There is shown a method and apparatus for transfer of loads from a vessel (13) that moves with heavy seas to a stationary or mobile installation (3) by the use of at least one lifting cable (4) or wire and at least one hoisting means (1), where the load (11) in its starting positions stands on a rack (12) on the vessel (13). The load transfer takes place at an instant when the load (11) has only insignificant kinetic energy, as at least one gripping means (14) is activated in controlled manner at said instant to lock the load (11) to the lifting cable (4). At the same instant the rack (12) collapses and immediately establishes a distance between the load (11) and the vessel (13), thereby suspending the load in the lifting cable (4).

Inventors:
OLSEN TORODD EEG (NO)
Application Number:
PCT/NO1993/000043
Publication Date:
September 30, 1993
Filing Date:
March 16, 1993
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
OLSEN TORODD EEG (NO)
International Classes:
E02B17/04; B63B27/30; B63B35/44; B65G67/62; B66C1/12; B66C1/66; B66C13/02; B66D3/00; E02B17/00; (IPC1-7): B63B27/30; B63B35/44; B66C13/04; E02B17/00
Foreign References:
US4174188A1979-11-13
US4544137A1985-10-01
US4919393A1990-04-24
GB2091678A1982-08-04
US4448396A1984-05-15
US4629365A1986-12-16
SE448714B1987-03-16
FR2290346A11976-06-04
Download PDF:
Claims:
P a t e n t C l a i m s
1. A method for transfer of loads from a vessel (13) that moves with heavy seas to a stationary or mobile installation by the use of at least one suspending means (4) and at least one hoisting means (1), where the load (11) in its starting position stands on a rack (12) on the vessel (13), c h a r a c t e r i z e d i n that the load transfer takes place at an instant when the load (11) has only insignificant kinetic energy, as at least one gripping means (14) is activated in controlled manner at said instant to lock the load (11) to the suspending means (4), and at the same instant, the rack (12) collapses and immediately establishes a distance between the load (11) and the vessel (13), thereby suspending the load in the suspending means (4).*& 2.
2. A method according to claim 1, c h a r a c t e r i z e d i n that the load transfer takes place at the instant when a heave motion of the vessel (13) reverses to a sinking motion, in that a relative movement between the gripping means (14) and the suspending means is permitted in one direction, but that the gripping means (14) is activated by relative movement in the opposite direction.
3. An apparatus for transferring a load movable in a substan¬ tially vertical direction to a temporarily stationary suspending means (4) at an instant when the load (11) has no significant kinetic energy, c h a r a c t e r i z e d i n that it comprises at least one gripping means (14) and a recording or sensing device (5,18) which registers when the movement of the load reverses at said instant, which sensing device, after a prior commando, emits a signal that control lably activates the gripping means (14) for locking of the load (11) to the suspending means (4) at the same instant.
4. An apparatus according to claim 3, c h a r a c t e r i z e d i n that the gripping means (14) is disposed in a housing (14*) which encloses the suspending means (4), said gripping means (14) comprising a gripper mechanism (7) in the form of keys which are held at the starting position in spaced relationship to the suspending means, but nearly enclosing it, and which on activation releases a press plate or key holder plate (6) and enables the keys to lock the load (11) to the suspending means (4) on a specific direction of movement of the load or the suspending means.*& 5.
5. An apparatus according to claim 3 or 4, c h a r a c t e r¬ i z e d i n that a weight (10) is disposed at the lower end of the suspending means (4), for the purpose of holding it taut.*& 6.
6. An apparatus according to claims 3, 4 or 5, c h a r a c t e r i z e d i n that a hoisting means (1) is mounted for cooperation with said suspending means (4), which on signal begins to pull in the suspending neabs for a lifting operation.
7. An apparatus according claim 6, c h a r a c t e r i z e d i n that a gripping means (14) is connected with or mounted on the hoisting means (1) and the hoisting means (1) is coupled to a hydraulic accumulator (27) which compensates for the movements of the load (11), and that the hoisting means (1) is mounted either on the load or on a stationary installation.
8. An apparatus according to one or more of the claims 37, c h a r a c t e r i z e d i n that the stop function of the gripper mechanism is replaced by a controlled valve (28) that on a given signal stops the movement of the cable, and thereby that of the load.*& 9.
9. A method for the construction of an oil platform on a jacket or support structure positioned on the sea bed, preferably with the aid of the method and apparatus according to claims 18, c h a r a c t e r i z e d i n that the platform is constructed by the lifting of large building modules directly from a mobile vessel up through the main frame system (3) of the platform, from below, to be installed between the main frame system or thereupon.*& 10.
10. A method according to claim 9, c h a r a c t e r i z e d i n that the platform frame/ acket (36) alternatively has projecting support beams or skids (35) mounted at the top or somewhat further down on the frame, so that the modules are lifted from the vessel up to the projecting beams and are mounted therefrom as depending modules or are drawn into or up onto the main frame system of the platform.
Description:
METHOD AND APPARATUS FOR THE TRANSFER OF LOADS FROM A FLOATING VESSEL TO ANOTHER OR TO A FIXED INSTALLATION.

The invention relates to a method for transfer of loads fro a vessel that moves with heavy seas to a stationary or mobil installation, by the use of at least one lifting cable o wire and at least one hoisting means, where the load in it starting position stands on a rack on the vessel.

The invention also relates to an apparatus for transferring load movable in a substantially vertical direction to temporarily stationary suspending means such as a cable o string at an instant when the load has no significant kineti energy.

The invention relates also to a method for constructing a oil platform on a jacket or support structure positioned o the sea bed, preferably with the aid of the method an apparatus mentioned above.

In connection with Norwegian patent no. 159 186 and wit patent application NO 894 762, further developmental work h been carried out with the objective of devising a method fo direct installation of modules from a ship to a platform i accordance with the construction method previously describ in the above cited patent publication. There has also be developed a type of platform consisting of a system of easil mountable and dismountable modules, deck and equipment whi may easily be mounted directly from barges or a supply shi on the field without using floating cranes.

The methods currently in use today for offshore lo transfer, by lifting loads from a ship to fixed or mobi installations, involve subjecting the lifting gear as well

the loads to some very significant dynamic stresses in that the loads are transferred whilst they are in motion, and consequently have high kinetic energy.

In the transfer of smaller loads, for example service goods and support equipment for production platforms and drilling rigs, the dynamic forces are absorbed by existing cranes and lifting gear with the aid of hydraulic cylinders and hydraulic accumulators, so-called heave compensators. Also, the cranes currently used on board oil platforms are limited to weights of 15-80 tons.

In lifting of heavier equipment, such as modules, foundation frames, manifold stations, etc., having weights from 100 to 7000 tons, the dynamic forces will be so considerable that lifting with cranes placed on the platforms is not prac¬ tically feasible. Such weights are currently only lifted with floating cranes of various types. Most of these cranes are also equipped with hydraulic compensator systems to dampen the effect of the dynamic loads.

A major disadvantage with the use of contemporary lifting equipment is it physical size and the fact that the lifting and load handling must take place over other equipment. This entails particular limitations with respect to access, for example, In installation of equipment or modules situated under the platform.

Furthermore, the lifting of heavier units over the vital parts of the platform, such as processing plants, etc., means that processing must be stopped for security reasons during the period in which lifting takes place. The financial consequences of this can be very considerable.

In addition, the huge floating cranes must be mobilized and anchored at the platform. This involves special complica¬ tions when the sea bed around the platforms is overlaid with

pipeline systems, manifolds, etc., which can be damaged b anchors and chains. Furthermore, the crane vessel wil normally require the assistance of 2-4 tugboats or suppl ships for the anchoring, etc. Barges are needed to brin out modules and heavier equipment — usually one standar barge with a 10,000 ton displacement, pulled by two tugboat or supply ships.

The mobilization time and mobilization costs, in addition t operating costs for this equipment, are quite significan even though the lifting operation itself takes only a sho time.

Therefore, current methods establish clear limitations, bo technically and financially, for direct lifting operatio onto platforms or drilling rigs.

The limitations mentioned above are overcome by the prese invention, which permits load transfer directly from a shi or barge to a platform, from ship to ship or from ship drilling rig without any significant influences of dynam loads. The equipment of which the invention consists lightweight, and may be positioned on or under the platfo by means of simple auxiliary units.

With the aid of the invention a special platform type a method of construction has been developed, namely a platfo with depending modules that fulfills all requirements f simple, inexpensive and flexible assembly, replacement modules and later dismounting.

There are no known limitations as to the weights that can handled in accordance with the method.

The method is particularly designed for load transfer connection with rebuilding and or construction of o

platforms, and the transfer of loads such as foundation frames, satellite stations, modules, etc.

The present method utilizes a principle based on carrying out a load transfer at the moment in time when the load does not have any significant kinetic energy.

The energy of the load, as is commonly known, is proportional to the square of the velocity at the moment of load pick-up, expressed by the formula:

w=l/2 « m » V 2

The vertical speed of the object to be lifted is a function of the ship's movements, and given the fact that the ship follows the motion of the wave, the velocity for regular waves is a sine function with a period of about 4 to 8 seconds in the transfer situations that have been calculated.

The theoretical method for load transfer should thus be to seize the load at the instant it is at the top or the bottom of the wave and is therefore without any vertical velocity component.

In purely practical terms, it is only conceivable to do this while the load is on the top of the wave, due to the risk of collision between the ship and the load if the lifting speed is slower than the ship's vertical velocity In the wave.

For this purpose, a method and apparatus have been developed to ensure that the load is transferred in the described manner.

In accordance with the present invention, there is provided a method of the type described in the introduction, which is characterized in that the load transfer takes place at an instant when the load has only insignificant kinetic energy,

as at least one gripping means is activated in controll manner at said instant to lock the load to the lifti cable, and at the same instant, the rack collapses a immediately establishes a distance between the load and t vessel, thereby suspending the load in the lifting cable.

In accordance with the invention there is also provided apparatus of the type mentioned in the introduction which characterized in that it comprises at least one grippi means and a sensor device that registers when the movement the load reverses at said instant, which sensor device emi a signal that controllably activates the gripping means lock the load to the suspending means at the same instant.

In accordance with the present invention there is al provided a method for the construction of an oil platform mentioned in the introduction, which is characterized in th the platform is constructed by the hoisting of large buildi modules directly from a mobile vessel up from below throu the main frame system of the platform for installati between the main frame system or on the top thereof.

Additional features of the invention are disclosed in t dependent claims.

Other additional objectives, features and advantages will apparent from the following description of the inventio which is provided for the purpose of description witho thereby limiting the invention, and are presented connection with the attached drawings, where:

Fig. 1 shows an apparatus according to the invention whi is a part of the equipment used to carry out a lo transfer,

Fig. 2 is a diagram illustrating the placement of plurality of apparatuses according to the inventi

to execute a load transfer from a vessel to a stationary installation,

Fig. 3 shows the apparatus according to Fig. 1 in further detail and partial section,

Fig. 4 is an enlargement of an alternative embodiment of the apparatus shown in Fig. 3,

Fig. 5 shows an alternative method of undertaking compensa¬ tion for a wave movement for the lifting gear,

Fig. 6. shows still another alternative lifting and compensa¬ ting arrangement,

Fig. 7 shows in further detail a collapsible support structure,

Fig. 8 shows an alternative embodiment of the collapsible support structure shown in Fig. 7,

Fig. 9 illustrates the use of the method according to the invention for installation of a module from below and into an existing oil platform,

Fig. 10 illustrates use of the method for installation of a module to a platform from a vessel on the exterior of the module frame, with the aid of a lifting frame,

Fig. 11 illustrates a construction method for oil platforms showing the first phase of the construction,

Fig. 12 shows the installation of the utility module that constitutes the next phase of the construction,

Fig. 13 shows the utility module mounted and depending from the platform's projecting beams,

Fig. 14 shows the platform after mounting is completed.

Fig. 15 shows a platform that is installed on a concret base, and

Fig. 16 shows an application of the method for installatio of foundation frames, manifold stations, satellites etc.

The system consists of the following main elements as show in Fig. 1:

The lifting gear 1 may consist of an ordinary crane, dru winch or linear lifting mechanisms that obtain their powe from a hydraulic power pack 2.

From the lifting device 1 runs a suspending means 4 con sisting of one or more individual wires or lines passin through a gripping means having a gripper mechanism 7, to weight 10 that holds the suspending means taut. The grippe mechanism 7 is connected to the load 11, which may consist o a module, a deck, an equipment package or the like. Load 1 is placed on a collapsible support structure 12 which stand on the vessel 13. Several forms of gripper mechanisms suc as clamps or jaws are conceivable, but mechanisms havin self-inducing function are particularly preferred: i.e. mechanisms that clamp harder and more securely the greate the load is.

The principle shown illustrates that by means of a speci control device for the gripper mechanism 7, it will b possible to transfer the load to the suspending means whil the load is at a standstill, i.e., at the top of the wa movement.

The system includes a controlled press plate 6 which holds the gripper mechanism 7 open until it is activated by remote control at a point in time determined by the speed and direction recording instrument 5.

On activation of the press plate 6 the gripper mechanism 7 is triggered with the aid of a spring 8. This causes means 4 to be locked against upward movement relative to the gripper mechanism 7 so that load 11 remains suspended by the means 4.

In the following are shown the main principles of the technical design of the equipment used for installation of modules directly from a vessel.

Fig. 2 is a sectional view of the main components of the equipment arranged for installation of a module. These consist of lifting gear 1, hydraulic power pack 2, controlled gripping means 14, cable weight 10, the supporting means being cables, positioning instrument 5, collapsible support structure 12 and vessel 13.

The functional principles are as follows:

Mounted on or within the platform 3 is the lifting gear 1, for example, linear hoisting machines, drum winches or suitable hoisting equipment. From the lifting gear 1 are lowered, to within a few meters above sea level, lifting cables 4 on which weights 10 have been mounted to hold them taut, and so-called pilot cables 16, i.e., lightweight steel cables or hawsers that the vessel crew can use for handling the weights.

The ship 13 has been fitted with a transport frame 20 having collapsible support legs 12 for supporting the module 11.

In the lifting procedure, the ship 13 is positioned below the lifting gear 1 with the aid of the instrument package 18

that registers the position and movement of the ship i relation to the platform. The positioning equipment may b of various types: mechanical with the aid of a so-calle piano wire 17 suspending a weight 19 from the platform, b shortwave acoustic signals, light, lasers or by visu registration.

The vessel's movements are registered on the bridge, and a evaluated in relation to the calculations forming the basi for the lifting operation.

The operation starts with the use of the pilot cables 16 guide the weights 10 and gripping means 14 into placement the module's lift points. During this period the gripp mechanism 7 is not activated, and the lifting cables 4 m pass freely through the gripper mechanism 7. If the positi and movement are within given parameters, the ship's captai will release the gripper mechanism 7 with the aid of, f example, electrically controlled powder charges or hydrauli pneumatic or manual triggers 15.

The mode of operation of the gripper mechanisms 7 is su that they can be activated only while the load undergoes upward movement. Also, after being activated, the gripp mechanism only permits the cable to run freely in t downward direction relative to gripper mechanism 7, whi means that the cable is locked immediately on a direction change.

This principle enables the module to be lifted along t cable 4 of the vessel during the wave motion to the top the wave. At the instant the vessel begins to move downwar module 11 will be suspended from the cable, and is lift free of the support legs 12.

The support legs 12, which are collapsible, are activated a fold down rapidly so as to establish a distance between t

vessel and the module. This is of major importance for preventing collision between the vessel and the load when the vessel is lifted by the next wave and, in addition, floats higher in the water due to the removal of the load.

The vessel leaves its position, and the module may be hoisted up and secured to the platform.

Fig. 3 shows the principle for one embodiment of a gripping means 14 in the form of a gripper mechanism 7 with movable wedges, or keys.

There are several different ways to arrange the gripping means 14 and trigger system. In Fig. 3 an alternative is illustrated where the gripping means is freely suspended on the cable system.

The gripper mechanism itself 7 is enclosed in a housing or harness 14', serving partly as a holder for the gripper keys, and partly as a simple connector for attachment to the load with the aid of, for example, a so-called bayonet coupling. Through harness 14 runs one or more lifting cables or wires 4 which at the upper end thereof are attached to the lifting gear, and at the lower end may be connected to a cable weight 10 that holds the wires taut, and which overcomes the frictional forces in the gripper keys and measuring/recording instrument 5.

The mode of function for the gripping means 14 is as follows:

In open position (deactivated state), the press plate 6 is pressed down and locked by a trigger 15.

Press plate 6 in this position holds the gripper keys 7 open to allow the cables 4 to pass freely therethrough.

The recording instrument 5 has two functions:

a. ) to register the vertical movement in the form of th speed and direction of the load relative to the cable 4, and b.) to activate a microswitch 22. This is done by th resistance to rotation of the wheels of instrument 5 causin recording plate 21 to be pressed against a spring 23, whic alternately turns the microswitch on and off depending o whether the movement is upward or downward.

This function may also be carried out electronically with th registration of the upward/downward movement in the signal from the recording instrument 5.

Activation of the gripper mechanism can take place throug the transmission of an electrical signal from the bridge The signal may be sent regardless of whether the load is o the way up or down, since microswitch 22 stops the signa from reaching the trigger mechanism 15 until the load i moving upward relative to the cables. When the signa reaches the trigger mechanism 15, a powder charge is ignited the safety catch is released, and press plate 6 is lifted u by springs 8, which simultaneously push the gripper ke upward and into contact with cable 4.

At the instant cable 4 begins to move upward relative t gripper keys 7, these are locked while undergoing a movemen of 5-10 mm, which corresponds to the vertical movement fo the load before the weight is transferred to the cabl system. The wires will stretch slightly under the load, wit 30-50 mm found to be normal for module lifting. The vertic speed attained by the load at this point in the movement i insignificant.

In Fig. 4 an alternative arrangement of the press plate 6 a trigger mechanism is illustrated. This arrangement increas the safety of the release in that more than one activat 15', consisting of powder charges, hydraulic pressure, etc. may be involved.

The system functions such that press plate 6 is provided with a groove in which are disposed a series of locking lugs 25 which in locked state are pressed against a stopper ring 24. In the housing 14' for the gripper mechanism is disposed a piston 26 and one or more electrically controlled powder charges or solenoid valves connected to a hydraulic pressure source.

When the signal for release reaches the charge(s) or the solenoid valve, piston 26 is pressed upward, and it urges the locking lugs into the groove in press plate 6. The latter is released and is pressed upward by the force of springs 8. This causes the gripper keys to be pressed inward against cable 4, thereby locking it.

Rapid release of the load, i.e., on loading a module from a platform down to a vessel, for example, is made possible by pressing the press plate 6 downward and into locked position.

Fig. 5 shows an alternative method of undertaking compensa¬ tion for the wave movement in the lifting system.

The lifting machine 1, which stands on a platform 3, is combined with a hydraulic actuator 27 that allows the piston of the lifting machine, and with it the cables which are locked by the two upper gripper keys, to move in rhythm with the wave movement that the load imparts to the cables 4.

The recording instrument 5, together with the controlled gripper keys, are mounted in connection with the lifting machine 1 by means of the housing, or harness 14'.

This system is also invertible, enabling the lifting machine to mounted down by the module if this should be desired.

Fig. 6 shows an alternative lifting and compensation arrangement consisting of two lifting machines 1 and 29 which

operate in tandem. The machines are placed atop one another and calbes 4 run through them both. One of the machines ma be used for lifting and lowering, for example, while th other compensates for motion. This function may also b assigned to the upper machine 1. The machine responsibl for wave compensation 29 is equipped with a recording instru ment 5 for motion and direction as well as an ordinar actuator 30 for control of opening and closing of the grippe mechanism in lifting and lowering operations.

The rapid lock mechanism, which is designed to stop th movement when the load is at its highest point in the wave consists of a controlled valve 28 that shuts off the flow o hydraulic oil from the lifting machine 29 to the accumulato 27 when activated in accordance with the principles an equipment previously described.

The equipment illustrated in Fig. 6 may be mounted i inverted sequence, i.e., connected to the load instead o positioned up on the platform.

When the load is taken over by the cable system, the lo will be lifted from the collapsible support structure sho in Fig. 7.

This illustration is one of several examples of how t collapsible support structure may be arranged.

To the module 11 is fastened a release cable 33 which i connected via pulleys to a lock bolt 31 holding the structu locked in raised position. When module 11 is lifted, t release cable 33 pulls out lock bolt 31 and simultaneousl assists in collapsing the structure's legs 32, so that t brace 12 is laid down parallel with the structural frame 20. When the module 11 is lifted from the ship, there is alteration in both trim and displacement. This means t ship deck will now be resting higher in the water than in i

loaded state. When the ship is again lifted up by the waves, the collapsible support structure will prevent collision between the module and ship.

Fig. 8 shows an alternative method of arranging the support structure to avoid collision between load and vessel when unloading.

Cables 4 may be suspended at a slight angle, which on lifting will impart to load 11 a small power component aftward or laterally relative to vessel 13. The support structure 12 is arranged in such manner as to create a sufficient distance between the load and the vessel during lifting. This is achieved most advantageously by dividing the structure 12, as shown, so that one part moves with the load and will lie outside the vessel after lifting, while the part situated on the vessel ends up on the outside of the load when the load is hoisted up.

Fig. 9 shows that the principle may be used for installation of a module from below and into an existing oil platform in accordance with Norwegian Patent No. 860856.

Module 11 arrives at support structure 12 by means of ship 13, and is positioned below the platform module deck 3, on which lifting machines 1 are installed on mobile frames and receive their power supply from the aggregates 2. The module is hoisted as described earlier in Figs. 2-4, and is moved horizontally in and up onto module deck 3 where the module is secured to the module deck 3 or is suspended therefrom.

Fig. 10 shows the invention used for installation of a module onto a platform from a vessel, on the outside of the module frame or jacket and thereupon, or up onto existing modules with the aid of a lifting frame.

Module 11 arrives with the vessel, is positioned under th lifting frame 34 and lifted up by means of lifting machine placed on the lifting frame. With this ethed the module 1 is lifted through and up onto the lifting frame 34, and i then moved in onto the module deck.

The invention as described has given rise to a new design an construction method for oil platforms, as described in th following.

The costs connected with installation of oil platform offshore or on land can be quite considerable, particularl due to the need to use large floating cranes. This i particularly true for platforms of a smaller size, where th cost of installation is especially high in relation to th total construction cost of the platform.

Therefore, in the following we have chosen to present design and construction method which can be fully execute without the use of floating cranes.

The platform may be built entirely as a framework of steel the so-called "steel jacket" platform, or with a substructur of concrete, a so-called "gravity base" platform.

We have chosen to show a design and construction method use for a lightweight wellhead platform of steel in Figs. 11-14 and as a wellhead platform in concrete in Fig. 15.

Fig. 11 illustrates the first phase of construction.

The platform's frame or jacket 36 is built with projectin support beams or skids 35 mounted on the top or somewha further down on the jacket or frame. Normally it will als be possible to install a crane and flare tower prior to th installation of the jacket on the oil field.

Jacket 36 is installed on the field by launching directly from barges, and it is held and positioned with the aid of floats fastened to the jacket. Launching the jacket and securing it to the sea bed, so-called piling, can be done by drawing the jacket down toward the bottom — preferably over pre-drilled wells — with the aid of the lifting machines, and steering it into position on piles sunk in the sea bed.

The modules and deck intended for the platform arrive on supply ships or barges for installation as follows:

The platform's own diesel motor driven cranes hoist the lifting gear 1 into place with cables 4. The vessel 13 preferably arrives first with the living quarters module 37 or the helicopter deck, which is lifted up by means of the method described earlier. The module may be lifted up through the frame system and positioned thereon, or it may be mounted to be freely suspended from the support beam 35. This is a matter of choice.

The advantage of installing the helicopter deck and living quarters module first is obvious, for the installation crew can live on the platform and be transported by helicopter from the mounted helicopter deck.

Fig. 12 shows the installation of the utility module 38, which is hoisted into place with the aid of lifting machines 1 and cables 4, as previously described. Note that the utility module in this case is a top-suspended or depending module. This is a new method by which to mount modules, affording a reduction in the steel weight of the module, as well as facilitating its replacement or dismounting in the case of conversion or removal of the entire platform.

Fig. 13 shows the utility module 38 mounted on and depending from the platform's projecting beams. From this position it

may later be replaced/removed by reversal of the lifting process.

The equipment deck 39 with a wellhead Christmas tree, pipe systems, etc. installed thereon is mounted directly from a vessel as shown, and is moved horizontally into place within the platform if desired.

Fig. 14 shows the platform fully mounted. The living quarters module 37, with the helicopter deck, is mounted highest and atop the lifting frames. The utility module 38 is mounted for top-suspension below the living quarters module.

The equipment deck 39 with its intermediate deck and equipment is mounted within and between the platform frame system, and the weather deck 40 — which may serve as a storage area for drill pipes, etc. — is mounted between the platform's lifting frames. On the lifting frames it is possible for the drilling and well maintenance equipment 42 to be moved. The flare tower 41 can be mounted to best advantage on the outside of the frame system, enabling the frames or skids to be used freely for lifting gear or drilling rigs 42.

As is apparent from the illustration, the platform design and construction method is very flexible with respect to mounting and replacement of modules, decks, equipment, etc., by means of the frame system and the described lifting principle.

Fig. 15 shows the wellhead platform described above designed with a concrete base.

It is important to emphasize that the platform may be built with a beam system of steel or concrete according to choice, and that the modules may be designed as suspended modules or standing modules as desired.

The platform may be mounted on the field, for example, as merely a concrete structure that is floated out onto the field without modules.

This results in better stability and lower buoyancy require¬ ments than for platforms having modules mounted thereon. Here there is an implication of considerable cost savings, particularly for platforms for use at great sea depths.

This platform is very simple to mount: the modules are positioned on the outside of the concrete shaft and are thus situated very securely with respect to possible blowouts or fires in the processing plant. The platform is constructed with suspending or dependent modules, making it possible for the modules to be replaced or removed easily and facilitating the disassembly or, if necessary, the moving of the platform. The suspended modules have a lower steel weight than standing modules, and may be constructed and mounted considerably more inexpensively by means of the described method.

Fig. 16 shows an application of the method for installation of foundation frames, manifold stations, satellites, etc., by means of drilling rigs, tension leg platforms, or the like. The method consists of transferring the equipment to a drilling rig or platform in accordance with the invention, instead of using crane vessels to set the equipment on the sea bed. Thereafter the installation onto the sea bed from the platform is carried out either by means of the lifting gear associated with the drilling rig, or with the aid of the hydraulic lifting machines previously described.