Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
CONSTRUCTION PROCESS OF PIPE PILE AND DEDICATED BORING DEVICE THEREOF
Document Type and Number:
WIPO Patent Application WO/2015/158169
Kind Code:
A1
Abstract:
A construction process of a pipe pile comprises the following steps: installing a ring-shaped pile shoe (4) provided with a cutting edge (41) on a bottom of a pipe cavity formed between a high-strength plastic outer tube (2) and a high-strength plastic inner tube (1), both the high-strength plastic outer tube (2) and the high-strength plastic inner tube (1) being high-strength plastic tubes, tensile yield strength of the high-strength plastic tubes ≥ 10Mpa, density ≥ 450kg/m3 and modulus of elasticity ≥ 350Mpa; placing the pile shoe (4) at a construction position and exerting pressure on a vibratory force application pressure head (5) so that the pile shoe (4) enters a construction foundation body together with the high-strength plastic outer tube (2) and the high-strength plastic inner tube (1); and after the pile shoe (4) completely enters a plotted position of the construction foundation body, forming the pipe pile. The pipe pile comprises the high-strength plastic outer tube (2), the high-strength plastic inner tube (1) and the pile shoe (4). Also provided is a dedicated boring device for the pipe pile.

Inventors:
XIE QINGDAO (CN)
Application Number:
PCT/CN2015/070403
Publication Date:
October 22, 2015
Filing Date:
January 09, 2015
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
XIE QINGDAO (CN)
International Classes:
E02D5/24; E02D5/38; E02D5/72
Foreign References:
CN103938619A2014-07-23
CN203782685U2014-08-20
CN103321215A2013-09-25
CN103074890A2013-05-01
CN103074891A2013-05-01
JP2014134007A2014-07-24
JP2003184078A2003-07-03
Attorney, Agent or Firm:
WENZHOU OUYUE PATENT AGENTS CO.,LTD (CN)
温州瓯越专利代理有限公司 (CN)
Download PDF: