Abstract:
Methods, systems, and apparatus, including computer programs encoded on computer storage media, for generating paths for a robot based on optimizing multiple objectives. One of the methods includes: receiving, by a motion planner, request to generate a path for a robot between a start point and an end point in a workcell of the robot, wherein the workcell is associated with one or more soft margin values that define spaces in which the robot should avoid when transitioning between points in the workcell; classifying path segments within the workcell as being inside the soft margin or outside the soft margin; generating a respective cost for each of the plurality of path segments within the workcell; generating a plurality of alternative paths; evaluating the plurality of alternative paths according to the respective costs; and selecting an alternative path based on respective total costs of the plurality of alternative paths.

Inventors:
BUTTERFOSS RYAN (US)
DUPUIS JEAN-FRANCOIS (US)
Application Number:
PCT/US2020/048577
Publication Date:
March 04, 2021
Filing Date:
August 28, 2020
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
X DEV (US)
International Classes:
B25J9/16
Foreign References:
US6004016A1999-12-21
Other References:
SHILLER Z ET AL: "ON COMPUTING THE GLOBAL TIME-OPTIMAL MOTIONS OF ROBOTIC MANIPULATORS IN THE PRESENCE OF OBSTACLES", IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, IEEE INC, NEW YORK, US, vol. 7, no. 6, 1 December 1991 (1991-12-01), pages 785 - 797, XP000241558, ISSN: 1042-296X, DOI: 10.1109/70.105387
Attorney, Agent or Firm:
SHEPHERD, Michael P. et al. (US)
Download PDF:
Claims:
CLAIMS

1. A method performed by one or more computers, the method comprising: receiving, by a motion planner, request to generate a path for a robot between a start point and an end point in a workcell of the robot, wherein the workcell is associated with one or more soft margin values that define spaces in which the robot should avoid when transitioning between points in the workcell; classifying a plurality of path segments within the workcell as being inside the soft margin or outside the soft margin; generating a respective cost for each of the plurality of path segments within the workcell, wherein path segments that are inside the soft margin have a higher cost than path segments that are outside the soft margin; generating a plurality of alternative paths between the start point and the end point in the work cell, including generating a first path that passes through at least one waypoint inside the soft margin and generating a second path that does not pass through any waypoints that are inside the soft margin; evaluating the plurality of alternative paths according to the respective costs associated with path segments inside the soft margin and path segments outside the soft margin; and based on the evaluation, selecting an alternative path based on respective total costs of the plurality of alternative paths.

2. The method of claim 1, wherein classifying the plurality of path segments within the workcell as being inside the soft margin or outside the soft margin depends on a specified speed of the robot.

3. The method of claim 1, wherein generating the first path that passes through at least one waypoint inside the soft margin comprises generating a path that lies entirely within the soft margin.

4. The method of claim 1, wherein the path that lies entirely within the soft margin connects two or more waypoints that lie within the soft margin.

5. The method of claim 1, wherein evaluating the plurality of alternative paths comprises evaluating the plurality of alternative paths according to a respective elapsed time required to traverse the path.

6. The method of claim 1, further comprising, for each of the plurality of alternative paths: determining the respective total cost of the alternative path from the respective costs of the plurality of path segments within the alternative path.

7. The method of claim 1, wherein generating the respective cost for each of the plurality of path segments within the workcell further comprises: determining the cost based on one or more of robot swept volume, robot travel distance, margin violation, robot travel time, or usage of hot spots in a predefined heat map of the workcell.

8. A system comprising: one or more computers and one or more storage devices storing instructions that are operable, when executed by the one or more computers, to cause the one or more computers to perform operations comprising: receiving, by a motion planner, request to generate a path for a robot between a start point and an end point in a workcell of the robot, wherein the workcell is associated with one or more soft margin values that define spaces in which the robot should avoid when transitioning between points in the workcell; classifying a plurality of path segments within the workcell as being inside the soft margin or outside the soft margin; generating a respective cost for each of the plurality of path segments within the workcell, wherein path segments that are inside the soft margin have a higher cost than path segments that are outside the soft margin; generating a plurality of alternative paths between the start point and the end point in the work cell, including generating a first path that passes through at least one waypoint inside the soft margin and generating a second path that does not pass through any waypoints that are inside the soft margin; evaluating the plurality of alternative paths according to the respective costs associated with path segments inside the soft margin and path segments outside the soft margin; and based on the evaluation, selecting an alternative path based on respective total costs of the plurality of alternative paths.

9. The system of claim 8, wherein classifying the plurality of path segments within the workcell as being inside the soft margin or outside the soft margin depends on a specified speed of the robot.

10. The system of claim 8, wherein generating the first path that passes through at least one waypoint inside the soft margin comprises generating a path that lies entirely within the soft margin.

11. The system of claim 8, wherein the path that lies entirely within the soft margin connects two or more waypoints that lie within the soft margin.

12. The system of claim 8, wherein evaluating the plurality of alternative paths comprises evaluating the plurality of alternative paths according to a respective elapsed time required to traverse the path.

13. The system of claim 8, wherein the operations further comprise, for each of the plurality of alternative paths: determining the respective total cost of the alternative path from the respective costs of the plurality of path segments within the alternative path.

14. The system of claim 8, wherein generating the respective cost for each of the plurality of path segments within the workcell further comprises: determining the cost based on one or more of robot swept volume, robot travel distance, margin violation, robot travel time, or usage of hot spots in a predefined heat map of the workcell.

15. A computer storage medium encoded with a computer program, the program comprising instructions that are operable, when executed by data processing apparatus, to cause the data processing apparatus to perform the operations comprising: receiving, by a motion planner, request to generate a path for a robot between a start point and an end point in a workcell of the robot, wherein the workcell is associated with one or more soft margin values that define spaces in which the robot should avoid when transitioning between points in the workcell; classifying a plurality of path segments within the workcell as being inside the soft margin or outside the soft margin; generating a respective cost for each of the plurality of path segments within the workcell, wherein path segments that are inside the soft margin have a higher cost than path segments that are outside the soft margin; generating a plurality of alternative paths between the start point and the end point in the work cell, including generating a first path that passes through at least one waypoint inside the soft margin and generating a second path that does not pass through any waypoints that are inside the soft margin; evaluating the plurality of alternative paths according to the respective costs associated with path segments inside the soft margin and path segments outside the soft margin; and based on the evaluation, selecting an alternative path based on respective total costs of the plurality of alternative paths.

16. The computer storage medium of claim 15, wherein classifying the plurality of path segments within the workcell as being inside the soft margin or outside the soft margin depends on a specified speed of the robot.

17. The computer storage medium of claim 15, wherein generating the first path that passes through at least one waypoint inside the soft margin comprises generating a path that lies entirely within the soft margin.

18. The computer storage medium of claim 15, wherein the path that lies entirely within the soft margin connects two or more waypoints that lie within the soft margin.

19. The computer storage medium of claim 15, wherein evaluating the plurality of alternative paths comprises evaluating the plurality of alternative paths according to a respective elapsed time required to traverse the path.

20. The computer storage medium of claim 15, wherein the operations further comprise, for each of the plurality of alternative paths: determining the respective total cost of the alternative path from the respective costs of the plurality of path segments within the alternative path.

Description:
MULTI-OBJECTIVE ROBOT PATH PLANNING

BACKGROUND

This specification relates to robotics, and more particularly to planning robotic movements.

Robotics planning refers to scheduling the physical movements of robots in order to perform tasks. For example, an industrial robot that builds cars can be programmed to first pick up a car part and then weld the car part onto the frame of the car. Each of these actions can themselves include dozens or hundreds of individual movements by robot motors and actuators.

Robotics planning has traditionally required immense amounts of manual programming in order to meticulously dictate how the robotic components should move in order to accomplish a particular task. Manual programming is tedious, time-consuming, and error prone. In addition, a schedule that is manually generated for one workcell can generally not be used for other workcells. In this specification, a workcell is the physical environment in which a robot will operate. Workcells have particular physical properties, e.g., physical dimensions, that impose constraints on how robots can move within the workcell. Thus, a manually programmed schedule for one workcell may be incompatible with a workcell having different physical dimensions.

In many industrial robotics applications, the primary success or failure criteria of a schedule is the time it takes to complete a task. For example, at a welding station in a car assembly line, the time it takes for robots to complete welds on each car is a critical aspect of overall throughput of the factory. When using manual programming, it is often difficult or impossible to predict how long the resulting schedule will take to complete the task.

SUMMARY

This specification describes how a system can generate paths for a robot based on optimizing multiple objectives. In general, a path specifies a transition of the robot from a starting joint configuration to a goal joint configuration. The multiple objectives can include, for example, avoiding collision, shortening travel time, reducing travel distance, and so on.

Particular embodiments of the subject matter described in this specification can be implemented so as to realize one or more of the following advantages. Using transformers to iteratively manipulate a process definition graph to generate a robotics plan dramatically reduces the amount of manual programming required in order to program robots. The system can generate a fully constrained plan for an arbitrary number of robots from an initial underconstrained process definition graph. Using a process definition graph makes specifying robot actions more flexible, faster, and less error-prone. In addition, the techniques described below allow for exploring a much larger search space than what could be achieved by mere manual programming. Therefore, the resulting schedules are likely to be faster and more efficient than manually programmed schedules.

Generally, this allows for a system to generate robotics plans with respect to an arbitrary number of given objectives. In particular, using some techniques described in this specification, the system can generate a plan that effectively accounts for potential tolerances associated with these objectives. For example, the system can generate a plan that strictly avoids intruding certain regions (“hard margins”), e.g., regions into which by the robot will cause unfavorable collision with a known obstacle, while taking discretionary advantage of penetrable regions (“soft margins”), e.g., peripheral areas surrounding (or even slightly penetrate into) the known obstacle. Generating plans in this way allows for the system to generate flexible plans that adapt to workcell-specific geometries, including non-rigid geometries, despite innate inaccuracies in robot maneuvers.

Using some techniques described in this specification, the system can generate reasonably optimal plans based on the prototype design of a workcell even in cases where the exact spatial constraints within the workcell are yet unknown. For example, the system can generate plans by accounting for, or taking advantage of (e.g., through slight violation), placeholder constraints including simple geometric primitives used to represent more complex objects that will be designed later, older versions of a part in the workcell that is to be redesigned, or the like, while ensuring that such plans can present meaningful and reasonably accurate information to a system operator, e.g., for use in estimation of the amount of time the overall process will take.

Using some techniques described in this specification, the system can further assign respective weights to a range of objectives including, for example, avoiding collision, shortening travel time, reducing travel distance, and so on. The respective weights can be adjusted to adapt to the requirements of particular tasks that involve robot operations. By assigning different weights to different objectives, the system can generate plans that effectively accounts for, or balances between, spatial constraints within the workcell and concerns about resource (i.e., time, energy, or both) consumption. Based on simultaneously optimizing multiple weighted objectives, the system can generate robotics plans with certain flexibility that can be desirable in various use cases. For example, the system can generate a plan for a robot which minimizes risk of collision while maximizing overall efficiency of execution.

The details of one or more embodiments of the subject matter of this specification are set forth in the accompanying drawings and the description below. Other features, aspects, and advantages of the subject matter will become apparent from the description, the drawings, and the claims.

BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a diagram that illustrates an example system.

FIG. 2 is a flowchart of an example process for iteratively applying transformers to generate a final process definition graph.

FIG. 3 illustrates an example underconstrained process definition graph.

FIGS. 4A-B illustrate generating transitions for a portion of a process definition graph.

FIG. 5 is a visual illustration of a schedule.

FIG. 6 is a flowchart of an example process for generating transitions.

FIGS. 7A-B illustrate example path planning graphs.

Like reference numbers and designations in the various drawings indicate like elements.

DETAILED DESCRIPTION

FIG. 1 is a diagram that illustrates an example system 100. The system 100 is an example of a system that can implement the techniques described in this specification.

The system 100 includes a number of functional components, including a process definer 110, a planner 120, a collection of transformers 130, a user interface device 140, an onsite execution engine 150, and a robot interface subsystem 160. Each of these components can be implemented as computer programs installed on one or more computers in one or more locations that are coupled to each other through any appropriate communications network, e.g., an intranet or the Internet, or combination of networks.

The system 100 also includes a workcell 170 that includes N robots 170a-n. The overall goal of the planner 120 and other components of the system 100 is to generate, from the underconstrained process definition graph 115, a schedule that will be executed by the robots 170a-n to accomplish one or more tasks. The resulting schedule can be represented in a variety of ways and may be represented as a near-fully constrained or a fully constrained process definition graph, e.g., the workcell-specific process definition graph 135. As mentioned above, a common goal metric for such schedules is elapsed time, and thus the planner 120 can aim to generate a schedule that causes the robots 170a-n to accomplish the one or more tasks in the shortest possible amount of time.

In this specification, a robot is a machine having a base position, one or more movable components, and a kinematic model that can be used to map desired positions, poses, or both in one coordinate system, e.g., Cartesian coordinates, into commands for physically moving the one or more movable components to the desired positions or poses. In this specification, a tool is a device that is part of and is attached at the end of the kinematic chain of the one or more moveable components of the robot. Example tools include grippers, welding devices, and sanding devices. That is, a robot can include one or more tools.

In this specification, a task is an operation to be performed by a tool. For brevity, when a robot has only one tool, a task can be described as an operation to be performed by the robot as a whole. Example tasks include welding, glue dispensing, part positioning, and surfacing sanding, to name just a few examples. Tasks are generally associated with a type that indicates the tool required to perform the task, as well as a position within a workcell at which the task will be performed.

In this specification, a motion plan is a data structure that provides information for executing an action, which can be a task, a cluster of tasks, or a transition. Motion plans can be fully constrained, meaning that all values for all controllable degrees of freedom for the robot are represented explicitly or implicitly; or underconstrained, meaning that some values for controllable degrees of freedom are unspecified. In some implementations, in order to actually perform an action corresponding to a motion plan, the motion plan must be fully constrained to include all necessary values for all controllable degrees of freedom for the robot. Thus, at some points in the planning processes described in this specification, some motion plans may be underconstrained, but by the time the motion plan is actually executed on a robot, the motion plan can be fully constrained. In some implementations, motion plans represent edges in a task graph between two configuration states for a single robot. Thus, generally there is one task graph per robot. In some implementation, a motion plan can include instructions for the robot to “rest,” i.e., to stay in the current position.

In this specification, a motion swept volume is a region of the space that is occupied by at least a portion of a robot or tool during the entire execution of a motion plan. The motion swept volume can be generated by collision geometry associated with the robot-tool system.

In this specification, a transition is a motion plan that describes a movement to be performed between a start point and an end point. The start point and end point can be represented by poses, locations in a coordinate system, or tasks to be performed. Transitions can be underconstrained by lacking one or more values of one or more respective controllable degrees of freedom (DOF) for a robot. Some transitions represent free motions. In this specification, a free motion is a transition in which none of the degrees of freedom are constrained. For example, a robot motion that simply moves from pose A to pose B without any restriction on how to move between these two poses is a free motion. During the planning process, the DOF variables for a free motion are eventually assigned values, and path planners can use any appropriate values for the motion that do not conflict with the physical constraints of the workcell.

In this specification, a schedule is data that assigns each task to at least one robot. A schedule also specifies, for each robot, a sequence of actions to be performed by the robot. A schedule also includes dependency information, which specifies which actions must not commence until another action is finished. A schedule can specify start times for actions, end times for actions, or both.

To initiate schedule generation, a user can provide a process description 105 and workcell-specific information 107 to a process definer 110. The process description 105 can include a high-level description of the tasks to be completed. The workcell-specific information 107 can include data that represents properties of the workcell, including physical dimensions, the locations and dimensions of obstacles or other hardware in the workcell, the type and number of robots 170a-n in the workcell.

From the process description 105 and the workcell-specific information, the process definer 110 can generate an underconstrained process definition graph 115. Alternatively or in addition, a user can provide the underconstrained process definition graph 115 to the planner 120. In this specification, a process definition graph, or for brevity, a graph, is a directed acyclic graph having constraint nodes and action nodes.

Action nodes represent actions for a robot to perform, which can include nodes representing tasks or clusters of tasks, e.g., as specified in the original process description.

Action nodes can also represent transitions that robots can perform, e.g., transitions between tasks or other locations in the workcell.

Constraint nodes represent particular relationships between children nodes that must be preserved in any schedule. In general, constraint nodes can represent existence constraints or time constraints. An existence constraint specifies a constraint on which children can be selected. A time constraint specifies a constraint on the timing among children. For example, a constraint node can have as children two action nodes, and the constraint node can represent a time constraint that a first action represented by a first of the two action nodes must start before a second action represented by a second of the two action nodes.

Being an underconstrained process definition graph means that the graph lacks various kinds of information required to actually drive the robots 170a-n to accomplish the tasks. The graph can be underconstrained in a variety of ways. For example, the graph can lack any sense of time, scheduling, or ordering between tasks. Being underconstrained can also mean that various properties of task nodes are partially defined or undefined.

Thus, in some implementations the planner 120 can receive a process definition graph 115 having nodes representing the tasks to be performed as specified by the process description, but without specifying any ordering between the tasks, without specifying any assignment of any of the robots 170a-n to any of the tasks, and without specifying what movements the robots should undertake in order to prepare to perform the tasks.

The planner 120 can then perform an iterative process to begin solving constraints in the underconstrained process definition graph 115. The final output of this process is data representing a schedule, which can be a workcell-specific process definition graph 135, which, for brevity may also be referred to as a final schedule. The workcell-specific process definition graph 135 contains enough information to drive the robots 170a-n to complete the one or more tasks specified in the original underconstrained process definition graph 115. Thus, the workcell-specific process definition graph 135 will generally specify which robots will be performing which tasks. The workcell-specific process definition graph 135 can also specify the timing, scheduling, ordering and movement actions to be taken by each robot between tasks. Additionally, the movements specified by the workcell-specific process definition graph 135 can take into account the physical attributes and obstacles of the workcell 170.

The onsite execution engine 150 receives the workcell-specific process definition graph 135 and issues commands 155 to the robot interface system 160 in order to actually drive the movements of the moveable components, e.g., the joints, of the robots 170a-n. In some implementations, the robot interface subsystem 160 provides a hardware-agnostic interface so that the commands 155 issued by onsite execution engine 150 are compatible with multiple different versions of robots. During execution the robot interface subsystem 160 can report execution data 157 back to the onsite execution engine 150 so that the onsite execution engine 150 can make real-time or near real-time adjustments to the robot movements, e.g., due to local faults or other unanticipated conditions.

In execution, the robots 170a-n generally continually execute the commands specified explicitly or implicitly by the motion plans to perform the various tasks or transitions of the schedule. The robots can be real-time robots, which means that the robots are programmed to continually execute their commands according to a highly constrained timeline. For example, each robot can expect a command from the robot interface subsystem 160 at a particular frequency, e.g., 100 Hz or 1 kHz. If the robot does not receive a command that is expected, the robot can enter a fault mode and stop operating.

In some implementations, the planner 120 and the process definer 110 are cloud-based systems that are physically removed from a facility that physically houses the workcell 170, while the onsite execution engine 150 is local to the facility that physically houses the workcell 150. This arrangement allows the planner 120 to use massive cloud-based computing resources to consider many possibilities for robot schedules, while also allowing for real-time reaction to unanticipated events by the onsite execution engine 150.

As stated above, the planner 120 can generate a workcell-specific process definition graph 135 from the initial underconstrained process definition graph 115. To do so, the planner 120 can repeatedly apply a number of transformers from a collection of transformers 130. Each transformer is a stateless function that takes as input an underconstrained process definition graph and resolves variables in the underconstrained process definition graph. As part of this process, a transformer can modify action nodes, constraint nodes, or both, by adding, modifying, or deleting these nodes, and generates as output a modified process definition graph. This process is described in more detail below with reference to FIG. 2.

The transformers to be used can also be specified by a user as a transformer configuration 117. In other words, the user can specify which of the collection of transformers 130 are to be used when iteratively modifying the initial underconstrained process definition graph 115.

The planner 120 can also optionally invite users to make transformer selections while generating a final schedule. In other words, the planner 120 can provide a candidate process definition graph 123 to a user interface device 140. The user interface device 140 can then present a user interface that allows a user to input a user transformer selection 125, which directs the planner 120 to perform the next iteration using a transformer selection 127 specified by the user. This interactive process can allow the planner 120 to take into consideration constraints and other real-world considerations that were not or could not be specified as part of the original process description.

FIG. 2 is a flowchart of an example process for iteratively applying transformers to generate a final process definition graph. The process can be implemented by one or more computer programs installed on one or more computers and programmed in accordance with this specification. For example, the process can be performed by the planner 120 shown in FIG. 1. For convenience, the process will be described as being performed by a system of one or more computers.

The system receives an underconstrained process definition graph (210). As described above, a process definition graph is a directed acyclic graph that can include at least two different types of nodes, constraint nodes and action nodes.

FIG. 3 illustrates an example underconstrained process definition graph 300. The graph includes a root node 310, two constraint nodes 322 and 324, and six action nodes 332, 334, 342, 344, 346, and 348.

Each of the action nodes represents one or more physical actions to be performed by a particular robot. For example, an action node can represent an action to move a robot arm, apply a weld, open a gripper, close a gripper, or any other appropriate action that can be performed by a robot. Action nodes can also be composite actions that include multiple other actions. For example, a PickAndPlace composite action can include a separate pick action and a place action. Notably, the action nodes need not specify which robot in a workcell will perform each action. The action nodes can be partially defined either by specifying some values, e.g., a duration or a location for each action. The action nodes can also be partially defined by specifying options, e.g., a list or a range of acceptable durations.

The AllOflnOrder constraint node 322 specifies that its children nodes have to be performed in a particular order. In other words, the constraint node 322 introduces a constraint that Action 1, represented by the action node 332, has to occur before any of the other actions, and that Action 7, represented by the action node 334, has to occur after any of the other actions.

The AllOf constraint node 322 specifies simply that all of its children have to be performed, but does not specify an ordering. Thus, through the iterative planning process, the planner is free to schedule Actions 3-6 in any appropriate order that does not violate any other constraints in the graph.

One concrete example of an application that might use a graph similar to the graph 300 is welding a part in a factory. For example, the initial action node 332 can represent an action that moves the part into place, and the final action node 334 can represent an action to move the part to its destination. Those are examples of actions that have to happen first and last, as specified by the AllOflnOrder constraint node 322.

Actions 3-6 can be welding actions for 4 separate weld points on the part. For most welding applications, the order does not matter. Thus, while the AllOf constraint node 324 imposes a constraint that all welds have to be performed, the AllOf constraint node 324 does not impose any constraints on the ordering in which the welds must be performed.

Instead, the planner will use various transformers in order to search the space of schedules that satisfy the constraints imposed by the final graph and choose a schedule that is best according to a particular objective function. For example, the planner can simply search the space of schedules that satisfy the constraints and identify which schedule executes all the actions the fastest.

TABLE 1 lists some common constraint node types.

TABLE 1

A constraint node can combine multiple constraint node types. For example, in this notation, the AllOflnOrder node had a name that specified two constraint types, both the AllOf constraint type as well as the InOrder constraint type.

As shown in FIG. 2, the system applies local transformers (220). As described above, each transformer is a function that further constrains the process definition by assigning values to variables or manipulating or expanding nodes in the graph.

In general a system can apply a transformer by matching certain patterns associated with nodes in the graph. As one example, applying a transformer can include looking for underconstrained properties in the graph and assigning values to those properties. As another example, a transformer can have one or more defined node types as input and the system can determine that the transformer is a match for the node types when a matching arrangement of nodes found in the graph.

The system can distinguish between local transformers and global transformers and apply local transformers first. A local transformer is a transformer that does not require reconsideration of all nodes in the graph and which affects only a sufficiently small subset of the graph. The system can use any appropriate definition for what is a sufficiently small subset of the graph, e.g., only transformers that affect their direct children or nodes not more than N links away. As a particular example, a local transformer can be applied to a single node in the graph.

An example of a global transformer is a “clustering” transformer, which takes consideration all tasks in the graph that change the position of one or more robots, and proposes ordering constraints that ensure that the robots move efficiently between tasks (for example, avoiding doubling back by robots where possible).

The system can apply local transformers first in order to quickly generate many additional constraints in the graph. For example, if an action node has a particular pose, the system can apply an inverse kinematics (IK) transformer that will generate the kinematic parameters for achieving the pose. Thus, for a given pose, the system can consider an IK transformer to be a local transformer because the transformer affects only a single action node.

As will be described in more detail below with respect to FIGS. 6-7, the system generates transitions (230). Transitions are actions taken by robots to move from one configuration to another. Thus, if two actions are to be performed by a robot in sequence, the system can generate a transition between the actions by determining how the robot can move from a pose for one action to a pose for another. In some implementations, the system implements transition generators as transformers that seek to match on two action nodes in sequence that so far have no assigned intermediate transition.

Some transformers are designed to generate many alternative options that can all be considered when performing scheduling. For example, when generating transitions, the system can generate multiple different ways of moving from one action to another. The system can represent each generated alternative transition as a separate node in the graph. Since only one transition is needed, the system can constrain the alternatives with an appropriate OneOf constraint node.

FIGS. 4A-B illustrate generating transitions for a portion 400a of a process definition graph. In FIG. 4A, an AllOflnOrder constraint node 410 represents that a welding action represented by an action node 420 should be performed before a welding action represented by another action node 430. In some implementations, during transition generation the system searches the graph for gaps between sequenced actions that lack transitions. Thus, the system can identify the portion 400a as a portion of the graph having two sequenced actions but lacking a transition between them.

FIG. 4B illustrates a modified portion 400b of the process definition graph after transition generation. As shown, the system generated four alternative transitions for transitioning between the action node 420 and the action node 430. Each alternative transition is represented by its own action node, e.g., the transition nodes 450, 460, 470, and 480. The transition nodes 450-480 are constrained by a OneOf constraint node 440 that represents that the system should execute one and only one of the generated alternative transitions.

This example illustrates how transformers can add additional constraints to the graph in the form of alternatives rather than selections. In other words, the transformers seek to increase the space of possible alternative schedules rather than attempting to solve the constraints of a schedule in one pass.

Therefore, after the system performs transition generation, the process definition graph typically has many more nodes that it previously did, with each node representing a possible transition between actions.

As shown in FIG. 2, the system performs conflict identification (240). In other words, the system identifies actions in the graph that cannot occur at the same time, the same space, or both. For example, the system can generate a swept volume for each action node in the graph and identify which actions are potentially conflicting. Notably, the system can perform the conflict identification process before scheduling occurs. The system can then perform a deconfliction process after scheduling occurs. In other words, the system identifies conflicts before scheduling, but need not strive to avoid conflicts during scheduling.

The system performs scheduling (250). In general, the scheduling process solves for underconstrained values in the graph until either no more values need to be solved or the system determines that no solution can be found. As described above, a schedule specifies one robot to perform each task, and for each robot, a sequence of actions to be performed. A schedule can also specify a start time for each action and dependencies between actions.

For example, to perform scheduling, the system can receive as input a set of possible graphs, e.g., a set of every possible alternative graph that can be generated from the graph and that accomplishes the required tasks. The system can process the set of possible graphs to generate an output that is a selection of action nodes to execute as well as dependencies (i.e., a selection of constraint nodes) that specify requirements of the schedule. That is, the output of the scheduling process can be an updated graph, generated from the original graph, with extra constraints that remove the uncertainties of the original graph.

As a particular example, referring to the example depicted in FIG. 4B, the output of the scheduling process might be a graph that includes an AllOflnOrder node with three child nodes 420, 460, and 430. That is, the system selected the second transition 460 from the set of possible transitions 450, 460, 470, and 480, removing the uncertainty of the OneOf node 440.

As another particular example, there may be a situation where two robots need to cross each other, the system can identify (e.g., during conflict identification) the constraint that the two robots cannot collide when crossing each other. The output of the scheduling process can therefore include a scheduling constraint that ensures that the two robots do not perform the movement at the same time, for example, by generating a dependency between the completion of the first movement and the beginning of the second movement (e.g., using an InOrder node or a MustNotOccurDuring node).

In general, the system can use a variety of solvers to determine that no more constraints need to be solved. For example, the system can use a circuit solver to determine when sequenced starting and ending points have no gaps in between. If gaps remain, the system can use transition generation to fill the gaps or raise an error if no solution exists.

The system can also insert rests into the actions and adjust the values of the rests in order to find a scheduling solution. For example, one perhaps not ideal schedule is that a robot can perform an action and then wait for all other robots to finish their tasks before doing anything else. But by using rests, the system increases the chances that a scheduling solution can be found.

As part of the scheduling process, the system can assign tasks to individual robots in the workcell. Thus, at the end of the scheduling process, the system can generate a visual representation of which tasks are performed by which robots and when.

FIG. 5 is a visual illustration of a schedule. The information illustrated in FIG. 5 can still be represented as a process definition graph. And in fact, the deconfliction process that occurs after scheduling can operate on the process definition graph generated by the scheduling process. However, the visualization shown in FIG. 5 is useful for understanding the constraints encoded into the graph. In FIG. 5, three robotic components in a workcell have been assigned to perform a variety of tasks. Time generally moves from left to right in FIG. 5, and the arrows represent time ordered constraints between actions by different robotic components. For actions performed by the same robotic component, the ordering of the actions implies a time ordered constraint.

Thus, the example schedule illustrated in FIG. 5 first has the fixturing 510 of the workcell perform a part transfer 512 and then a close clamps action 514. For example, the close clamps action 514 can represent clamps closing down on the part to secure it for welding.

At some time after the transfer 512 starts, the first robot 520 performs a joint move 522 to get into position for welding. However, the action weld action 524 cannot happen until the actual clamps are closed, as illustrated by the arrow from the closed clamps action 514 to the weld action 524.

At some time after the clamps are closed, a second robot 530 performs a joint move 532 to get into position for a weld 534. The joint move 532 also has a constraint that it has to happen after the clamps are closed by the close clamps action 514.

The first robot 520 can then perform a second joint move 526 to get into position for the second weld 528, but not until the second robot has finished its joint move 532, as represented by the arrow from the joint move 532 to the joint move 526. The first robot can then perform the second weld 528.

Finally, the fixturing 510 can open the clamps with an open clamps action 516, but not until both welds 528 and 534 are completed. The fixturing 510 can then perform a transfer action 518 to move the part along in an assembly line.

As shown in FIG. 2, the system performs deconfliction (260). In general, the deconfliction process also uses transformers that aim to solve possible conflicts in the schedule. As described above, although conflicts may have been identified before scheduling, the scheduler was not necessarily bound by such conflicts during scheduling. In general, generating an initial solution using an underconstrained graph that ignores some conflicts provides computational advantages over trying to solve all constraints and all possible conflicts in one pass.

The system optionally runs additional user-selected transformers (270). As described above, the system can provide a user interface that seamlessly allows some human design in the process. In particular, the system can present a user interface that allows a user to manually specify a next transformer to be applied in the graph or some other manipulation of the graph.

As part of this user interface, the system can also present a graphical simulation of the robots executing a particular candidate schedule. For example, if a particular transition between actions seems too awkward or otherwise not ideal, a human can manually select a different transition.

As another example, humans tend to be better at performing geometric or spatial groupings.

Thus, a human may want to impose a Cluster constraint node for a particular group of actions that are close together in space, time, or both. This process is described in more detail below with reference to FIG. 6.

The system determines whether a goal has been reached (280). The system can use a goal solver to determine whether a process definition graph meets various goal criteria. As mentioned above, total time is often a critical goal criterion. Each action in the schedule can be associated with a respective duration, and then the system can use the respective durations to determine whether a schedule exists that meets the goal criteria. The system can also use other goal criteria, for example, power used, or some combined score of multiple goal criteria.

If the goal is reached (280), the system outputs the final schedule (branch to 285). For example, the final schedule can then be provided to an onsite execution engine for execution by robots in a workcell.

If the goal is not reached, the system determines whether to perform more iterations (290). In some implementations, the system automatically performs another iteration as long as the system has not determined that a solution is not possible. The system can alternatively or in addition perform an additional iteration only if a maximum number of iterations has not been reached.

If no more iterations are to be performed and the goal has not been reached, the system can raise an error (branch to 295). At that point, the users can determine whether to modify the original process definition in order to try to find a valid solution with different inputs.

In some implementations, as depicted in FIG. 2, if more iterations are to be performed, the system returns to step 220 and reapplies local transformers. In some other implementations, the system can return to step 240 to perform another round of conflict identification. That is, the system might not need to reapply the local transformers or to generate transitions again.

One of the advantages to representing all phases of the planning process as a process definition graph is that the history of the process is represented very explicitly. The state of the schedule as it evolved over the iterations becomes quite clear. This allows actions to be easily undone and the schedule’s modifications rewound in time and tried again with different transformers or parameters. This also makes debugging the schedules much easier because it becomes clear how the schedule got to where it is and by which transformers.

In some implementations, the system can perform the process depicted in FIG. 2 multiple times to generate multiple different candidate schedules. For example, the system might perform the process multiple times in parallel, e.g., by selecting different sequences of transformations to generate the different candidate schedules. The system can then select the final schedule from the set of candidate schedules according to one or more criteria, e.g., a time to complete the one or more required tasks, a measure of efficiency, a measure of safety, etc. That is, the system can search the space of possible schedules by evaluating different transformation sequences. As a particular example, the system might evaluate a particular sequence of transformation sequences and determine to “backtrack” to a particular transformation in the sequence and being a new subsequence from that point.

FIG. 6 is a flowchart of an example process 600 for evaluating alternative paths that sometimes take advantage of soft margin constraints. The process 600 can be implemented by one or more computer programs installed on one or more computers and programmed in accordance with this specification. For example, the process 600 can be performed by the planner 120 shown in FIG. 1. For convenience, the process 600 will be described as being performed by a system of one or more computers.

The system receives request to generate a path for a robot (610) between a start point and an end point in a workcell of the robot. Specifically, a start point corresponds to a starting configuration of the robot, and an end point corresponds to a goal configuration.

Depending on the particular request, the system can generate a path using any of a variety of path planning algorithms including, for example, grid-based search, geometric algorithms, and reward-based algorithms.

As a particular example, the system can generate a path using sampling-based algorithms. In order to generate a path for a robot using sampling-based algorithms, the system begins with sampling a plurality of possible configurations of the robot within the workcell. These sampled configurations are referred to as waypoints. In brief, each waypoint represents a particular configuration of the robot which typically specifies respective parameters of the joints, and, optionally, the rigid bodies (i.e., arms) of the robot. The parameters in turn (at least implicitly) define a position of the robot within the workcell. More specifically, depending on the number of joints that are included in the robot, each waypoint can represent any of a variety of multi degree of freedom robot joint configurations. In this particular example, the system also discards any sampled waypoints corresponding to robot configurations that are in collision, e.g., with an obstacle in the workcell or with the robot itself.

FIGS. 7A-B illustrate example path planning graphs. As shown in FIG. 7 A, the system constructs a planning graph based on connecting the sampled waypoints via path segments, which are represented in FIG. 7A as straight lines. In some cases, the system only connects neighboring waypoints. Every pair of connected waypoints in the workcell specifies a possible transition path between which the robot can traverse.

In some implementations, the workcell is further associated with one or more soft margin values that define spaces in which the robot should avoid when transitioning between waypoints in the workcell. Specifically, upon reaching these spaces, the robot has a high likelihood of causing a collision, e g., either with an obstacle or with the robot itself, especially when the speed of the robot is above a predetermined value.

As shown in FIG. 7 A, contour 714 corresponds to the hard margin values which are defined by, for example, the boundary of the workcell, the range of movement of the robot, and the like. Region 724 corresponds the hard margin values which can be defined by one or more obstacle that are located (at least partially) within the workcell. Region 716 corresponds to free space in which the robot can move freely without causing any collisions, and regions 710 and 712 correspond to soft margin values. Given the present soft margin values, waypoint 706 can be considered to be outside of the soft margin, while waypoint 712 can be considered to be inside the soft margin. In addition, points 702 and 704 correspond to the start and end points of the path, respectively.

The system classifies the plurality of path segments within the workcell (620) as being inside the soft margin or outside the soft margin.

In some implementations, the classification depends on a specified speed of the robot. That is, the soft margin values can be proportional to the speed of the robot. A robot that is configured to move at higher speeds typically results in higher soft margin values, i.e., collisions are likely to occur in a greater space within the workcell. In order to perform the classification, the system can first identify all path segments that cross the boundary between the soft margins and free spaces. For example, as shown in FIG. 7B, the system identifies path segment 752 as one of such path segments. In this example, the path segment 752 crosses the boundary at waypoint 754.

In addition, for each such path segments, the system can partition the path segment into two sub path segments - a first sub path segment that lies entirely within the soft margin, and a second sub path segment that lies entirely within the free space. For example, as shown in FIG. 7B, the system partitions the path segment that crosses the boundary at waypoint 732 into a first sub path segment 746 that lies entirely within the soft margin, and a second sub path segment 748 that lies entirely within the free space.

It should be noted that, while being named differently, both path segments and sub path segments specify possible transition paths between which the robot can traverse. Therefore, for convenience, the description below will only refer to path segments, even when sub path segments could also be referred to.

The system generates a respective cost for each of the plurality of path segments (630) within the workcell. Corresponding values of the costs can be determined using a cost function which can evaluate any of a variety of suitable metrics of the performance of the robot. For example, the cost functions can evaluate one or more of the metrics including, robot swept volume, robot travel distance, e.g., in terms of joint distance or Cartesian distance, margin violation, usage of hot spots in a predefined heat map of the workcell, and so on. In some implementations, the system combines respective cost values that are determined based on the metrics to generate a combined cost for each of the plurality of path segments. In such implementations, for each path segment, the system can further combine respective cost values based on predetermined weights that are assigned to the metrics.

In particular, when evaluating the margin violation metric, the system assigns higher cost values to path segments that are inside the soft margin than path segments that are outside the soft margin, i.e., path segments that are within the free space.

The system generates a plurality of alternative paths (640) between the start point and the end point in the work cell. In general, a path connects a plurality of waypoints and in turn includes at least one path segment. For example, the system generates a first path that passes through at least one waypoint inside the soft margin. In some implementations, the first path lies entirely within the soft margin. That is, the first path connects two or more waypoints that lie within the soft margin.

As another example, the system generates a second path that does not pass through any waypoints that are inside the soft margin.

In a more concrete example, the system is requested to generate multiple paths for an industrial robot that performs welding actions at three welding stations which are positioned in a row. Correspondingly, the system generates a first path which allows the robot to slightly venture into the soft margin, e g., entering spatial area that is in close proximity to the welding stations and other obstacles within the workcell, during movement while remaining a safe distance from obstacles. The system also generates a second path which requires the robot to always lift upwards and exit the soft margin before entering into the next welding station, thus greatly increasing overall travel time of the robot.

The system evaluates the plurality of alternative paths (650) according to the respective costs associated with path segments inside the soft margin and path segments outside the soft margin. As described above, for at least the margin violation metric, the path segments that are inside the soft margin generally have higher costs than path segments that are outside the soft margin.

In some implementations, the system further evaluates the plurality of alternative paths according to one or more other metrics. For example, the system evaluates the plurality of alternative paths according to a respective elapsed time required for the robot to traverse the path. That is, for the elapsed time metric, the path segments that require longer traversing time generally have higher costs than path segments that require shorter traversing time.

The system then proceeds to select a path based at least on the result of the evaluation. During the evaluation, for each alternative path, the system also determines a total cost of the alternative path from the respective costs of the plurality of path segments within the alternative path. The system can do so by combining respective costs assigned to the path segments that are included in the alternative path to generate a total cost for the path. In some implementations, the system then selects an alternative path that satisfies one or more predetermined criteria. Such criteria may specify, for example, the total cost of the selected path should be either below or above a predetermined threshold cost value. As a particular example, the criteria specifies that a path having the lowest total cost should be selected. In this example, both margin violation and elapsed time costs are evaluated. Moreover, passing through a waypoint that lies inside the soft margin can save a huge amount of time that is otherwise required for the robot to traverse without violating the margin. In other words, a first path that passes though the waypoint has a lower total cost than other alternative paths that do not pass through any waypoints inside the margin.

Accordingly, the system selects an alternative path (660) based on respective total costs of the plurality of alternative paths. The selected path in turn specifies a transition of the robot.

In the welding example given above, the system selects the first path that passes through the waypoint inside the soft margin. This allows the robot to take advantage of movement into the soft margin, e.g., after determining that the first path has a lower total cost than the second path when both margin violation and elapsed time costs are evaluated.

In some implementations, the system then submits, e.g., via a data communication network, the selected first path as a plan to an onsite execution engine for execution by one or more robots.

In some implementations, the system submits the selected first path to a user interface device. The user interface device can present a user interface that allows a user to inspect and review the path that has been generated for a robot. Optionally, the user interface device can receive a user input which specifies a selection of the path, a modification to the path, or both.

The robot functionalities described in this specification can be implemented by a hardware- agnostic software stack, or, for brevity just a software stack, that is at least partially hardware-agnostic. In other words, the software stack can accept as input commands generated by the planning processes described above without requiring the commands to relate specifically to a particular model of robot or to a particular robotic component. For example, the software stack can be implemented at least partially by the onsite execution engine 150 and the robot interface subsystem 160 of FIG. 1.

The software stack can include multiple levels of increasing hardware specificity in one direction and increasing software abstraction in the other direction. At the lowest level of the software stack are robot components that include devices that carry out low-level actions and sensors that report low-level statuses. For example, robots can include a variety of low-level components including motors, encoders, cameras, drivers, grippers, application-specific sensors, linear or rotary position sensors, and other peripheral devices. As one example, a motor can receive a command indicating an amount of torque that should be applied. In response to receiving the command, the motor can report a current position of a joint of the robot, e.g., using an encoder, to a higher level of the software stack.

Each next highest level in the software stack can implement an interface that supports multiple different underlying implementations. In general, each interface between levels provides status messages from the lower level to the upper level and provides commands from the upper level to the lower level.

Typically, the commands and status messages are generated cyclically during each control cycle, e.g., one status message and one command per control cycle. Lower levels of the software stack generally have tighter real-time requirements than higher levels of the software stack. At the lowest levels of the software stack, for example, the control cycle can have actual real-time requirements. In this specification, real-time means that a command received at one level of the software stack must be executed and optionally, that a status message be provided back to an upper level of the software stack, within a particular control cycle time. If this real time requirement is not met, the robot can be configured to enter a fault state, e.g., by freezing all operation.

At a next-highest level, the software stack can include software abstractions of particular components, which will be referred to motor feedback controllers. A motor feedback controller can be a software abstraction of any appropriate lower-level components and not just a literal motor. A motor feedback controller thus receives state through an interface into a lower-level hardware component and sends commands back down through the interface to the lower-level hardware component based on upper-level commands received from higher levels in the stack.

A motor feedback controller can have any appropriate control rules that determine how the upper-level commands should be interpreted and transformed into lower-level commands. For example, a motor feedback controller can use anything from simple logical rules to more advanced machine learning techniques to transform upper-level commands into lower-level commands. Similarly, a motor feedback controller can use any appropriate fault rules to determine when a fault state has been reached. For example, if the motor feedback controller receives an upper-level command but does not receive a lower-level status within a particular portion of the control cycle, the motor feedback controller can cause the robot to enter a fault state that ceases all operations.

At a next-highest level, the software stack can include actuator feedback controllers. An actuator feedback controller can include control logic for controlling multiple robot components through their respective motor feedback controllers. For example, some robot components, e.g., a joint arm, can actually be controlled by multiple motors. Thus, the actuator feedback controller can provide a software abstraction of the joint arm by using its control logic to send commands to the motor feedback controllers of the multiple motors.

At a next-highest level, the software stack can include joint feedback controllers. A joint feedback controller can represent a joint that maps to a logical degree of freedom in a robot.

Thus, for example, while a wrist of a robot might be controlled by a complicated network of actuators, a joint feedback controller can abstract away that complexity and expose that degree of freedom as a single joint. Thus, each joint feedback controller can control an arbitrarily complex network of actuator feedback controllers. As an example, a six degree-of-freedom robot can be controlled by six different joint feedback controllers that each control a separate network of actual feedback controllers.

Each level of the software stack can also perform enforcement of level- specific constraints. For example, if a particular torque value received by an actuator feedback controller is outside of an acceptable range, the actuator feedback controller can either modify it to be within range or enter a fault state.

To drive the input to the joint feedback controllers, the software stack can use a command vector that includes command parameters for each component in the lower levels, e.g., a position, torque, and velocity, for each motor in the system. To expose status from the joint feedback controllers, the software stack can use a status vector that includes status information for each component in the lower levels, e.g., a position, velocity, and torque for each motor in the system. In some implementations, the command vectors also include some limited information regarding constraints to be enforced by the controllers in the lower levels.

At a next-highest level, the software stack can include joint collection controllers. A joint collection controller can handle issuing of command and status vectors that are exposed as a set of part abstractions. Each part can include a kinematic model, e.g., for performing inverse kinematic calculations, limit information, as well as a joint status vector and a joint command vector. For example, a single joint collection controller can be used to apply different sets of policies to different subsystems in the lower levels. The joint collection controller can effectively decouple the relationship between how the motors are physically represented and how control policies are associated with those parts. Thus, for example if a robot arm has a movable base, a joint collection controller can be used to enforce a set of limit policies on how the arm moves and to enforce a different set of limit policies on how the movable base can move.

At a next-highest level, the software stack can include joint selection controllers. A joint selection controller can be responsible for dynamically selecting between commands being issued from different sources. In other words, a joint selection controller can receive multiple commands during a control cycle and select one of the multiple commands to be executed during the control cycle. The ability to dynamically select from multiple commands during a real-time control cycle allows greatly increased flexibility in control over conventional robot control systems.

At a next-highest level, the software stack can include joint position controllers. A joint position controller can receive goal parameters and dynamically compute commands required to achieve the goal parameters. For example, a joint position controller can receive a position goal and can compute a set point for achieving the goal.

At a next-highest level, the software stack can include Cartesian position controllers and Cartesian selection controllers. A Cartesian position controller can receive as input goals in Cartesian space and use inverse kinematics solvers to compute an output in joint position space. The Cartesian selection controller can then enforce limit policies on the results computed by the Cartesian position controllers before passing the computed results in joint position space to a joint position controller in the next lowest level of the stack. For example, a Cartesian position controller can be given three separate goal states in Cartesian coordinates x, y, and z. For some degrees, the goal state could be a position, while for other degrees, the goal state could be a desired velocity.

These functionalities afforded by the software stack thus provide wide flexibility for control directives to be easily expressed as goal states in a way that meshes naturally with the higher-level planning techniques described above. In other words, when the planning process uses a process definition graph to generate concrete actions to be taken, the actions need not be specified in low-level commands for individual robotic components. Rather, they can be expressed as high-level goals that are accepted by the software stack that get translated through the various levels until finally becoming low-level commands. Moreover, the actions generated through the planning process can be specified in Cartesian space in a way that makes them understandable for human operators, which makes debugging and analyzing the schedules easier, faster, and more intuitive. In addition, the actions generated through the planning process need not be tightly coupled to any particular robot model or low-level command format. Instead, the same actions generated during the planning process can actually be executed by different robot models so long as they support the same degrees of freedom and the appropriate control levels have been implemented in the software stack.

Embodiments of the subject matter and the functional operations described in this specification can be implemented in digital electronic circuitry, in tangibly-embodied computer software or firmware, in computer hardware, including the structures disclosed in this specification and their structural equivalents, or in combinations of one or more of them. Embodiments of the subject matter described in this specification can be implemented as one or more computer programs, i.e., one or more modules of computer program instructions encoded on a tangible non-transitory storage medium for execution by, or to control the operation of, data processing apparatus. The computer storage medium can be a machine-readable storage device, a machine-readable storage substrate, a random or serial access memory device, or a combination of one or more of them. Alternatively or in addition, the program instructions can be encoded on an artificially-generated propagated signal, e.g., a machine-generated electrical, optical, or electromagnetic signal, that is generated to encode information for transmission to suitable receiver apparatus for execution by a data processing apparatus.

The term “data processing apparatus” refers to data processing hardware and encompasses all kinds of apparatus, devices, and machines for processing data, including by way of example a programmable processor, a computer, or multiple processors or computers. The apparatus can also be, or further include, special purpose logic circuitry, e g., an FPGA (field programmable gate array) or an ASIC (application-specific integrated circuit). The apparatus can optionally include, in addition to hardware, code that creates an execution environment for computer programs, e.g., code that constitutes processor firmware, a protocol stack, a database management system, an operating system, or a combination of one or more of them. A computer program which may also be referred to or described as a program, software, a software application, an app, a module, a software module, a script, or code) can be written in any form of programming language, including compiled or interpreted languages, or declarative or procedural languages, and it can be deployed in any form, including as a stand-alone program or as a module, component, subroutine, or other unit suitable for use in a computing environment. A program may, but need not, correspond to a file in a file system. A program can be stored in a portion of a file that holds other programs or data, e.g., one or more scripts stored in a markup language document, in a single file dedicated to the program in question, or in multiple coordinated files, e.g., files that store one or more modules, sub-programs, or portions of code. A computer program can be deployed to be executed on one computer or on multiple computers that are located at one site or distributed across multiple sites and interconnected by a data communication network.

For a system of one or more computers to be configured to perform particular operations or actions means that the system has installed on it software, firmware, hardware, or a combination of them that in operation cause the system to perform the operations or actions. For one or more computer programs to be configured to perform particular operations or actions means that the one or more programs include instructions that, when executed by data processing apparatus, cause the apparatus to perform the operations or actions.

As used in this specification, an “engine,” or “software engine,” refers to a software implemented input/output system that provides an output that is different from the input. An engine can be an encoded block of functionality, such as a library, a platform, a software development kit (“SDK”), or an object. Each engine can be implemented on any appropriate type of computing device, e.g., servers, mobile phones, tablet computers, notebook computers, music players, e-book readers, laptop or desktop computers, PDAs, smart phones, or other stationary or portable devices, that includes one or more processors and computer readable media. Additionally, two or more of the engines may be implemented on the same computing device, or on different computing devices.

The processes and logic flows described in this specification can be performed by one or more programmable computers executing one or more computer programs to perform functions by operating on input data and generating output. The processes and logic flows can also be performed by special purpose logic circuitry, e.g., an FPGA or an ASIC, or by a combination of special purpose logic circuitry and one or more programmed computers.

Computers suitable for the execution of a computer program can be based on general or special purpose microprocessors or both, or any other kind of central processing unit. Generally, a central processing unit will receive instructions and data from a read-only memory or a random access memory or both. The essential elements of a computer are a central processing unit for performing or executing instructions and one or more memory devices for storing instructions and data. The central processing unit and the memory can be supplemented by, or incorporated in, special purpose logic circuitry. Generally, a computer will also include, or be operatively coupled to receive data from or transfer data to, or both, one or more mass storage devices for storing data, e.g., magnetic, magneto-optical disks, or optical disks. However, a computer need not have such devices. Moreover, a computer can be embedded in another device, e.g., a mobile telephone, a personal digital assistant (PDA), a mobile audio or video player, a game console, a Global Positioning System (GPS) receiver, or a portable storage device, e.g., a universal serial bus (USB) flash drive, to name just a few.

Computer-readable media suitable for storing computer program instructions and data include all forms of non-volatile memory, media and memory devices, including by way of example semiconductor memory devices, e.g., EPROM, EEPROM, and flash memory devices; magnetic disks, e.g., internal hard disks or removable disks; magneto-optical disks; and CD- ROM and DVD-ROM disks.

To provide for interaction with a user, embodiments of the subject matter described in this specification can be implemented on a computer having a display device, e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor, for displaying information to the user and a keyboard and pointing device, e.g., a mouse, trackball, or a presence sensitive display or other surface by which the user can provide input to the computer. Other kinds of devices can be used to provide for interaction with a user as well; for example, feedback provided to the user can be any form of sensory feedback, e.g., visual feedback, auditory feedback, or tactile feedback; and input from the user can be received in any form, including acoustic, speech, or tactile input. In addition, a computer can interact with a user by sending documents to and receiving documents from a device that is used by the user; for example, by sending web pages to a web browser on a user’s device in response to requests received from the web browser. Also, a computer can interact with a user by sending text messages or other forms of message to a personal device, e.g., a smartphone, running a messaging application, and receiving responsive messages from the user in return.

Embodiments of the subject matter described in this specification can be implemented in a computing system that includes a back-end component, e.g., as a data server, or that includes a middleware component, e.g., an application server, or that includes a front-end component, e.g., a client computer having a graphical user interface, a web browser, or an app through which a user can interact with an implementation of the subject matter described in this specification, or any combination of one or more such back-end, middleware, or front-end components. The components of the system can be interconnected by any form or medium of digital data communication, e.g., a communication network. Examples of communication networks include a local area network (LAN) and a wide area network (WAN), e.g., the Internet.

The computing system can include clients and servers. A client and server are generally remote from each other and typically interact through a communication network. The relationship of client and server arises by virtue of computer programs running on the respective computers and having a client-server relationship to each other. In some embodiments, a server transmits data, e.g., an HTML page, to a user device, e.g., for purposes of displaying data to and receiving user input from a user interacting with the device, which acts as a client. Data generated at the user device, e.g., a result of the user interaction, can be received at the server from the device.

While this specification contains many specific implementation details, these should not be construed as limitations on the scope of any invention or on the scope of what may be claimed, but rather as descriptions of features that may be specific to particular embodiments of particular inventions. Certain features that are described in this specification in the context of separate embodiments can also be implemented in combination in a single embodiment. Conversely, various features that are described in the context of a single embodiment can also be implemented in multiple embodiments separately or in any suitable subcombination. Moreover, although features may be described above as acting in certain combinations and even initially be claimed as such, one or more features from a claimed combination can in some cases be excised from the combination, and the claimed combination may be directed to a subcombination or variation of a subcombination. Similarly, while operations are depicted in the drawings in a particular order, this should not be understood as requiring that such operations be performed in the particular order shown or in sequential order, or that all illustrated operations be performed, to achieve desirable results. In certain circumstances, multitasking and parallel processing may be advantageous. Moreover, the separation of various system modules and components in the embodiments described above should not be understood as requiring such separation in all embodiments, and it should be understood that the described program components and systems can generally be integrated together in a single software product or packaged into multiple software products.

Particular embodiments of the subject matter have been described. Other embodiments are within the scope of the following claims. For example, the actions recited in the claims can be performed in a different order and still achieve desirable results. As one example, the processes depicted in the accompanying figures do not necessarily require the particular order shown, or sequential order, to achieve desirable results. In certain some cases, multitasking and parallel processing may be advantageous.