Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
METHOD AND DEVICE FOR PERFORMING TERMINAL SUPPORT INFORMATION PROVIDING PROCEDURE AND HANDOVER PROCEDURE IN WIRELESS COMMUNICATION SYSTEM
Document Type and Number:
WIPO Patent Application WO/2023/171883
Kind Code:
A1
Abstract:
In a wireless communication system, a terminal method may comprise the steps of: receiving a first RRC reconfiguration message including musim-AssistanceConfig IE from a base station; initiating a terminal support information process on the basis that musim-AssistanceConfig is set to setup; if UEAssistanceInformation includes PreferredRRC-State IE, initiating the transmission of UEAssistanceInformation and then starting a first timer set to a first timer value included in musim-AssistanceConfig IE; receiving a second RRC reconfiguration message including ReconfigurationWithSync IE; initiating a second timer; and, when the second timer ends, starting an RRC connection reestablishment procedure and performing one of a first reconfiguration operation set or a second reconfiguration operation set.

Inventors:
KIM SOENGHUN (KR)
Application Number:
PCT/KR2022/019942
Publication Date:
September 14, 2023
Filing Date:
December 08, 2022
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
BLACKPIN INC (KR)
KIM SOENGHUN (KR)
International Classes:
H04W8/24; H04W36/14; H04W36/24; H04W76/27; H04W88/06
Foreign References:
KR20210143047A2021-11-26
Other References:
SAMSUNG: "Remaining issues on network switching for MUSIM", 3GPP DRAFT; R2-2200211, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Online; 20220117 - 20220125, 11 January 2022 (2022-01-11), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP052093413
HUAWEI, HISILICON: "Remaining Issues for NW switching without leaving RRC_CONNECTED", 3GPP DRAFT; R2-2202698, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Online; 20220221 - 20220303, 14 February 2022 (2022-02-14), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP052110601
SAMSUNG: "Further discussion on network switching for MUSIM", 3GPP DRAFT; R2-2109788, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Online; 20211101 - 20211112, 22 October 2021 (2021-10-22), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP052066265
NOKIA, NOKIA SHANGHAI BELL: "Further analysis on the signalling message contents for switching notification", 3GPP DRAFT; R2-2110144, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Electronic; 20211101 - 20211112, 22 October 2021 (2021-10-22), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP052066596
Attorney, Agent or Firm:
YOUNGBEE INTELLECTUAL PROPERTY (KR)
Download PDF: