Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
IMPROVEMENTS RELATING TO VOLTAGE CONTROL IN WIND POWER PLANTS
Document Type and Number:
WIPO Patent Application WO/2019/052614
Kind Code:
A1
Abstract:
A renewable energy power plant comprising a plurality of renewable energy generators and a control system for controlling the power output of the plurality of renewable energy generators, a power network connecting those renewable energy generators to a Point of Interconnection (PoI) with which the power network is connected to an external power grid, and measurement means configured to measure electrical parameters associated with the Point of Interconnection, wherein the control system is configured to: operate each renewable energy generator to achieve a respective current level at a terminal of the generator that is equal to a current set point; implement, during a grid fault event, a feedback control routine in which the control system: determines a measured value of an electrical parameter at the Point of Interconnection, determines a target value of the electrical parameter; and modifies the current set point based on the measured value and the target value of the electrical parameter.

Inventors:
GUPTA MANOJ (SG)
SIVASANKARAN JANAKIRAMAN (SG)
CHRISTENSEN LEIF SVINTH (DK)
Application Number:
PCT/DK2018/050217
Publication Date:
March 21, 2019
Filing Date:
September 03, 2018
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
VESTAS WIND SYS AS (DK)
International Classes:
H02J3/16; F03D7/02; F03D7/04; H02J3/38; H02J3/00; H02J3/50
Foreign References:
US20160134121A12016-05-12
US20160322821A12016-11-03
US20100268393A12010-10-21
Other References:
None
Download PDF:
Claims:
CLAIMS

1. A renewable energy power plant comprising a plurality of renewable energy generators and a control system for controlling the power output of the plurality of renewable energy generators, a power network connecting those renewable energy generators to a Point of Interconnection (Pol) with which the power network is connected to an external power grid, and measurement means configured to measure electrical parameters associated with the Point of Interconnection, wherein the control system is configured to: operate each renewable energy generator to achieve a respective current level at a terminal of the generator that is equal to a current set point; implement, during a grid fault event, a feedback control routine in which the control system: determines a measured value of an electrical parameter at the Point of Interconnection, determines a target value of the electrical parameter; and modifies the current set point based on the measured value and the target value of the electrical parameter. 2. The renewable energy power plant of Claim 1 , wherein, during the grid fault event, the control system operates each renewable energy generator to achieve a respective current level at a terminal of the generator that is equal to the modified current set point. 3. The renewable energy power plant of Claim 2, wherein, during the grid fault, the control system determines whether the measured value of the electrical parameter is substantially equal to the target value of the electrical parameter, and, if it is determined that the measured value of the electrical parameter is not substantially equal to the target value of the electrical parameter, repeats the feedback control routine.

4. The renewable energy power plant of Claim 3, wherein the control system repeats the feedback control routine until the measured value of the electrical parameter is equal to the target value of the electrical parameter.

5. The renewable energy power plant of any preceding claim, wherein the control system comprises a plurality of renewable energy generator controllers, each one of the renewable energy generator controllers being associated with a respective renewable energy generator or group of renewable energy generators,

6. The renewable energy power plant of Claim 5, wherein each one of the renewable energy generator controllers is configured to modify the current set point for its respective renewable energy generator or generators, 7. The renewable energy power plant of any preceding claim, wherein, during a grid fault event, the control system calculates a correction factor and modifies the current set point using the correction factor.

8. The renewable energy power plant of Claim 7, wherein the calculation of the correction factor comprises the calculation of a ratio between the measured value and the target value of the electrical parameter,

9. The renewable energy power plant of Claim 7 or Claim 8, wherein, during a grid fault event, the control system modifies the current set point based on a directional component and the calculated correction factor, wherein the directional component indicates the direction in which the correction factor should be applied.

10. The renewable energy power plant of any preceding claim, wherein the electrical parameter is active current output level or reactive current output level.

1 1. The renewable energy power plant of any preceding claim, wherein, during a grid fault, the control system determines a voltage level of the grid and determines a target value of the electrical parameter based on the determined voltage level.

Description:
IMPROVEMENTS RELATING TO VOLTAGE CONTROL IN WIND POWER PLANTS

TECHNICAL FIELD The present invention relates to a method of controlling a renewable energy power plant, a renewable energy power plant controller, and to a wind turbine power plant and to renewable energy power plants more generally.

BACKGROUND

Newly commissioned renewable power plants, and more particularly wind power plants, are expected to be able to operate and adapt to a number of different circumstances when connected to a power network. A wind power plant typically comprises a plurality of wind turbine generators and is also known as a wind park or a wind farm. The regulation and general operation of the power plant is controlled by a power plant control system or controller (PPC), which implements operational limits and requirements as set out by a Transmission System Operator (TSO) or in country- specific grid interconnection requirements or 'grid codes'. The TSO also communicates power delivery demands to the PPC, including reactive current delivery demands.

Grid codes commonly include specific requirements for reactive and/or active current supply during a fault. These requirements ensure that the network is fully supported throughout the fault and that voltage level recovery is sustained by the active and/or reactive current supplied by the wind power plant or plants.

Recently, due to an increase in the number of wind power plants connected to national grids, grid code requirements have specified current supply levels at a Point of Interconnection (Pol) between the grid and the power plant. Previously, current supply levels were specified at each terminal of the individual wind turbine generators in a power plant. This allows for distributed current generation and flexibility in how the current is supplied to the grid by the power plant. However, it also often results in grid code requirements not being met during faults. The reason for this is due to the wind turbine generators continuing to act as autonomous current sources that are decoupled from the control of the PPC during the fault, despite the requirements being specified for the Pol. Ιΐ is an aim of the present invention to overcome this problem. SUMMARY OF THE INVENTION

According to an aspect of the invention, there is provided a renewable energy power plant comprising a plurality of renewable energy generators and a control system for controlling the power output of the plurality of renewable energy generators, a power network connecting those renewable energy generators to a Point of Interconnection (Pol) with which the power network is connected to an external power grid, and measurement means configured to measure electrical parameters associated with the Point of interconnection, wherein the control system is configured to: operate each renewable energy generator to achieve a respective current level at a terminal of the generator that is equal to a current set point; implement, during a grid fault event, a feedback control routine in which the control system: determines a measured value of an electrical parameter at the Point of Interconnection, and determines a target value of the electrical parameter; modifies the current set point based on the measured value and the target value of the electrical parameter. Incorporating a control system as described above allows a set point to be achieved through feedback alone, without a reliance on look-up tables, complex calculations, complex modelling or predetermined values. The control system is particularly useful as it matches the output level of the renewable energy generators to a target value at the Pol, where there may not be a direct correlation between these values. Thus, a target value can be achieved at the Pol quickly and without complex calculations during a grid fault.

An additional benefit is that the renewable power plant can comply with specific requirements set out for grid faults by a grid code or other regulatory system. By complying with grid code requirements, the power plant is less likely to be disconnected from the grid during the fault.

During the grid fault event, the control system may operate each renewable energy generator to achieve a respective current level at a terminal of the generator that is equal to the modified current set point. During the grid fault, the control system may determine whether the measured value of the electrical parameter is substantially equal to the target value of the electrical parameter.

If it is determined that the measured value of the electrical parameter is not substantially equal to the target value of the electrical parameter, the control system may repeat the feedback control routine, The control system may repeat the feedback control routine until the measured value of the electrical parameter is equal to the target value of the electrical parameter.

Advantageously, comparing the measured and target values of the electrical parameter allow for a continued iteration of the method until the set point yields a measured value that is sufficiently similar to the target. This ensures that grid code requirements are complied with.

The control system may comprise a plurality of renewable energy generator controllers. Each one of the renewable energy generator controllers may be associated with a respective renewable energy generator or group of renewable energy generators. A plurality of renewable energy generator controllers allows the functionality required to be distributed, resulting in faster processing for each individual generator of the plurality. Each one of the renewable energy generator controllers may be configured to modify the current set point for its respective renewable energy generator or generators.

During a grid fault event, the control system may calculate a correction factor. The control system may modify the current set point using the correction factor.

The calculation of the correction factor may comprise the calculation of a ratio between the measured value and the target value of the electrical parameter. Using a ratio ensures that the error is quantified and used to implement the feedback control. During a grid fault event, the control system may modify the current set point based on a directional component and the calculated correction factor. The directional component may indicate the direction in which the correction factor should be applied. The electrical parameter may be active current output level. The electrical parameter may be reactive current output level. Advantageously, the invention may therefore be used to calculate active current and reactive current set points at the generators so as to achieve active current output level and reactive current output level at the Pol respectively. This is particularly useful during a grid fault, where grid codes specify target levels for both active current output and reactive current output at the Pol, but not at the generators.

During a grid fault, the control system may determine a voltage level of the grid. The control system may determine a target value of the electrical parameter based on the determined voltage level.

Within the scope of this application it is expressly intended that the various aspects, embodiments, examples and alternatives set out in the preceding paragraphs, in the claims and/or in the following description and drawings, and in particular the individual features thereof, may be taken independently or in any combination. That is, all embodiments and/or features of any embodiment can be combined in any way and/or combination, unless such features are incompatible. The applicant reserves the right to change any originally filed claim or file any new claim accordingly, including the right to amend any originally filed claim to depend from and/or incorporate any feature of any other claim although not originally claimed in that manner,

BRIEF DESCRIPTION OF THE DRAWINGS

One or more embodiments of the invention will now be described, by way of example only, with reference to the accompanying drawings, in which:

F gure 1 is a schematic view of a power network including a wind power plant and a main grid according to an embodiment of the invention; Figure 2 is a chart outlining active current as a function of voltage when measured at the Point of interconnection and when measured at the terminal of a wind turbine generator;

Figure 3 is a chart outlining reactive current as a function of voltage when measured at the Point of Interconnection and when measured at the terminal of a wind turbine generator;

Figure 4 is a flow chart illustrating a process governing the operation of a wind turbine generator according to an embodiment of the invention;

Figure 5 is a flow chart illustrating a series of calculations performed during the process of Figure 4;

Figure 8 is a schematic diagram of the flow of information within a power network according to the process of Figure 4;

Figure 7 is a chart outlining an example case in which active currents at the Point of interconnection and wind turbine generator are altered according to the process of Figure 4; and

Figure 8 is a chart outlining an example case in which reactive currents at the Point of interconnection and wind turbine generator are altered according to the process of Figure 4,

DETAILED DESCRIPTION

Figure 1 illustrates a typical architecture in which a wind power plant (WPP) is connected to a main transmission grid as part of a wider power network. The example shown is representative only and the skilled reader will appreciate other specific architectures are possible, in relation to both wind power plants and power plants for other renewable energy sources, in addition, the skilled reader will appreciate that methods, systems and techniques also described below may be applicable to many different configurations of power network. Moreover, the components of the wind power plant and power network are conventional and as such would be familiar to the skilled reader.

Figure 1 shows a power network 10 incorporating a wind power plant (WPP) 12 including a plurality of wind turbine generators 14 (WTGs) often more commonly called 'wind turbines'. A single wind turbine would also be possible. Each of the plurality of WTGs 14 converts wind energy into electrical energy, which is transferred from the WTGs 14 to a main transmission power network 16 or main grid, as active current, for distribution. A collector network 17 extends between the W'PP 12 and the main grid 18.

WTGs 14 generate both active current and reactive current. The main grid 16 often has specific active and reactive current requirements with which the WPP 12 is required to comply, and the output of the WTGs 14 can be changed to match these requirements in real time. In particular, grid requirements specify current levels required to support voltage levels of the main grid 16 during a grid fault, and the output of WTGs 14 can be manipulated to meet these. The method and system described herein according to embodiments of the invention act to ensure that the output of the WTGs 14, and hence the WPP 12, is sufficient to overcome impedances in the system 10 between the grid 16 and the WTGs 14 and to supply a required and correct amount of current as necessary. The method and system implement a closed feedback system that may be applied to any renewable energy power plant or network without a requirement for highly specific calculations of the actual impedances present. The methods and systems are described herein deliver a precise amount of reactive or active current swiftly.

Returning to Figure 1 , each of the WTGs 14 of the WPP 12 is connected to a local grid (not shown) that links the WTGs 14. The WPP 12 is, in turn, suitably connected to a collector bus 18 via a feeder line 20. The collector bus 18 may be at an intermediate voltage level that is suitable for relatively short distance power transmission, for example in the region of 10 kV to 150 kV, most usually between 1 10 kV and 150 kV. The collector bus 18 may also provide a point of common coupling (PCC) for a plurality of wind power plants, although, only a single WPP 12 is shown here for simplicity.

The collector bus 18 is connected to a main step-up transformer 22 by a transmission line 24. The main transformer 22 is in turn connected to the main grid 16 at a Point of Interconnection (Pol) 26 by another transmission line 28, The Pol 26 is an interface between the WPP 12 and the main grid 16.

While the collector bus 18 may be required to span distances up to around 100km, the main grid 16 may be an international, national, or regional grid such as the National Grid of Great Britain, for example, and therefore may be required to span distances of up to around 250km or more. Accordingly, the voltage level of the main grid 16 may be much higher than the voltage level of the collector bus 18 for better transmission efficiency,

The connecting lines such as the transmission and feeder lines 20, 24, 28 may each include a protection system 30 to protect individual components from damage during or following extreme conditions. For example, it is envisaged that at least an appropriate circuit breaker will be included in each line,

Hereinafter, it should be assumed that references to components being connected or connections between components comprise suitable feeder or transmission lines as described above unless it is otherwise indicated, A Power Plant Controller (PPC) 32 is connected to the power network 10 at a Point of Measurement (PoM) 34 and is also connected directly to the WPP 12. The role of the PPC 32 is to act as a command and control interface between the WPP 12 and a grid operator or transmission system operator (TSO) 36. The TSO 36 is responsible for indicating the needs and requirements of the main grid 16 to the PPC 32, The PPC 32, in its role as command and control interface, interprets the power delivery demands requested of it by the TSO 36 and manages the wind turbines 14 in the WPP 12 in order to satisfy those requirements, whilst taking into account other operative factors such as grid faults and sudden changes in output or measured grid voltage. The PPC 32 is a suitable computer system for carrying out the controls and commands as described above and so incorporates a processing module 38, a connectivity module 40, a memory module 42 and a sensing module 44.

In order to monitor and regulate the output of the WPP 12 and to interpret the power demands correctly, the PPC 32 is connected to the transmission line 28 between the main transformer 22 and the Pol 26 at the PoM 34. The PPC 32 is equipped to measure a variety of parameters including a representative power output that will be supplied to the main grid 16 at the Pol 26 by the WPP 12. As the PoM 34 is not at the Pol 26, the measured parameters are only representative as losses in the lines between the PoM 34 and Pol 26, and between the PoM 34 and the PPC 32, may have an effect on the measurements. Suitable compensation may take place to account for the losses to ensure that the measurements are accurate.

In addition, the PPC 32 measures parameters of the power output such as a frequency and voltage, as well as reactive current exchange between the WPP 12 and the main grid 16 and the voltage level of the main grid 16. The PPC 32 compares the measured parameters against specific grid requirements and communicates control commands to specific components of the WPP 12 accordingly. The WPP 12 is capable of altering its reactive current output in reaction to commands received from the PPC 32.

The PPC 32 communicates control commands to the turbines 14 in a suitable manner. It will be noted that Figure 1 is a schematic view, so the way in which the control commands are transferred to the turbines 14 is not depicted explicitly. However, it will be appreciated that suitable cabling may be provided to interconnect the PPC 32 and the turbines 14. The interconnections may be direct or point to point' connections, or may be part of a local area network (LAN) operated under a suitable protocol (CAN- bus or Ethernet for example). Also, it should be appreciated that rather than using cabling, the control commands may be transmitted wirelessly over a suitable wireless network, for example operating under WiFi™ or ZigBee™ standards (IEEE802.11 and 802.15.4 respectively).

The diagram of Figure 1 should only be taken as a representation of a power network. Alternative configurations of power network and power plants are known and it is expected that other known components may be incorporated in addition to or as alternatives to the components shown and described in Figure 1. Such changes would be within the capabilities of the skilled person. For example, substations or extra transformers would be expected to be incorporated in the wind power plant depending upon the number of turbines included in the plurality of wind turbines. In some embodiments, the PoM 34 may be positioned at a different position in the system such that the parameters measured by the PPC 32 are not representative of the actual values for those parameters at the Pol 26 and the values may differ. In this case, a correction factor may be applied to the measurements to adjust for the different position of the PoM 34 relative to the Pol 26. It therefore does not matter where the PoM 34 is located with regard to the Pol 26, so long as there is a predetermined correction factor. Therefore, the measured voltage may be indicative of, or associated with, the voltage at the point of interconnection, even if the voltage is not measured directly at that location.

For the purposes of the present application, it is assumed that the PoM 34 is at same location as the Pol 26, and subsequent references to measurements will only be made with reference to the Pol 26. It will be appreciated, as discussed above, that the PoM 34 may be positioned at a different position and the difference in magnitude of each measurement due to this different position may be accounted for with a correction factor without affecting the operation of the system.

As described above, the WPP 12 must comply with a set of grid requirements specific to the main grid 16. In particular, the operation of the PPC 40 and WPP 12 in reaction to a grid fault is especially important and requires careful control of voltage and power outputs to fulfil grid requirements and to support the grid 16 to enable an efficient recovery to normal operating levels.

As will be understood by the skilled person, a grid fault is generally defined as a period in which the voltage level of the grid 16 or wider power network drops to a level outside the accepted and normal operational bounds. During a grid fault, the WPP 12 in a low- voltage ride through (LVRT) mode to avoid disconnection of the WPP 12 from the grid 16 and to support the grid 16 through the fault. If the WPP 12 is disconnected from the grid 16, it will be more difficult for the grid 16 to recover from the fault due to the loss of voltage generation that it received from the WPP 12. In the LVRT mode, the W'PP 12 supports the grid 16 during the fault by supplying reactive current to encourage a rise in voltage levels. The WPP 12 is required to supply reactive current until the voltage levels have returned to levels that are within a normal operating band. In many circumstances, this operating band is between voltage levels of 0,9 pu to 1.1 pu. In LVRT mode, the VVTGs 14 of the WPP 12 act autonomously, controlled by WTG controllers (not shown), and are not controlled by the PPC 32. The VVTGs 14 control their active and reactive current outputs based on the voltages across their individual terminals, and based upon grid requirements. However, the grid requirements for active and reactive current are specified at the Pol 26, and not for individual VVTGs 14, so a difference exists between the measured active or reactive current output across the WTG terminal and the measured ouput at the Pol 26 due to impedance of the collector network 17 between the terminal and the Pol 26. Examples of this are shown in the charts 200, 300 of Figures 2 and 3 for active current and reactive current respectively. Each chart 200, 300 shows the grid requirement along with a typical corresponding WTG 14 output that is required to achieve the grid requirement. In other words, in Figure 2, it can be seen that the grid requirement for active current output at the Pol 26 is 1 per unit (p.u) active current at ail voltage levels between 0.05 p.u. and 0.9 p.u. To achieve these active current output levels at the Pol 26, the WTG 14 must produce a varying amount of active current that increases with increasing voltage. So, if the measured voltage is 0.4 p.u., the grid requirement active current level is 1 p.u., and to achieve this level, the output active current from the WTG 14 must be 0.808 p.u.

As would be understood by the skilled person, per-unit voltage is an expression of the voltage with respect to a base value which is used as a reference. Using a per-unit system allows for normalization of values across transformers and other components that may change the value by an order of magnitude.

Similarly, Figure 3 illustrates that the grid requirements for reactive current output level at the Pol 26 is a linear relationship between 0.8 p.u. reactive current at 0.2 p.u. voltage and 0.1 p.u reactive current at 0.9 p.u. voltage. The corresponding WTG requirement extends between 1.1 14 p.u. and 0.252 p.u. So, for a measured voltage level of 0.4 p.u, the reactive current level required by the grid requirements is 0.6 p.u., and the WTG 14 must supply 0.841 p.u. reactive current. It will be appreciated, however, that the WTG output levels illustrated in Figures 2 and 3 are for example only, and in reality, collector networks 17 between the Pol 28 and the WTG terminals for different systems may vary highly depending upon the type of components incorporated into the network, the interconnection type between the grid 18 and the WPP 12, the quality of the components incorporated, the quality of the power incorporated, the age of the network, and the grid type.

To achieve the correct levels at the Pol 28 according to the grid code, conventional practice is to simulate the operation of the WPP 12 and collector network 17, and to use these simulations to specify WTG output levels. In some practices, it is also conventional to validate these simulations with on-site measurements. This results in a particularly costly and difficult process that is not guaranteed to give the required accuracy. In some instances, the calculated WTG output levels may be wrong if a small change is made to the collector network 17.

If the WTG output levels calculated for meeting the grid requirement levels are incorrect, the output at the Pol 28 may fail short of the levels specified by the grid requirements, and so the W ; PP 12 may not support the grid 16 satisfactorily during the fault. This may result in disconnection of the WPP 12.

To ensure that in LVRT mode the W Gs 14 operate to support the grid 16 sufficiently, a control method according to the invention may be implemented, in which reactive and active current levels at the Pol 26 are in a closed feedback loop to iterativeiy align the Pol output levels and the WTG output levels.

Figure 4 shows a flow chart illustrating a control method 400 according to the invention governing automatic feedback of active or reactive current output levels at the Pol 26 to an individual WTG 4 to tailor the WTG output to ensure grid requirements are met at the Pol 26. The method 400 is applicable to both reactive current feedback and active current feedback, and is the same for each, although for clarity the flow chart shown in Figure 4 will only be described in relation to active current.

Initially, having entered the LVRT mode, the WTG 14 is controlled 402 by a WTG controller (not shown) to output active current according to a predetermined current set point. The predetermined current set point may be a nominal value such as 0.5 p.u. for all voltage levels. Furthermore, the set point may be particular to each generator, or may initially be a universal reference level at which all generators operate having entered LVRT mode. It will be appreciated that the set points of the generators will subsequently differ, as will be explained below. As used here, the term set point has its ordinary meaning of a 'process' or 'target' variable/value with reference to which a system is controlled by a suitable control algorithm to meet that target value.

In the step 404 following control 402 of the WTG 14 to output the active current, the actual active current and the required active current are identified. The step of identifying the actual active current comprises measuring 406 the actual active current level at the Pol 26 due to controlling the WTG 14 to output active current at the predetermined current set point. Identifying the required active current comprises determining 408 the active current level specified by the grid requirements that corresponds to a particular voltage level at the Pol 26. It is envisaged that to determine 408 required active current, the voltage at the Pol 26 would first be measured, and then being compared with a look-up table to establish the correct required active current level. These steps of measuring 406 the active current at the Pol 26 and determining 408 the required active current at the Pol 26 are shown in Figure 4 as being performed simultaneously, although it will be appreciated that they may be performed in any order.

Following the measurement of actual active current and determination of required active current at the Pol 26, the actual and required currents are compared 410 by a comparator (not shown) at the Pol 26. The comparison seeks to identify deviation of the actual current level from the required current level and to quantify the change in both the current set point and the output of the WTG 14 required to meet the required current level as specified by the grid requirements.

Subsequently, the comparison of the actual and required current is communicated 412 to the WTG controller, which then generates 414 a new current set point for the next iteration of the method based on the comparisons performed by the comparator and also based on calculations performed either by the comparator or by the WTG controller. The new current set point replaces the previous current set point, it will be appreciated that current set points are here generated per WTG 14, so that current set points may not be similar between WTGs 14. The WTG 14 is then controlled 416 by the WTG controller to output active current according to the generated new current set point, and the process returns to the steps 404 of measuring 406 actual active current and determining 408 required active current at the Pol 26 to further refine the current set point so that grid requirements are met during the fault.

Now considering the steps of the method 400 of Figure 4 in more detail, Figure 5 shows a flow chart 500 illustrating a series of comparisons and calculations that may be undertaken by the comparator and WTG controller to generate new WTG current set points. The flow chart 500 of Figure 5 corresponds to steps 410 and 414 of the method 400 of Figure 4. It is assumed that the actual and required active current levels have already been identified 404 by the comparator. At the first step 502 of the calculation process of Figure 5, the active current level, lactuai, and required current level, Inquired, are compared to calculate a ratio, r, of the actual current level to the required current level, such that r - lactuai / I required-

It will be appreciated that the difference between the active current level and the required current level is the error present at the Pol 26 and that this cannot be used to directly correct the wind turbine current set point as the two values are not proportionally linked. Thus, a ratio is calculated to provide a weighting to the current iteration of the set point. Having calculated the ratio of actual current level to the required current level, the process 500 then calculates 504 the product, p, of the ratio, r, and the set point for the current iteration of the method that the WTGs 14 are being controlled to supply, /„. Thus, p = rln. As demonstrated, the ratio therefore provides a weighting value for weighting the current set point relative to the error between the actual and required current levels. A ratio that is dose to 1 indicates that the error is small, and so the current set point weighting is small as only a small amount of correction is required to bring the current set point in line with the desired value. Conversely, a ratio close to 0 indicates a need for a large weighting to effect a greater change in the magnitude of the set point. The difference, cf, between the product, p, and the current set point, /„, is then calculated 508, such that d = p - /„.

By calculating the product of the set point and the ratio and then finding the difference between the product and the current set point, an actual magnitude for correction of the set point can be obtained.

At the next step 508, a comparison between the measured current and required current is used to determine the new current set point. This step 508 determines the direction in which the correction calculated at step 506 is to be applied, and so may be considered to constitute a directional component.

If the measured current is less 510 than the required current, then the previous current set point is superseded 512 by a new current set point, /„+?, for use in the next iteration of the method. The new set point is calculated as being the magnitude of the difference between the difference, d, and the current set point, /„, of the previous iteration of the method of Figure 4. So, new set point /,,+? = d - i n in this case.

If the measured current is greater 514 than the required current, then the previous current set point is overwritten 516 with a new current set point, !„+?, that is calculated as being the magnitude of the difference between the previous current set point, /,·, and the difference, d. So, new set point /,·,÷? = \ l n - d\ in this case.

This could therefore be written as follows:

, _ i l' I actual ^required

'n+1 — 1 I f _ j I S

I'K u \> 'actual Ί required where d = r(i,~, - 1), p = ri n , r = I actual / Inquired, and /„ is the reference set point from which the measured value of l ac tuai resulted.

As per Figure 4, the WTGs 14 are then controlled 416 to output active current according to the new current set point, /„ ÷ ·;. The calculations are then performed again, with In being set as /„+? and a new current set point, l n +i, being generated 414. It is envisaged that the process 500 of Figure 5 may incorporate a step to check if the measured current and required current are equal. If this is the case, the WTG 14 will continue to be controlled 416 to output active current according to the latest current set point until the voltage level changes or a difference between the measure current and required current occurs.

To summarise, the method 400 performs a series of calculation steps 502, 504, 506, 508 having initially determined 406, 408 measured values and target values of a desired electrical parameter such as active current output or reactive current output to the grid 16. The calculation steps 502, 504, 506, 508 are also considered to be comparison 410 and generation 414 steps of a current set point. When considered in another way, the calculation steps 502, 504, 506, 508 may be considered to be implemented to indirectly calculate the error, the amount by which the measured value is required to change to reach the target value, the biasing value needed to change the output of the each WTG 14 and the direction in which the change is needed. In general, these steps 502, 504, 506, 508 can be considered as a single step to be the calculation of a correction factor. It will be appreciated that this correction factor is not merely a calculation of error by basic subtraction, as the measured and target values do not necessarily correspond to the outputs from each WTG 14.

The steps of the method 500 of Figure 5 may be calculated at either the WTG controller or at the Pol 26. in an embodiment, the calculation 502 of the ratio, and the comparison 508 of measured current and required current to determine if measured current is greater than or less than required current are performed at the comparator at the Pol 26. The results 518, 520 of these steps 502, 508 are passed to the WTG controller, and the steps of calculating 504, 506, 512, 516 the product, difference and new current set point are performed by the WTG controller.

The process of Figures 4 and 5 are illustrated with reference to a power network 600 in Figure 6. The schematic diagram of Figure 6 illustrates a power network 600 incorporating a WTG 14 comprising a WTG controller 602, the PoC 26 and the collector network 17 that extends between the WTG 14 and the PoC 26.

As shown, the collector network 17 incorporates components 604 having impedances, such as cables 606, substation transformers 608 or power plant transformers 610, for example, A current output 612 from the WTG 12 travels via the collector network 17 to the PoC 26, where a measurement 614 is made resulting in a value for an actual current level, factual. At the PoC 26, the grid code requirements 616 provide the required current level, Inquired, to the comparator 618. In this embodiment, the comparator 618 prepares both the ratio 620 from step 502 of Figure 5 and the analysis 622 of whether the measured, actual current level, ctuai, is less than the required current level, Inquired, as found in step 508 of Figure 5.

These values 620, 622 are passed from the PoC 26 to the WTG controller 602, where, according to steps 504, 506 and 5 0 to 516 of the method 500 of Figure 5, calculations 624, 626, 628 for the product of the ratio and current set point, the difference between the product and current set point and the new WTG current set point, /„+*, are calculated using the outputs 620, 622 of the comparator 618 and the input previous WTG current set point, /„.

The WTG controller 602 outputs the new, altered set point, /,,+?, and controls the WTG 14 to output current according to the altered set point The process 600 then repeats with a new measurement 614 at the PoC 26. Figures 7 and 8 illustrate test examples 700, 800 illustrating implementations of the methods 400, 500 of Figures 4 and 5 for active current and reactive current respectively.

Figure 7 shows an example implementation 700 of the methods 400, 500 of Figures 4 and 5 for active current correction at a voltage level of 0.05 p.u. As can be seen from Figure 2, the required active current level for 0.05 p.u. voltage is 1 p.u. active current.

So, I required ~ 1■

In Figure 7, the control method 400 of Figure 4 is first implemented after 1 second, and in accordance with the first step 402 of Figure 4, begins with the WTG 14 being controlled at a nominal set point, l n , of 0.5 p.u. This results in an actual current level measured at the Pol 26 of 1.493 p.u. according to the second step 406 of the method 400 of Figure 4. The required active current level has been determined 408, as described above, as being 1 p.u. active current for a voltage level of 0.05 p.u. voltage. Therefore, for the first iteration, ctuai ~ 1.493, and so the ratio, r, of measured active current level to required active current level, as calculated using the first step 502 of the method 500 shown in Figure 5, is 1.493 as:

(1) r = 1.493/1 = 1,493.

According to the second step 504 of the method 500 of Figure 5, the product, p, is calculated as 0.746 as:

(2) p = 1.493 * 0.5 = 0.746.

According to the third step 508 of the method 500 of Figure 5, the difference, d, is calculated as 0.246 as:

(3) d = 0.746 - 0.5 = 0.246.

At the fourth step 508 of the method 500 of Figure 5, it is determined that the measured current level is greater than 514 the required current level:

(4) I actual I required «i 1.493 > 1.

So, at the final step 516 of the method 500 of Figure 5, the new current set point, l n +i, is calculated and set as being the magnitude of the difference between the difference, d, and the set point, /„. Therefore, the new current set point is 0.254 as: (5) l n +i = \ In - d\ = \ 0.5 - 0.246 \ = \ 0.254 \ ^0.254.

As can be seen from the chart 700 of Figure 7, the time elapsed between the process controlling the WTG 14 at the first set point of 0.5 p.u. active current and the calculations the methods 400, 500 of Figures 4 and 5 being carried out is 0.02 seconds. At the second measurement point, the WTG set point, /„, is set as 0.254 p.u. active current. This results in a measured active current level at the Pol 26 of 0.757 p.u. active current. Again following the steps of the methods 400, 500 of Figure 4 and 5, the new set point, ln+i, is calculated to be 0.315 p.u. active current. The calculations performed are as follows:

(1) r = 0.757/1 = 0.757

(2) p = 0.757 " 0.254 = 0. 192

(3) d = 0. 192 - 0.254 = -0.062.

(4) ! actus! < i required 3S 0.757 < 1

(5) l n +i = \ d - 1„ I = I -0.062 - 0.254 \ = ! -0.315 ^0.315

The calculation of each set point approaching the correct value of 0.335 p.u. active current can be followed through in a similar fashion. Each iteration is outlined in Table 1 below, including the two iterations already worked through above. I required = 1 for ail iterations.

As can be seen from Table 1 , within 4 iterations the set point output to the WTG 14 has been refined such that the measured actual active current level at the Pol 26 is equal to the required active current level specified by the grid requirements.

From the chart 700 of Figure 7, it can also be seen that the time taken to perform 4 iterations and to achieve an active current level at the Pol 26 that is the same as the required active current level is 0,08 seconds.

Figure 8 illustrates a similar iterative test process 800 for determining a reactive current set point for a Pol voltage level of 0.4 p.u. It can be seen that correct Pol reactive current output level, according to the chart 300 of Figure 3, is achieved carrying out the method 400 of the invention according to Figure 4 within 0.1 seconds and 5 iterations. Many modifications may be made to the above examples without departing from the scope of the present invention as defined in the accompanying claims.