Title:
IMPROVED DREDGED SOIL COMPRISING STEELMAKING SLAG, AND TEMPORARY ROAD USING SAME
Document Type and Number:
WIPO Patent Application WO/2019/117415
Kind Code:
A1
Abstract:
The present invention relates to improved dredged soil comprising steelmaking slag, and a temporary road using the same and, more specifically, to: improved dredged soil comprising 40-60 wt% of dredged soil and 40-60 wt% of steelmaking slag; a temporary road manufactured using the same; and a method for manufacturing the temporary road.
Inventors:
JEONG YONG-SOO (KR)
JANG HAN-SOO (KR)
KIM HYUNG-SUEK (KR)
KIM HYUN (KR)
PARK HEON-WOO (KR)
JANG HAN-SOO (KR)
KIM HYUNG-SUEK (KR)
KIM HYUN (KR)
PARK HEON-WOO (KR)
Application Number:
PCT/KR2018/008092
Publication Date:
June 20, 2019
Filing Date:
July 17, 2018
Export Citation:
Assignee:
RES INST IND SCIENCE & TECH (KR)
International Classes:
C04B18/04; C04B18/14; E01C7/10; C04B111/00
Foreign References:
JP2014000560A | 2014-01-09 | |||
JP2012031618A | 2012-02-16 | |||
KR20130018301A | 2013-02-20 | |||
JP2016124772A | 2016-07-11 | |||
JP2007239258A | 2007-09-20 |
Attorney, Agent or Firm:
C&S PATENT AND LAW OFFICE (KR)
Download PDF: