Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
METHOD AND APPARATUS FOR RADIO LINK FAILURE REPORTING IN WIRELESS COMMUNICATION SYSTEM
Document Type and Number:
WIPO Patent Application WO/2021/230544
Kind Code:
A1
Abstract:
The present disclosure relates to a communication method and system for converging a 5th-Generation (5G) communication system for supporting higher data rates beyond a 4th-Generation (4G) system with a technology for Internet of Things (IoT). The present disclosure may be applied to intelligent services based on the 5G communication technology and the IoT-related technology, such as smart home, smart building, smart city, smart car, connected car, health care, digital education, smart retail, security and safety services. The present disclosure provides method and apparatus for RLF reporting.

Inventors:
AGIWAL ANIL (KR)
KIM SOENGHUN (KR)
JANG JAEHYUK (KR)
INGALE MANGESH ABHIMANYU (KR)
Application Number:
PCT/KR2021/005496
Publication Date:
November 18, 2021
Filing Date:
April 30, 2021
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
SAMSUNG ELECTRONICS CO LTD (KR)
International Classes:
H04W76/18; H04B7/06; H04L5/00; H04W74/08; H04W76/16
Domestic Patent References:
WO2020047080A12020-03-05
Foreign References:
US20200137821A12020-04-30
KR20190098692A2019-08-22
KR20200031186A2020-03-24
Other References:
ERICSSON (RAPPORTEUR): "Capturing RRC Positioning Impacts after RAN2-109bis", 3GPP DRAFT; R2-2003880, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), 11 May 2020 (2020-05-11), XP051882800
HUAWEI: "Connection failure due to mobility", 3GPP DRAFT; R3-192959, vol. RAN WG3, no. Reno, 13 May 2019 (2019-05-13)
CATT ET AL.: "Beam recovery and RLF", 3GPP DRAFT; R2-1711770 BR AND RLF, 3RD GENERATION PARTNERSHIP PROJECT (3GPP, vol. RAN WG2, no. Berlin, 8 October 2017 (2017-10-08)
RLF. ERICSSON: "CR on the beam recovery impact and BWP impact on RLF triggering", 3GPP DRAFT; R2-1805442 - CR ON THE BEAM RECOVERY IMPACT AND BWP, no. Sanya, 5 April 2018 (2018-04-05)
ERICSSON: "Open issues related to the RLF report", 3GPP DRAFT; R2-1915434, 3RD, vol. RAN WG2, no. Reno, 7 November 2019 (2019-11-07)
Attorney, Agent or Firm:
YOON & LEE INTERNATIONAL PATENT & LAW FIRM (KR)
Download PDF: