Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
MAINTENANCE OF AN OFFSHORE WIND FARM MAKING USE OF AN ASSEMBLY OF A FLOATING HARBOUR SHIP AND A PLURALITY OF SHUTTLE VESSELS
Document Type and Number:
WIPO Patent Application WO/2011/093704
Kind Code:
A1
Abstract:
A method for use with maintenance of an offshore wind farm comprising a plurality of offshore wind turbines installed in open sea, in which the method makes use of an assembly of a plurality of shuttle vessels 8, 9 and a seaworthy harbour ship 1 which comprises an internal harbour basin 4 within outlines of the ship 1 and a plurality of mooring positions 7 for mooring the plurality of shuttle vessels 8, 9 to the ship 1 when lying inside the basin 4, wherein the method further comprises sailing the assembly of the plurality of shuttle vessels 8, 9 and the harbour ship 1 towards an anchoring position near or in the wind farm and anchoring the harbour ship 1 there, and sailing the plurality of shuttle vessels 8, 9 back and forth between the mooring positions 7 of the anchored harbour ship 1 and distinctive ones of the wind turbines for performing the maintenance thereto.

More Like This:
Inventors:
PRINS REINOUT KLAAR NORFOLC JAAP (NL)
Application Number:
PCT/NL2011/050052
Publication Date:
August 04, 2011
Filing Date:
January 27, 2011
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
P & R SYSTEMS (NL)
PRESIGN HOLDING B V (NL)
PRINS REINOUT KLAAR NORFOLC JAAP (NL)
International Classes:
B63B25/00; B63B35/00; B63B35/40
Domestic Patent References:
WO1993004914A11993-03-18
Foreign References:
GB527599A1940-10-11
EP1695902A22006-08-30
EP1772372A12007-04-11
US6799528B12004-10-05
US4075860A1978-02-28
US2370916A1945-03-06
EP1695902A22006-08-30
Attorney, Agent or Firm:
RIEMENS, R.H. (GE Rijswijk, NL)
Download PDF:
Claims:
Claims

1 . A method for use with maintenance of an offshore wind farm comprising a plurality of offshore wind turbines installed in open sea, in which the method comprises:

- providing a shuttle vessel for transfer of service engineers and/or goods to and from the wind turbines;

- sailing the shuttle vessel to one of the wind turbines;

- landing the shuttle vessel against the wind turbine for allowing transfer of the service engineers and/or goods between the shuttle vessel and the wind turbine;

- sailing the shuttle vessel to another wind turbine for allowing transfer of service engineers and/or goods between the shuttle vessel and that other wind turbine; and

- sailing the shuttle vessel to a harbour facility and mooring it there for allowing exchange of the service engineers and/or the goods between the shuttle vessel and the harbour facility before sailing the shuttle vessel out to another wind turbine;

characterized in that,

the method makes use of an assembly of a plurality of the abovementioned shuttle vessels and a seaworthy harbour ship which serves as the abovementioned harbour facility and for this comprises an internal harbour basin within outlines of the ship and a plurality of mooring positions for mooring the plurality of shuttle vessels to the ship when lying inside the basin, the basin being provided with an entrance opening for the shuttle vessels to sail into and out of the basin,

wherein the method further comprises:

- sailing the assembly of the plurality of shuttle vessels and the harbour ship towards a halt position near or in the wind farm and substantially keeping the harbour ship in its halt position; and

- sailing the plurality of shuttle vessels back and forth between the mooring positions of the halted harbour ship and distinctive ones of the wind turbines for performing the

maintenance thereto. 2. Method according to claim 1 , wherein the harbour ship, while being kept

substantially in its halt position, is maintained in a position in which the entrance opening for the shuttle vessels to sail into the basin lies leeward.

3. Method according to claim 1 or 2, wherein both during the sailing of the assembly towards the halt position as well as during the sailing of the plurality of shuttle vessels back and forth between the halted ship and the wind turbines, the internal basin is kept filled with sea water.

4. Method according to claim 3, wherein both during the sailing of the assembly towards the halt position as well as during the sailing of the plurality of shuttle vessels back and forth between the halted ship and the wind turbines, the internal basin is kept in open connection with the surrounding sea water by means of its entrance opening being open for the shuttles to sail into and out of the basin at all times. 5. Method according to claim 3 or 4, wherein both during the sailing of the assembly towards the halt position as well as during the sailing of the plurality of shuttle vessels back and forth between the halted ship and the wind turbines, the internal basin is kept in open connection with the surrounding sea water by means of the basin having its bottom at least partially open for the surrounding sea water to flow into and out of the basin.

6. Method according to claim 4 or 5, wherein adjustable flow through openings of damping means are provided in the basin which openings are adjusted in dependence of sea swell inside the basin. 7. Method according to one of the preceding claims, wherein the harbour ship is halted near or in a wind farm which lies at least 30 miles offshore and comprises at least a hundred wind turbines which are each visited for maintenance within a period of less than a month by using a number of at least two of said shuttle vessels at the same time and mooring them at least during the night during the maintenance period inside the basin of the harbour ship.

8. Method according to one of the preceding claims, wherein, in the case of relocation of the harbour ship and/or during extreme weather conditions, the shuttle vessels are taken out of the water and placed upon a deck of the harbour ship.

9. Method according to one of the preceding claims, wherein the harbour ship is further equipped with sleeping quarters for the service engineers,.

10. Harbour ship, in particular for use in the method according to claim 1 , comprising: - a seaworthy floating construction; - halting means for substantially keeping the floating construction in a halt position at open sea;

- an internal harbour basin within the outlines of the floating construction which basin has an entrance opening for shuttle vessels to sail into the basin; and

- a plurality of mooring positions for mooring a plurality of shuttle vessels to the floating construction when lying inside the harbour basin,

wherein the internal basin has an open connection with the surrounding sea water such that it is kept filled with sea water both during sailing and anchoring. 1 1 . Harbour ship according to claim 10, wherein the internal basin has its entrance opening in open connection with the surrounding sea water.

12. Harbour ship according to claim 10 or 1 1 , wherein the internal basin has an at least partially open bottom such that the basin is in open connection with the surrounding sea water.

13. Harbour ship according to one of claims 10-12, wherein the basin is provided with damping means that comprise adjustable flow through openings for damping sea water flowing through these openings.

14. Harbour ship according to claim 12 and 13, wherein the damping means comprise adjustable panels which at least partly delimit the basin at its lower side, in particular extending in a transverse direction of the harbour ship. 15. Harbour ship according to one of the preceding claims 10-14, wherein sleeping quarters are provided for personnel of the plurality of shuttle vessels.

16. Harbour ship according to one of the preceding claims 10-15, wherein the floating construction comprises deck space for at least some of the plurality of shuttle vessels to be placed upon, and lifting means for taking one of the shuttle vessels out of the basin onto the deck space.

17. Harbour ship according to one of the preceding claims 10-16, wherein propulsion means are provided which comprise thrusters for turning the floating construction, while being substantially kept in its halt position, towards a position in which the entrance opening of the basin is kept leeward.

18. Harbour ship according to one of the preceding claims 10-17, wherein propulsion means are provided for propelling the floating construction over sea to its halt position. 19. Harbour ship according to one of the preceding claims 10-18, wherein the floating construction comprises two longitudinal floating bodies delimiting opposite sides of the basin, which floating bodies are connected at their front sides by a bow.

20. Harbour ship according to claim 19, wherein the floating bodies each comprise an anti-rolling fluid tank, which tanks are connected to each other by a fluid duct in which pumping means are provided for pumping fluid from one tank to the other one in a direction which is opposite to a rolling movement of the floating construction around its longitudinal central axis in response to sea swell. 21 . Harbour ship according to claim 20, wherein the duct extends underneath the basin.

22. Harbour ship according to one of the preceding claims 10-21 , wherein the basin is provided with at least two mooring positions in its basin and has dimensions large enough for mooring at least two vessels inside the basin at the same time.

23. Harbour ship according to one of the preceding claims 10-22, wherein the halting means comprise dynamic positioning means for substantially keeping the floating construction in its halt position at open sea. 24. Harbour ship according to one of the preceding claims 10-23, wherein the halting means comprise anchoring means for substantially keeping the floating construction in its halt position at open sea.

25. Assembly of a harbour ship according to one of the preceding claims 10-24 and a plurality of shuttle vessels.

Description:
Title: Maintenance of an offshore wind farm making use of an assembly of a floating harbour ship and a plurality of shuttle vessels.

The invention relates to a method for use with the performance of maintenance to an offshore wind farm. The invention also relates to a harbour facility, in particular for use with such a method of performing maintenance to an offshore wind farm, and to an assembly of such a harbour facility and a plurality of shuttle vessels for transfer of service engineers from the harbour facility towards wind turbines of the farm and vice versa.

An offshore wind farm usually comprises a cluster of some hundreds wind turbines, the large number is necessary to be able to efficiently transfer the generated electricity from the farm to the shore. It has appeared that a rather intense maintenance of the offshore wind turbines is necessary. Otherwise one or more of the turbines are likely to get broke, which results in the wind farm no longer being able to yield a profitable return on investment. With present wind farms it has become common practice to visit each turbine once, sometimes twice a week for inspection and preventive maintenance. Also from time to time periodic actions need to be taken, like changing the oil in the gear box of the electrical generator or replacing some critical moving parts. In the case of defects, repairs need to be carried out.

For this high frequent visitation of the turbines it is known to have the service engineers together with their tools and spare parts delivered to the turbines by small shuttle vessels. The shuttle vessels used, which are also referred to as crew transfer vessels, are highly manoeuvrable small ships which each make tours around a selected number of the wind turbines to deliver the service engineers thereto, and to collect them again at the end of the day. An example of such shuttle vessels can be seen in EP 1 695 902. Depending on the progress made in the maintenance program, it is possible to have the service engineers visit more than one turbine per day. As soon as they have finished their maintenance to a certain turbine, they can call in the vessel. The turbines are each provided with a landing platform for landing the shuttle vessel against. Service engineers have to step from the shuttle vessel onto the turbine, for example directly onto the landing platform or onto a ladder at a lower end of the turbine tower and then climb up to the platform. From there the interior of the tower is accessible through an entrance door.

At this moment an increasing number of offshore wind farms are being built all over the world. Only in Europe it is already expected that the total number of offshore wind turbines is going to grow during the next decade to a total of more than 10,000 wind turbines in order to be able to generate a total amount of close to 50 gigaWatts of green electricity. The abovementioned high frequent periodic maintenance of such large numbers of turbines is going to require large scale logistics directed to the transfer of all the required service engineers, equipment, spare parts, etc to and from the turbines.

However, more and more of the presently foreseen offshore wind farms are to be located at distances of more than 30 miles offshore according to stricter governmental demands. Such large distances are disadvantageous for the presently known maintenance methods that are presently used with wind farms lying much closer to the shore. With the distance of more than 30 miles, the sailing times for the shuttle vessels become too long. Also the risk of bad weather has a negative impact. As soon as the wind is expected to rise above a certain threshold value, the vessels are no longer allowed to sail out to the wind farm anymore. The shuttle vessels even need to be called back to the harbour again as soon as the waves are expected to become too high for the small vessels to be able to safely land onto the wind turbines and/or to sail safely back to the harbour. This means that the further away a wind farm is distanced form that harbour, the more account has to be taken of any forecasted bad weather. Thus the more frequent it is going to occur that sailing out with the shuttle vessels towards the wind farm is deemed to be too risky and that maintenance is not possible during that period. This has an immediate negative effect on the total efficiency of the wind farm.

In the alternative it is known to deliver the service engineers and/or goods to and from the wind turbines by making use of helicopters. This however is rather hazardous and also very expensive for large scaled wind farms lying relative far off of the coast.

At this moment no methods are known for performing maintenance of large scaled wind farms lying relative far off of the coast in a cost effective manner.

The present invention aims to overcome at least some of the abovementioned disadvantages or to provide a usable alternative. In particular the invention aims to provide a safe, efficient and reliable method for use with maintenance of offshore wind farms, more in particular for offshore wind farms lying relative far out of the coast.

This aim is achieved by a method according to claim 1 . The method comprises providing an assembly of a plurality of shuttle vessels and a seaworthy harbour ship. The shuttle vessels are designed for transfer of service engineers and/or goods to offshore wind turbines of an offshore wind farm. The harbour ship is designed as floating harbour facility for the vessels, and for this purpose comprises an internal harbour basin within the outlines of the ship and a plurality of mooring positions inside the basin for mooring the plurality of shuttle vessels inside the basin to the ship. The basin is provided with an entrance opening such that the shuttle vessels can sail into and out of it. The method starts with the sailing of the assembly of the plurality of shuttle vessels and the harbour ship towards a halt position, for example an anchoring position near or in the wind farm. Then the harbour ship is halted, for example anchored, there. Subsequently the plurality of shuttle vessels are sailed back and forth between the mooring positions inside the sheltered basin of the halted harbour ship and distinctive ones of the wind turbines of the wind farm for having service engineers performing maintenance to the turbines.

The floating harbour facility advantageously provides sheltered mooring positions for the smaller shuttle vessels inside its inner basin. The floating construction of the harbour ship suitably covers the basin in the sideways direction as much as possible from the wind and the waves. By having the harbour ship halted near the wind farm, the mooring positions of the shuttle vessels have come to lie very close to the wind turbines of the wind farm. Sailing times for the vessels from the harbour ship towards the turbines are kept to a minimum, independent of where the wind farm is located at the open sea and independent of how far the nearest mainland harbour is. Thus, even if a wind farm is located relative far offshore, in particular more than 30 miles away from the mainland, and comprises at least a hundred wind turbines which are each to be visited for maintenance frequently, in particular at least once per month, it is still possible to quickly and efficiently transfer service engineers between the harbour ship and the wind turbines. In the case of bad weather, the internal basin of the harbour ship offers a sheltered safe mooring and transfer facility for having both the service engineers and goods, like tools and spare parts, to embark and disembark the vessels. This makes it possible for the vessels to keep sailing out for a longer time. This helps in keeping a larger number of the turbines operating, which makes the efficiency of the wind farm profitable. In the case of bad weather suddenly arising, the vessels can easily and quickly sail back to the harbour ship to be safely moored inside the basin and sheltered therein from possible high waves and strong winds. Downtime during the maintenance of the wind farm because of forecasted bad weather conditions is minimized because the vessels can keep on sailing out for a longer time until close to the moment that the forecasted bad weather actually arrives at the location of the wind farm.

Preferably the harbour ship is equipped with sleeping quarters for the service engineers. This makes it possible for them to spend one or more nights at the harbour ship so that they do not have to loose time each day in getting back to the mainland. The harbour ship is further preferably equipped with storage facilities for storing spare parts and tools, and possibly also with a workplace for being able to quickly perform repairs to critical parts of the turbines.

The basin is provided with at least two, and preferably at least four, mooring positions in its basin and has dimensions large enough for mooring said at least two, and preferably at least four vessels inside the basin at the same time. In particular the vessels have a length and width which is at least 8 to 10 times smaller than the harbour ship. Besides by being anchored when reaching its halt position, the harbour ship can also be kept in its halt position in other manners. In the alternative or in addition to being anchored, the harbour ship can also be kept substantially in its halt position with the aid of suitable dynamic positioning means. Those dynamic positioning means are designed for detecting a change in position of the ship, and to, each time the ship tends to drift away from its halt position, drive one or more propulsion means (thrusters, ship's screws or the like) in such a manner that the ship is able to substantially maintain its halt position near or in the wind farm. The use of dynamic positioning means offers the advantage that any

infrastructure present on the sea bottom in or near the wind farm can not get damaged by it.

The harbour ship can be halted at a fixed position near the wind farm, in which the ship has the freedom to rotate around this halt position. Dependant on further development of the farm and gained experiences, it is possible to have the harbour ship relocated to other halt positions from time to time. In its halt position, the harbour ship preferably is maintained as much as possible directed with its basin entrance opening directed leeward. This keeps the basin and the mooring positions therein sheltered as much as possible from the wind and waves. For being able to each time reach this desired position, the harbour ship can be provided with propulsion means that comprise thrusters for turning the ship relative to its halting point.

If anchoring means are used, then those anchoring means of the harbour ship can comprise all kinds of mooring systems. Advantageously the anchoring means then may comprise a damping system for damping movements like oscillations of the harbour ship in response to environmental conditions. Also the anchoring means may comprise an active force reacting system which is designed for sensing any displacements/movements of the harbour ship and in response act a force on the harbour ship to compensate for these displacements/movements.

In a further embodiment the internal basin is kept filled with sea water at all times, that is to say both during the sailing of the assembly towards its anchoring position as well as during the sailing of the plurality of shuttle vessels back and forth between the halted ship and the wind turbines. This has the advantage that the basin is always immediately ready for the shuttles to be moored therein and/or to sail into and out of the basin. No additional measures need to be taken for this, and the ship can be halted or kept in its halt position at all times even during somewhat more extreme weather conditions. A lower upward floating power is then required for the ship. The shuttle vessels can always be kept floating all by themselves inside the basin even during transport of the ship towards a new halt position. Also the stability of the ship can get improved by the filled basin.

Preferably the internal basin is kept in open connection with the surrounding sea water. The open connection helps to keep the ship floating more calmly on the sea even during harsh weather conditions. In particular this open connection is formed by means of its entrance opening being open at all times for the shuttles to sail into and out of the basin when coming from or going to the surrounding sea water. Thus the surrounding sea water has the freedom to flow into and out of the basin while at the same time the shuttles have the full freedom to sail into and out of the basin without having to wait for a gait or the like to be opened.

In the alternative or in addition to the entrance opening being open at all times, the internal basin can also be kept in open connection with the surrounding sea water by means of the basin having no bottom or having a bottom which is at least partially open for the surrounding sea water to flow into and out of the basin. If the basin comprises a partially open bottom then this is preferably provided at such a distance beneath the sea level that it does not stand in the way for the vessels to sail into and out of the basin. The downwards open basin has the advantage that it makes the ship more lightweight, easier and/or cheaper to manufacture. Also the shuttle vessels can then sail into and out of the basin under all kinds of circumstances, not only under calm weather conditions, but also at heavy sea. This is particularly important for the intended use according to the invention, that is to say for the performing of maintenance of large scaled wind farms lying relative far off of the coast in a cost effective manner.

In order to keep the volume of water inside the basin as quiet as possible, damping means may be provided therein. In an embodiment, these damping means comprise adjustable flow through openings in the basin, which openings are adjusted in direction and/or dimensions in dependence of sea swell inside the basin. In an embodiment the damping means may comprise adjustable panels which at least partly delimit the basin at its lower side, in particular extending in a transverse direction of the harbour ship. The panels can then influence the water movement at the open surface of the basin without having to contribute to the floating power of the ship. Also it is noted that the panels in that case are not intended for carrying any kind of weight or load of any shuttle vessels moored inside the basin, not even during sailing of the ship towards a new halting position.

In a preferred embodiment the harbour ship comprises a floating construction with two longitudinal floating bodies delimiting opposite sides of the basin. The floating bodies can then be connected at their front sides by a bow which delimits the front side of the basin. Advantageously the floating bodies may each comprise an anti-rolling fluid tank. The tanks can then be connected to each other by a fluid duct in which pumping means are provided. This makes it possible to pump fluid from one tank to the other one in a direction which is opposite to a rolling movement of the floating construction around its longitudinal central axis in response to sea swell. The duct can extend underneath the basin at a depth where they do not stand in the way of the shuttle vessels to sail into and out of the basin. For example the ducts can extend through strengthening tubes which connect the longitudinal floating bodies with each other.

During sailing of the harbour ship to a new halting position, it is possible to have the shuttle vessels sail independently towards that location. It is also possible to first moor the shuttle vessels inside the basin and then tear them along with the harbour ship. In yet another embodiment the shuttle vessels can even be taken out of the water and placed upon a deck of the harbour ship to thus also sail along with the harbour ship. The placing of the shuttle vessels on top of a deck of the harbour ship can also be done during other circumstances, for example during extreme weather conditions.

The harbour ship may be provided with its own propulsion means for propelling it over sea to its halting position. In the alternative it may also be towed thereto by another ship or even by the shuttle vessels themselves.

Further advantageous embodiments are stated in the subclaims.

The invention also relates to a harbour ship and an assembly of such a harbour ship and a plurality of shuttle vessels.

The invention shall be explained in further detail with reference to the drawings, in which:

Fig. 1 shows a schematic view of an embodiment of an assembly of a harbour ship and several shuttle vessels according to the invention; and

Fig. 2a-c show a schematic view of an alternative embodiment of the harbour ship near an offshore wind farm seen from different angles.

In fig. 1 the harbour ship is indicated with the reference numeral 1 . The ship 1 comprises a seaworthy floating construction with two longitudinal floating bodies 2 connected at their front sides by a bow 3. The floating bodies 2 and the bow 3 delimit respective sides of a water basin 4 spared out within the outlines of the floating construction. The basin 4 has an entrance opening 5 at the back side of the ship 1 . The basin 4 is provided with mooring positions 7 alongside which fenders 7a and davits 7b are provided. At these mooring positions 7 shuttle vessels 8, 9 are moored. The shuttle vessels 8, 9 are substantially smaller than the ship 1 and the basin 4 comprises more than enough space for each of them to sail into and out of the basin 4 without bumping against each other.

The ship 1 is firmly anchored to the bottom of the sea by means of anchoring means 10. The bow 3 is provided with sleeping quarters 1 1 for approximately 50 to 150 man, and workplaces and storage rooms 12, 13. On top of the sleeping quarters a helicopter landing platform 15 is provided for being able to quickly fly in personnel and supply goods whenever necessary. The ship 1 comprises a substantially flat deck 17. On top of this deck 17 a crane 18 is provided for shipping heavy loads into and out of the vessels 8, 9, or if necessary to even lift an entire vessel out of the basin 4 and place it upon the deck 17. Particularly the vessels 8 are well suitable for this because of their catamaran shaped (flat) bottoms.

At its lower side at some distance beneath the water level the basin is delimited by adjustable panels 20 which extend in a transverse direction of the ship 1 . The panels 20 can each be placed in different rotational positions (around their longitudinal axis) such that flow through openings between them are changed in direction and/or size. According to another design the flow is regulated by openings in a fixed bottom element, in which the size of the openings can be adapted in order to control the flow which can run through them.

The flow through these openings helps in damping possible waves occurring in the basin 4. Because of the wave movements, water keeps flowing inside and out these openings and with this each time looses some of its energy. This helps in keeping the water volume inside the basin 4 as quiet as possible.

At the backside the ship 1 is provided with thrusters 21 for helping in accurately positioning the ship 1 relative to its anchoring means 10, and in particular such that the ship 1 keeps lying with its bow 3 in the wind W and with the entrance opening 5 leeward. In that way the bow 3 keeps the basin 4 out of the wind, while the deck 17 prevents waves from directly influencing the water volume in the basin 4. For this the deck 17 preferably is high enough for the waves to not roll over them during bad weather.

In fig. 2a-c an alternative embodiment of the harbour ship is shown. Similar parts have been given the same reference numerals. The harbour ship 1 is now sailed to a position next to one of the wind turbines 25 of an offshore wind farm. As can be seen the farm comprises a large number of turbines 25. Each turbine 25 is provided with a ladder 26 which leads to a landing platform 27 which gives access to a door 28 of the turbine mast. The shuttle vessels 8 are sailing tours along the respective turbines 25 to drop off or collect service engineers and goods. The vessels 8 start and end their tours each time in the basin 4 of the ship 1. Advantageously the sailing times for the vessels 8 are short because of the ship 1 lying so close to the farm.

As can be seen the ship 1 now comprises two longitudinal flat deck parts 17a for placing the vessels 8 upon. These flat deck parts 17a are sheltered by deck parts 17b which are upstanding from the deck parts 17a to a higher level. The deck parts 17b shield both the basin 4 and the deck parts 17a (including any vessels 8 placed thereupon) from wind and waves.

Besides the embodiments shown numerous variants are possible. For example the ship with its internal basin and the smaller vessels may have other shapes and/or dimensions. Also the mooring positions inside the basin may be designed differently. Not only can the invention be used for the maintenance of a wind farm lying at a distance of more than 30 miles offshore, it can also be used for wind farms closer to the shore. There also the advantage goes that the harbour ship advantageously can be equipped with all kinds of facilities which are useful for performing optimal maintenance to the turbines. The harbour ship can also be used for other actions to be taken on sea where the use of a plurality of small vessels to sail into and out of the internal basin of the harbour ship might come in handy.

Thus an optimal method and assembly are provided with which it is really possible to have the large number of wind turbines of an offshore wind farm lying far out of the coast visited for maintenance in a high frequent manner.