be removed, a time frame, a maximization of ore obtained and a mine machinery availability.

Concept 30. A parametric open pit mine designer comprising:

an economic shell receiver module to receive an economic shell;

a user input module to receive a user parametric input denoting an open pit mine shape based on the economic shell; and

an open pit mine designer module which automatically develops an open pit mine design from the user parametric input.

Concept 31. The parametric open pit mine designer of Concept 30 further comprising:

an environmental information provider to provide environmental information to the open pit mine designer module, the environmental information selected from the group consisting of: available land, waste dump locations, ore drop locations and geological information for material around the ore.

Concept 32. The parametric open pit mine designer of Concept 30 or 31 further comprising:

a user adjustable open pit mine characteristic defmer to provide slope information to the open pit mine designer module, the open pit mine characteristic selected from the group consisting of: bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information.

Concept 33. The parametric open pit mine designer of Concept 30, 31 or 32 further comprising:

a user adjustable engineering metric to provide engineering information to the open pit mine designer module, the engineering metric selected from the group consisting of: truck parameters, truck geometry and vehicle capability characteristics.

Concept 34. The parametric open pit mine designer of Concept 33 wherein the vehicle capability characteristics is selected from the group consisting of: a slope restriction, a weight restriction, a turning radius and a width of a haul road for a given vehicle.

Concept 35. The parametric open pit mine designer of any one of preceding Concepts 30-34 further comprising:

an open pit mine design evaluator to automatically evaluate the open pit mine design against design objective metrics selected from the group consisting of: a minimized amount of waste to be removed, a time frame, a maximization of ore obtained and a mine machinery availability.

Concept 36. The parametric open pit mine designer of any one of preceding Concepts 30-34 wherein the open pit mine designer module automatically develops the open pit mine design from the group consisting of: down from the user parametric input, up from the user parametric input and both down and up from the user parametric input.

Concept 37. A method for parametrically designing a waste pile, said method comprising:

receiving a waste material amount based on an open pit mine design;

receiving a user parametric input denoting a waste storage shape; and automatically generating a waste storage design based on the parametric input and the waste material amount. Concept 38. The method of Concept 37 further comprising:

automatically generating the waste storage design from the group consisting of: down from the user parametric input, up from the user parametric input and both down and up from the user parametric input.

Concept 39. The method of Concept 37 or 38 further comprising:

utilizing a mine machinery characteristic when automatically generating the waste storage design, the mine machinery characteristic information selected from the group consisting of: truck parameters, truck geometry, a slope restriction, a weight restriction, a turning radius and a width of a haul road for a given vehicle.

Concept 40. The method of Concept 37, 38 or 39 further comprising:

utilizing a geological data when automatically generating the waste storage design, the geological data selected from the group consisting of: available land, waste dump locations, ore drop locations and geological information for material around the ore.

Concept 41. The method of any one of preceding Concepts 37-40 further comprising:

receiving a user adjustable waste storage design characteristic; and

automatically regenerating the waste storage design when the user adjustable waste storage design characteristic is modified.

Concept 42. The method of Concept 40 wherein the waste storage design characteristic is selected from the group consisting of: bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information.

Concept 43. A method for designing an open pit mine, said method comprising:

receiving, at a computer system, an economic shell for an open pit mine location, the economic shell comprising the ore to be obtained;

accessing, at the computer system, a geological data and a mine machinery characteristic for the open pit mine location; and utilizing a minimum amount of waste to be removed metric in correlation with a maximum amount of ore recovered metric in conjunction with the economic shell, the geological data and the mine machinery characteristic information to automatically generate, at the computer system, an open pit mine design.

Concept 44. The method of Concept 43 further comprising:

receiving a mine metric modification; and

redesigning the open pit mine design based on said mine metric modification.

Concept 45. The method of Concept 43 or 44 wherein the geological data is selected from the group consisting of: available land, waste dump locations, ore drop locations and geological information for material around the ore.

Concept 46. The method of any one of preceding Concepts 43-45 wherein the mine machinery characteristic information is selected from the group consisting of: truck parameters, truck geometry, a slope restriction, a weight restriction, a turning radius and a width of a haul road for a given vehicle.

Concept 47. The method of any one of preceding Concepts 43-46 further comprising:

generating a plurality of individual layers, each individual layer denoting a distinct elevation portion of the open pit mine design; and

combining the plurality of individual layers to form a complete open pit mine design.

Concept 48. The method of Concept 47 further comprising:

utilizing the geological data to determine a bench height for a wall of the open pit mine design; and

utilizing the bench height to define the elevation separation distance between the plurality of individual layers.

Concept 49. The method of any one of preceding Concepts 43-47 further comprising: utilizing the mine machine characteristic in conjunction with the geological data to determine slope information comprising: a bench height; a berm width; a slope angle; and a ramp width.

Concept 50. An open pit mine designer comprising:

a metric receiving module to receive an economic shell metric including ore information and an open pit mine metric;

a user input module to receive user modifiable information; and

an open pit mine designer module which automatically combines the open pit mine metrics, the user modifiable criteria and a waste reduction criteria to develop an open pit mine design, wherein user modifiable information may be used to adjust the open pit mine design during the life of the open pit mine.

Concept 51. The open pit mine designer of Concept 50 wherein the open pit mine metrics receives metric information further comprises:

an environmental metric; and

an engineering metric.

Concept 52. The open pit mine designer of Concept 51 wherein the environmental metric is selected from the group consisting of: available land, waste dump locations, ore drop locations and geological information for material around the ore.

Concept 53. The open pit mine designer of Concept 52 wherein the slope information is selected from the group consisting of: bench height, berm width, slope angle, ramp width, stack height, stack slope, step out width, and switchback haul road information.

Concept 54. The open pit mine designer of Concept 51 wherein the engineering metric is selected from the group consisting of: truck parameters, truck geometry and vehicle capability characteristics. Concept 55. The open pit mine designer of Concept 54 wherein the vehicle capability characteristics is selected from the group consisting of: a slope restriction, a weight restriction, a turning radius and a width of a haul road for a given vehicle.

Concept 56. The open pit mine designer of any one of preceding Concepts 50-

55 wherein the economic shell metric is selected from the group consisting of: a type of an ore, a quantity of the ore and a value of the ore.

Concept 57. The open pit mine designer of any one of preceding Concepts 50-

56 wherein the user modifiable criteria is selected from the group consisting of: a mining timeline, an ore retrieval ranking, and a vehicle availability.

Concept 58. The open pit mine designer of any one of preceding Concepts 50-

57 wherein the waste reduction criteria is based on a least amount of waste to be removed while obtaining the ore in the economic shell metric.

Concept 59. A method for designing a waste pile, said method comprising: receiving a waste material amount based on an open pit mine design;

receiving geological data about the waste material and a storage location; and utilizing the geological data and the storage location in conjunction with the waste amount to automatically develop a waste storage design.

Concept 60. The method of Concept 59 further comprising:

receiving a waste material amount modification; and

redesigning the waste storage design based on the waste material amount modification.

Concept 61. The method of Concept 59 further comprising:

receiving a waste delivery vehicle characteristic; and

redesigning the waste storage design based on the waste delivery vehicle characteristic.

Concept 62. The method of Concept 59 further comprising: utilizing the waste delivery vehicle characteristic in conjunction with the geological data to determine slope information for the waste storage design comprising: a bench height; a berm width; a slope angle; and a ramp width.

Concept 63. The method of Concept 59 further comprising:

generating a plurality of individual layers, each individual layer denoting a distinct elevation portion of the waste storage design;

utilizing the bench height to define the elevation separation distance between the plurality of individual layers; and

combining the plurality of individual layers to form a complete waste storage design.