Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
OPTIMIZED METHOD FOR SORTING ALARMS
Document Type and Number:
WIPO Patent Application WO/2015/131916
Kind Code:
A1
Abstract:
The invention relates to a method for sorting alarm-messages (30, 32, 64, 98, 100,102) of a plant (1, 20, 80, 160) having at least one alarm-area (22, 82, 84, 162, 164) each having at least two plant-devices (2, 4, 24, 26) connected by at least one connection, wherein the at least one alarm-area (22, 82, 84, 162, 164) is defined so that the plant-devices (2, 4, 24, 26) and the respective connection provide a directed graph (28, 86, 88, 90), comprising the following steps: ⋅ providing at least one database (34, 122) containing alarm-data (36, 124) and topology-data (38, 126); wherein ⋅ the topology-data (38, 26) describe a directed graph (28, 86, 88, 90) comprising at least one connection with a related flow direction between the respective plant-devices (2, 4, 24, 26) of the respective assigned alarm-area (22, 82, 84, 162, 164); ⋅ generating at least one partly complete first alarm-order (16, 60) of the alarm-messages (30, 32, 64, 98, 100, 102) of the at least one alarm-area (22, 82, 84, 162, 164) by ⋅ sorting the alarm-messages (30, 32, 64, 98, 100, 102) according to the flow direction of the directed graph (28, 86, 88, 90).

Inventors:
HOERNICKE MARIO (DE)
HOLLENDER MARTIN (DE)
ROYSTON STEVE (GB)
Application Number:
PCT/EP2014/000575
Publication Date:
September 11, 2015
Filing Date:
March 06, 2014
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
ABB TECHNOLOGY AG (CH)
International Classes:
G05B23/02
Foreign References:
US5914875A1999-06-22
US20100019894A12010-01-28
US20030046027A12003-03-06
US20060190584A12006-08-24
EP1331536A12003-07-30
US5581242A1996-12-03
Other References:
None
Attorney, Agent or Firm:
KOCK, Ina (GF-IPWallstadter Str. 59, Ladenburg, DE)
Download PDF:
Claims:
Claims

1-A method for sorting alarm-messages (30, 32, 64, 98, 100, 102) of a plant (1 , 20, 80, 160) having at least one alarm-area (22, 82, 84, 162, 164) each having at least two plant-devices (2, 4, 24, 26) connected by at least one connection, wherein the at least one alarm-area (22, 82, 84, 162, 164) is defined so that the plant-devices (2, 4, 24, 26) and the respective connection provide a directed graph (28, 86, 88, 90), comprising the following steps: a) providing at least one database (34, 122) containing alarm-data (36, 124) and topology-data (38, 126); wherein

the alarm-data (36, 124) describe at least in part the relation between the respective plant-devices (2, 4, 24, 26) and the respective assigned alarm- area (22, 82, 84, 162, 164);

- the topology-data (38, 26) describe a directed graph (28, 86, 88, 90) comprising at least one connection with a related flow direction between the respective plant-devices (2, 4, 24, 26) of the respective assigned alarm-area (22, 82, 84, 162, 164); b) retrieving alarm-messages (30, 32, 64, 98, 100, 102) from plant-devices (2, 4, 24, 26); c) associating, at least in part, the alarm-messages (30, 32, 64, 98, 100, 102) with the respective alarm-area (22, 82, 84, 62, 164) according to the alarm-data (36, 124); d) generating at least one partly complete first alarm-order (16, 60) of the alarm- messages (30, 32, 64, 98, 100, 102) of the at least one a\arm-area (22, 82, 84, 162, 164) by

■ sorting the alarm-messages (30, 32, 64, 98, 100, 102) according to the flow direction of the directed graph (28, 86, 88, 90); ■ assigning the sorted alarm-messages (30, 32, 64, 98, 100, 102) to the first alarm-order (16, 60); e) storing at least the first-up alarm-message (62, 92, 94, 96) of the first alarm-order (16, 60).

2- The method according to claim 1 , characterized by the further step:

■ reducing the directed graph (28, 86, 88, 90) to the relevant plant-devices (2, 4, 24, 26) which are generating alarm-messages (30, 32, 64, 98, 100, 102) , before the step of generating the at least one partly complete first alarm-order (16, 60).

3- The method according to claim 1 or 2, wherein a diagram (130, 162, 164) of the plant (1 , 20, 80, 160) and at least one respective alarm-area template is provided for defining the at least one alarm-area (22, 82, 84, 162, 164) at least partly automatically, wherein the alarm-area template comprises information relating to a structure of a typical alarm-area with typical plant-devices (2, 4, 24, 26) and/or connections; characterized by the further steps:

■ searching plant-devices (2, 4, 24, 26) and/or respective connections from the diagram (130, 162, 164) according to the structure of at least one alarm-area template;

■ assigning the at least partly recognized plant-devices (2, 4, 24, 26) and/or respective connections to sections of the structure of the respective alarm- area template;

■ defining the at least one alarm-area (22, 82, 84, 162, 64) at least partly automatically by assigning the plant-devices (2, 4, 24, 26) and/or respective connections of the respective alarm-area template. 4- The method according to claim 3, characterized in that a method of pattern recognition is foreseen to detect elements such as plant-devices (2, 4, 24, 26) and/or connections such as valves, flow pipe segments, tanks pumps, drives or sensors.

5- The method according to any of the proceeding claims, wherein at least one functional-structure of the plant (1 , 20, 80, 160) is provided, wherein the functional- structure describes the structure of the plant-devices (2, 4, 24, 26) and/or connections at least part/ally in areas, characterized by the further step:

■ defining the at least one alarm-area (22, 82, 84, 162, 164) at least partially automatically according to the functional-structure.

6- The method according to any of the proceeding claims, wherein the database (34, 122) further contains rule-data (128) defining at least one rule for at least one alarm- order differing at least partially from the flow direction of the directed graph (28, 86, 88, 90), further comprising the following steps:

■ verifying the generated first alarm-order (16, 60) with respect to the rule-data (128);

■ generating at least one partially complete second alarm-order (104) by: o sorting the alarm-messages (30, 32, 64, 98, 100, 102) according to the rule-data (128) and the flow-direction of the directed graph (28, 86, 88, 90); o assigning the sorted alarm-messages (30, 32, 64, 98, 100, 102) to the second alarm-order (104)

• storing at least the first up alarm-message (62, 92, 94, 96) of the second alarm-order (104). 7- The method according to any of the proceeding claims, wherein

the plant (1 , 20, 80, 160) comprises several alarm-areas (22, 82, 84, 162, 164);

■ the topology-data (16) further describes a directed graph (28, 86, 88, 90) comprising at least one connection with a related flow direction between respective plant-devices (2, 4, 24, 26) of the several alarm-areas (22, 82, 84, 162, 164); further comprising the following steps:

retrieving the respective first-up alarm-messages (62, 92, 94, 96) of the several alarm-areas (22, 82, 84, 162, 164);

■ generating at least one partially complete third alarm-order (104) of the respective first-up alarm-messages (62, 92, 94, 96), by

■ sorting the first-up alarm messages (62, 92, 94, 96) according to the flow direction of the directed graph (28, 86, 88, 90);

• assigning the sorted first-up alarm-messages (62, 92, 94, 96) to the third alarm-order (104);

■ storing at least the first-up alarm-message (62, 92, 94, 96) of the third alarm-order (104).

8- The method according to any of the proceeding claims, wherein the flow direction describes a material flow direction, an information flow direction, or an energy flow direction.

Description:
Optimized method for sorting alarms

Description

The invention relates to a method for sorting at least two alarms of a plant, having at least one alarm-area with at least two connected plant-devices.

In the state of the art alarm messages of process and manufacturing plants are very important. Alarm messages are used to inform operators about dangerous states of a process or even of the entire plant in order to react accordingly and drive the process back into a normal state. Alarm messages are generated by plant-devices, for example sensors or pumps.

Hence, alarm-messages are used to indicate a required action to the operator. For example, when a tank level reaches a certain limit, an alarm is raised that shows that the tank reached a high level. According to the alarm-message and the respective message text that is shown to the operator, for example in an alarm list, the operator can act and, for example, open a valve and start a pump to decrease the level inside the tank. When an alarm appeared, it is usually visualized in an alarm list or it is visualized in a human machine interface directly at the device. Hence, the operator has then the chance to react on those alarms.

The term "plant-device" comprises every device which is able to create an alarm directly or indirectly, for example a pump, a valve or even a reactor. Today ' s plants usually have a considerable number of plant-devices.

The term "sorting" relates to all activities which are related to bring several alarms of different plant-devices in an order. In the state of the art, alarm-messages are time- stamped to get the order of the different alarms and show the operator which one is supposed to have appeared first in time.

Disadvantageously within the state of the art is, that several plant-devices in the plant are able to create alarms. Those alarm-messages are propagated very fast through the system which leads often to high alarm rates. As there might be a certain time span between the generation of the alarm-message and the time stamping it is often very inaccurate. Hence, often several alarm-messages have the same time stamp, therefore the alarm-messages cannot be sorted according to the allocated time- stamp properly and the first-up alarm is not detected automatically. Thus, the foreseen alarm-message rate of 10 alarms per 10 minutes is often exceeded and an operator can be overloaded with redundant alarms. Furthermore, the operator is required to evaluate the entire alarm-messages manually in order to get the root cause of the problem. Therefore the operator can not react immediately, which leads to unnecessary shut-downs and production losses.

The time-stamped based sorting of the alarm-messages might be inaccurate because the time-stamp can be inaccurate as:

• Fieldbuses or Modbus might add a time stamp very late and imprecise (e.g. in a time span of +/- 4 seconds);

• Alarms might originate in different subsystems with clocks that are not synchronized;

• Process dynamics can cause delays. For example a reaction might increase the temperature, but it might take time until this increase reaches the sensor, e.g. because of the slow dynamic behavior of the vessel;

• Cycle times inside the controllers cause imprecision.

Based on this state of the art it is the objective of the invention to provide a method to improve the sorting of alarms.

This objective is accomplished according to the present invention by a method for sorting alarm-messages of a plant having at least one alarm-area each having at least two plant-devices connected by at least one connection, wherein the at least one alarm-area is defined so that the plant-devices and the respective connection provide a directed graph, comprising the following steps:

a) providing at least one database containing alarm-data and topology-data; wherein

the alarm-data describe at least in part the relation between the respective plant-devices and the respective assigned alarm-area;

the topology-data describe a directed graph comprising at least one connection with a related flow direction between the respective plant- devices of the respective assigned alarm-area;

b) retrieving alarm-messages from plant-devices;

c) associating, at least in part, the alarm-messages with the respective alarm-area according to the alarm-data;

d) generating at least one partly complete first alarm-order of the alarm-messages of the at least one alarm-area by

sorting the alarm-messages according to the flow direction of the directed graph;

assigning the sorted alarm-messages to the first alarm-order;

e) storing at least the first-up alarm-message of the first alarm-order.

In the following, the term "first-up alarm-message" is referred to as an alarm- message of the plant-device which is in the first position in the flow-direction of the plant. This is often the most important alarm-message, since it shows the root cause plant-device which causes the following depending alarm-messages. In the following the term "alarm-message" is often shortened as "alarm".

The term "directed graph" refers to the dependencies and relationships between the different plant devices in the plant.

The term "flow direction" refers to the direction of the directed graph, wherein the direction is determined for example from a material flow, an energy flow or an information flow.

The term "alarm-area" refers to a defined area which comprises at least two plant devices. The alarm-area can be defined in that way, that an unambiguous directed graph is defined therein. The alarm-area comprises usually a tree structure, which enables advantageously the finding of the root-cause, in this case the first-up alarm. A tree-structure is a hierarchical structure, with a root node as a parent node and subtrees of children represented as a set of nodes which are linked by edges. A tree- structure is a linked tree with a group of nodes, wherein each node represents a plant-device and a list of references to other nodes, advantageously to its children nodes. The hierarchy of the tree-structure is advantageously used for sorting the alarm-messages automatically.

As each plant device might generate at least one alarm-message in an alarm-area a group of alarm-messages might occur therein.

In contrast to the state of the art, the alarm messages are sorted according to the flow direction within the plant topology and not according to the time-stamping. Advantageously, time stamping is not required anymore and the problems with inaccurate time-stamping are circumvented.

The invented method uses the directed graph with the respective flow direction to navigate from specific alarm-messages backward in the flow direction to evaluate whether an alarm has been propagated through the system from a plant-device which is in a topological earlier point located. Based on this, the invented algorithm is applied to determine which alarm-message appeared first and which alarm-message is a follow-up alarm-message. In conclusion, it is a time-stamp independent method of sorting alarm-messages.

Advantageously, the operator does not need to evaluate the consistency of the generated alarm-order by comparing it with the plant-topology manually. As the alarm-order is generated automatically by the invented method it becomes increasingly trustworthy. Furthermore advantageously, an operator is provided faster with the information which is the first root cause plant-device. This enables the operator to solve the problem quicker and restore the plant to normal operating conditions. Hence, the downtime of the plant due to late reaction of the operator is effectively reduced. The invented method is a model based time independent method which is typically running on a computing-unit, for example a usual personal computer or a processing- unit of the plant. Therefore the time stamping becomes obsolete and the amount of required time-measurement hardware is also reduced. Of course a combination of the sorting according to the flow direction and according to the time-stamping is further possible and might be combined. In case of contradictory results of the different sorting methods the topology-dependent sorting can be advantageously ranked higher.

According to a preferred development of the invention the directed graph is reduced to the relevant plant-devices which are generating alarm-messages, before the step of generating the at least one partly complete first alarm-order.

Hence, the directed graph of the flow is reduced to the relevant plant equipment that raised an alarm and the respective connections. The relevant plant-devices are also referred to as nodes and the respective connections are also referred to as edges of the tree-structure of the directed graph. As only the relevant nodes and edges are taken into account, the comparing of the alarm-messages and therefore the finding of the relevant first-up alarm is significantly accelerated with the same available processing power of the computing-unit.

In another advantageous development a diagram of the plant and at least one respective alarm-area template is provided for defining the at least one alarm-area at least partly automatically, wherein the alarm-area template comprises information relating to a structure of a typical alarm-area with typical plant-devices and/or connections. It is characterized by the further steps:

■ searching plant-devices and/or respective connections from the diagram according to the structure of at least one alarm-area template;

■ assigning the at least partly recognized plant-devices and/or respective connections to sections of the structure of the respective alarm-area template; defining the at least one alarm-area at least partly automatically by allocating the plant-devices and/or respective connections of the respective alarm-area template.

By searching plant devices and/or respective connections automatically from the provided diagram according to the structure of at least one alarm-area template the generation of alarm-areas is automated and therefore advantageously accelerated. Due to the automatic definition the accuracy of the alarm-area definition is furthermore advantageously increased.

The alarm-area template contains information about the structure of the plant-devices and the respective connections. Hence, the alarm-area template describes already a certain alarm-area. An alarm-area template comprises sections, wherein each section typically defines a placeholder for a specific plant-device or a connection. The structure of the sections is exemplary stored in a table or an array.

The respective records of the table or the array define the plant-devices and the respective connections of the alarm-area. Furthermore advantageously, a tree- structure of the directed-graph of the respective alarm-area is incorporated in the records. Hence, the assignment of the plant-devices and the connections to the alarm-areas is advantageously generated automatically. For each instance of a template alarm-area, an alarm area is created which is further used to group the alarm-messages. In case that the assignment of the plant-devices and the connections to the alarm-areas cannot be fully automated, missing parts can be added by manual intervention of the user.

The provided diagram can exemplary be a Human Machine Interface (HMI) diagram of the plant, wherein the graphics and object information of the HMI are reused for the generation of the alarm-area. An HMI diagram of the plant or a sub-part thereof is typically available in an early stage of the engineering phase of a plant since the subparts are usually engineered individually from each other. An HMI diagram is a graphic which is presented to a user for further interaction during operation of a plant. Although not all the necessary information must be present in the HMI, at least large parts of the alarm-area can be advantageously generated from it. According to another exemplary development of the invention a method of pattern recognition is foreseen to detect elements such as plant-devices and/or connections such as valves, flow pipe segments, tanks pumps, drives or sensors.

The computer readable form of the HMI diagram is preferably in a graphical form, thus the typical graphical for objects and connections can be detected by the method of pattern recognition, for example by use of artificial neural networks. Hence, the elements are predefined and then detected automatically from the provided HMI diagram which simplifies the creation of alarm-areas significantly.

In another advantageous development at least one functional-structure of the plant is provided, wherein the functional-structure describes the structure of the plant-devices and/or connections at least partially in areas, characterized by the further step:

defining the at least one alarm-area at least partially automatically according to the functional-structure.

Functional-structures are typically generated during planning and engineering of the plant. Therefore functional-structures are typically structured as the plant itself is structured. A plant is usually structured in larger areas within the plant and the larger equipment and/or control solution within a larger area. Advantageously the functional structure is reused to define the respective alarm area automatically. By reusing the functional-structure of the plant for structuring the alarm-areas, it is simpler for the user to review the automatically structured alarm-areas as he is more familiar thereto.

According to another advantageous embodiment the database further contains rule- data defining at least one rule for at least one alarm-order differing at least partially from the flow direction of the directed graph, further comprising the following steps:

■ verifying the generated first alarm-order with respect to the rule-data;

■ generating at least one partially complete second alarm-order by: o sorting the alarm-messages according to the rule-data and the flow- direction of the directed graph; o assigning the sorted alarm-messages to the second alarm-order

storing at least the first up alarm-message of the second alarm-order.

The rule-data comprises rules which are automatically incorporated in the developed method. The relating rules define an alarm-order that differs at least partially from the flow direction of the directed graph. The alarm-order might differ due to various reasons from the flow-direction, for example in case of backpressure in a pipe system. Backpressure refers to the effect that the pressure remains and causes flow in the same direction, but the flow is reduced due to resistance. A valve located in flow direction behind a valve could be wrongly detected as the root cause, although the root cause is pump tripping. By considering the rule-data, the pump tripping is detected as the root cause. Hence, by incorporating rule-data, also root causes which are differing from the flow direction are advantageously detected.

In a preferred form of the invention,

■ the plant comprises several alarm-areas;

■ the topology-data further describes a directed graph comprising at least one connection with a related flow direction between respective plant-devices of the several alarm-areas;

further comprising the following steps:

■ retrieving the respective first-up alarm-messages of the several alarm-areas;

■ generating at least one partially complete third alarm-order of the respective first-up alarm-messages, by

o sorting the first-up alarm messages according to the flow direction of the directed graph;

o assigning the sorted first-up alarm-messages to the third alarm-order;

■ storing at least the first-up alarm-message of the third alarm-order.

A plant typically comprises several alarm-areas, wherein each alarm-area has typically at least one directed graph with a defined flow-direction. The several alarm- areas are also depending on each other by directed graphs. Hence, the claimed method is extended to compare the several first-up alarms of the several alarm- areas. In other words the first-up alarm of an alarm area must not necessarily be the root cause as the respective alarm area is connected to several further alarm areas which might have further first-up alarms. One alarm-area can cause a problem that is propagated into a further alarm area. Therefore the dependencies between the first- up alarm-messages of the different alarm-areas are also considered.

As the number of alarm-messages is significantly increasing in case of several alarm- areas, each generating at least one alarm-message, the invented method is even more advantageously as more alarm-messages have to be compared among each other. Therefore the generated alarm-messages are sorted across the several alarm- areas depending on the topology. Hence, a tree-structure of the directed-graph which connects the different alarm-areas might be advantageously used for sorting the respective first-up alarms. According to the sorting the alarm-messages are furthermore also priotised and the amount of alarms presented to the user is advantageously reduced.

Advantageously, only one first-up alarm message is presented to the operator and the further alarm-order is only presented after selecting it manually. Therefore, the user is prevented from alarm-flooding and consequently each first-up alarm-message can be taken more seriously.

In a preferred form of the invention, the flow direction describes a material flow direction, an information flow direction, or an energy flow direction.

Based on the respective flow, the dependencies and relationships between different plant-devices in the plant are mapped. The material flow can be a fluid flowing through a pipe, wherein the energy flow is for example energy used for heating up a tank. The information flow can exemplary comprise the information flowing between sensors and an actuators or between control objects and control loops. Furthermore the energy flow is used to describe a direction of the energy flowing in the plant from energy sources to energy sinks. In order to detect the first-up alarm the material flow is described as directed graph and shows in which order the material is flowing through the plant devices. The material, the energy flow and the information flow therefore describe a direction of the production in a time independent manner and can therefore be used to detect the first-up alarm.

The advantages of this method and their embodiments are discussed in the preceding claims.

These features and further advantageous embodiments are contained in the claims and shall be illustrated by means of exemplary in the figures contained in the drawing attached to this specification.

The attached drawing show in

Fig. : an exemplary computing unit for running a method according to the invention,

Fig. 2: an exemplary second architecture of a second plant,

Fig. 3: an exemplary first alarm-order,

Fig. 4: an exemplary third architecture of a third plant,

Fig. 5: an exemplary fourth architecture of a fourth plant,

Fig. 6: an exemplary fifth architecture of a fifth plant,

Fig. 7: an exemplary directed graph,

Fig. 8: an exemplary alarm-hierarchy,

Fig. 9: an exemplary sequence diagram and

Fig. 10: an exemplary tree structure.

Fig 1 depicts exemplary a first computing unit 12 for executing a method according to the invention. The computing unit 12 is connected to an input device 8, to a display 14 and to a first plant 1. The architecture of the first plant 1 comprises two interconnected plant devices, a first plant device 2 and a second plant device 4.

A user 6 specifies his user input 10 via the input-device 8, exemplary a keyboard or a usual computer mouse. The user input 10 is further processed by the computing device 12, wherein further data are provided by the connected first plant 1 and the respective plant devices 2, 4. The display 14 is exemplary used for displaying an alarm order 16 with two alarm messages, wherein each alarm indicates a required action to the user 6. According on the alarm-messages of the alarm-order 16 the user 6 can react and operate the plant-devices 2, 4.

Not depicted in the figure is, that the computing unit 12 can be exemplary provided in a computing cloud, instead of being provided physically. Besides the computing unit 12 can be integrated in a distributed-control-system of the plant 1 itself. The computing unit 1 can comprise a database, or a connection to one or several single databases of the distributed control system of the first plant 1.

Fig. 2 depicts an exemplary architecture of a second plant 20. The second plant 20 comprises two plant devices, a third plant-device 24 which is connected via a first directed graph 28 to a fourth plant devices 26. The two plant-devices 24, 26 form exemplary a first alarm-area 22. The first and second plant-device 24, 26 generate exemplary a first alarm-message 30 and a second alarm-message 32.

The second plant 20 is exemplary connected to a second computing-device 40 which comprises exemplary a first database 34 and a respective processing unit. The first database 34 comprises first alarm-data which associates the first alarm message 30 with the third plant device 24 and the second alarm-message 32 with the fourth plant- device 26. Furthermore, the first database 34 comprises exemplary first topology data 38 containing data which describe a directed graph 28 with a related flow direction between the third plant device 24 and the fourth plant device 26. The directed graph 28 shows exemplary in which order the material flow is going through the active plant-devices 24, 26.

The first alarm-area 22 represents in this example a group of alarms. For each group, the algorithm for finding first-up alarms within this area is applied. Not depicted in the figure is, that the user might also define in which part of the topology the evaluation is supposed to take place. Not depicted in the figure is the following exemplary algorithm, which might be applied to detect the first-up alarm of the first alarm-area 22:

- Step 1 : Get one alarm-message 32 and the corresponding plant-device 26.

- Step 2: Store the plant-device 26 and the corresponding alarm-message 32 as "first-up alarm".

- Step 3: Get another alarm message 30 and the corresponding plant-device 24.

- Step 4: Compare the "first-up alarm" with the other alarm message 24 by means of location in the flow direction according to the directed graph 28.

- Step 5: If the "first-up alarm" is in an earlier or equal position in the flow direction according to the directed graph 28 continue with step 7.

- Step 6: Otherwise, store the other alarm as "first-up alarm"

- Step 7: If there are other alarms present with the same time stamp, continue with step 3.

- Step 8: Otherwise, "first-up alarm" is the first-up alarm.

An example of the sorting algorithm is given in the following according to Fig. 2:

If a further plant device, which is not depicted, is situated before the plant-devices 24 and 26 in the flow-direction and the further plant device is "valve 1", the third plant- device 24 is "valve 2" and the fourth plant-device is "valve 3" this means that the algorithm works exemplary the following:

- Compare "valve 3 alarm" and "valve 2 alarm" and store "valve 2 alarm" as first-up alarm

- Compare "valve 2 alarm" and "valve 1 alarm" and store "valve 1 alarm" as first up- alarm

- Result: "first-up alarm" is "valve 1 alarm"

Fig. 3 depicts a first alarm-order 60 with two alarm messages 62, 64, wherein the first-up alarm message 62 is exemplary determined by the invented method as being in the flow direction before the third alarm-message 64. Not depicted in the figure is, that only the determined first-up alarm can be presented to the user directly, wherein the further third alarm-message might be available upon a manual request.

Fig. 4 shows a third plant 80 comprising two alarm-areas, a second alarm-area 82 and a third alarm-area 84. The plant devices of the second 82 and third alarm-area 84 are connected by a respective second directed graph 86 and a respective third directed graph 88. The two alarm-areas 82, 84 are connected by a fourth directed graph 90.

Exemplary each of the plant devices of the second alarm-area 82 generates an alarm-message. Wherein the generated alarm messages are sorted according to the invented method and a fourth alarm order 108 is generated, which comprises the fourth first-up alarm message 94 and the fifth alarm-message 00.

Accordingly, the third alarm area 84 comprises two plant devices which generate a second first-up alarm message 92 and a fourth first-up alarm message 98. In this example, each alarm-are 82, 84 generated a separate first up alarm 92, 84, wherein the first-up alarms have been detected by the algorithm according to the invented method.

In a further exemplary step, the flow direction of the fourth directed graph 90 is used to evaluate which alarm message of the second first-up alarm message 92 and the fourth first up alarm message appears earlier. Therefore the fourth directed graph 90, which describes the dependencies between the second alarm-area 82 and the third alarm-area 84 can be used for the further evaluation. Hence, the second and the fourth first-up alarm message are compared according to the invented method, wherein the evaluation results exemplary in the hierarchy depicted in the third alarm- order 104. According to the exemplary flow direction of the fourth directed graph the first-up alarm message of the third alarm area 84 is before the first-up alarm message of the second alarm-area 82.

Therefore the comparison procedure can be used to hierarchically arrange the alarms of different alarm-areas. If the first-up alarm of one alarm-area is not the root- cause of the failure, the hierarchy shows the dependencies to different alarm-areas. Hence, the operator can navigate through the hierarchy and evaluate the next alarms until the root-cause has been found

Fig. 5 depicts an exemplary third architecture of a third plant. A fourth alarm-area 129 is defined by a first diagram 130 of the plant. The first diagram 130 comprises exemplary several elements 132, 134, 136, 38 and 140. Such a diagram, which can be exemplary an HMI diagram might be presented to a use on a screen of a process visualization system for example. In the center of the diagram is a first element 132 situated, which might be a tank of a reactor. Associated to the tank and within its boundaries is a level display. A larger number of pipes respectively pipe segments is representing material connections from and to the tank.

For influencing the material flow through the connections several elements are foreseen, exemplary a second element 134, third element 136, fourth element 138, fifth element 40 and a sixth element 142. The elements are exemplary valves which can become opened, closed or brought in any partly opened state.

The plant comprising the fourth alarm-area is connected to the third computing-unit 120, which comprises a second database 122 with second alarm-data 124, second topology-data 126 and first rule-data 128. The second database 122 is connected to the processing unit.

Each of the elements 132, 134, 136, 138, 140 can exemplary generate at least one alarm-message. Within the alarm-area 129, the alarm-messages are exemplary evaluated for each alarm that appears. In case that only a single alarm-message appears it is directly shown to the operator. When more than one alarm appears within a certain predefined time span the topology according to the invented method is used to detect the first-up alarm.

Not depicted in the figure is, that the first diagram 130 might be an HMI diagram which can be available in a meta-language, so that additional information is derivable therefrom. A transfer of an HMI diagram into a computer readable form means preferably a transfer to a computer readable graphical form, so that methods of pattern or character recognition might become applied thereon. A"PDF" or "JPEG" file but also the description of an HMI diagram in a meta-language is typically already a suitable computer readable form, whereas for example a plot on a paper has to be transferred to a computer readable form by scanning them. During production process of a plant also a screenshot of an HMI diagram contains suitable information for generating model data of a plant and deriving the plant-topology thereof.

Not depicted in the figure is, that also constructional drawings might contain suitable information about the topology of a plant or a sub-part thereof.

Fig. 6 depicts an exemplary fifth architecture of a fifth plant. The fifth plant 170 comprises three different alarm-areas: a seventh alarm-area 172, eights alarm-area 174 and a ninth alarm area 176. Each of the alarm-areas 172, 174, 176 comprises at least one element. In this example the at least one element is a valve, wherein further elements are not depicted. In this example only the first-up alarms of the single alarm-areas are depicted. The valve of the seventh alarm-area 172 generates a fifth first up-alarm (Alarm 1 ), the valve of the eights alarm-area 174 generates a sixth first-up alarm 180 (Alarm 180) and the valve of the ninth alarm-area 176 generates a seventh first-up alarm 182 (Alarm 3). Exemplary each first-up alarm appeared one by one, but the time stamp might be the same. Hence, it is unknown which of the single first-up alarms appeared first.

In this example one of the alarm-areas 172, 174, 176 caused a first-up alarm which is propagated into another alarm area. The respective first-up alarm messages 178, 180, 82 are detected by the algorithms described above.

Again, the dependencies and flow directions between the alarm-areas is used to evaluate which alarm of the three first-up alarms 1 8, 180, 182 appeared earlier.

Fig. 7 shows a directed graph 191 comprising three different alarm-areas: a tenth alarm-area 190, an eleventh alarm-area 192, and a twelfth alarm-area 194, wherein each of the alarm-areas generates a respective first-up alarm: the tenth alarm-area 190 generates an eights first-up alarm 196 (alarm 1 ), the eleventh alarm-area 192 generates a ninth first up-alarm 198 (alarm 2) and the twelfth alarm-area 194 generates a tenth first-up alarm 200 (alarm). The directed graph 191 might represent the example depicted in Fig. 6, wherein the directed graph represents the architecture of the fifth plant, wherein the different alarm-messages (Alarm 1 , Alarm 2, Alarm 3) might be exemplary the same as in the previous figure 6. The directed graph 191 exemplary represents the dependencies between the different alarm- areas, based on the flow.

Fig. 8 depicts an exemplary alarm-hierarchy 210. The graph comprises exemplary a hierarchical structure with an eleventh first up-alarm 212, a twelfth first up-alarm 214 and a thirteenth first up-alarm 216. The graph might exemplary refer to the previous figures 6 and 7. The alarm-hierarchy is automatically rebuilt accordingly if only some of the plant-devices rise alarm-messages.

Fig. 9 depicts an exemplary sequence diagram illustrating the steps according to the present invention.

In a first step "a" alarm-data and topology-data are provided, wherein alarm-data describes the relation between the respective plant-devices and respective assigned alarm-area. The topology-data describes a directed graph comprising a connection with a related flow direction between the respective plant-devices of the respective assigned alarm-area.

In a second step "b" the alarm-messages are retrieved from plant-devices.

In a third step "c" the alarm-messages are associated with the respective alarm-area according to the alarm-data. The association to the alarm-areas is later used to find the first-up alarms inside those and to visualize dependencies between the groups. It might be also used to visualize dependencies between alarm-areas and stand-alone alarms.

In a fourth step "d" at least one partly complete first alarm-order of the alarm- messages of the at least one aiarm-area is generated by sorting the alarm-messages according to the flow direction of the directed graph and then assigning the sorted alarm-messages to the first alarm-order. The generated first alarm-order is instantaneously presented to the user via the display and the user is directed to the first-up alarm message so that a reaction of a user can advantageously delivered quickly.

In a fifth step "e" at least the first-up alarm-message of the first alarm-order is stored, exemplary on the database of the computing device, or in a database of the distribut- ed-control-system .

Fig. 10: depicts an exemplary tree structure 250 with nodes 252 and edges 254. The nodes 252 represent the plant-devices or the alarm-areas and the edges 254 represent the connections between nodes 252 and therefore between the plant-devices and/ or alarm-areas. Hence, the tree structure 250 represents a directed-graph which enables the detection of the root-cause, which is exemplary a first-up alarm.

In the depicted tree-structure, the node labeled "B" has two children, labeled "C" and "D", and one parent, labeled "A". The root node, labeled "A", which is situated on top of the tree-structure has no parent node. The arrows placed next to the edges symbolize the direction of the tree-structure.

The tree-structure as a data structure is a linked tree with a group of nodes, where each node might equal an alarm-area and a list of references to other nodes, exemplary its children. The data structure defines a directed graph as it may have several references to the same node, wherein only a corrupt linked list may have a loop. Thus, there might also be the requirement that each node has at most a single parent, except for the root node, and a tree that violates this might be a corrupt tree. Tree-structures can be advantageously implemented by references to the root node.

List of reference signs

First plant

First plant-device

Second plant-device

User

Input-device

User-input

First computing-unit

Display

Alarm-order Second plant

First alarm-area

Third plant-device

Fourth plant-device

First directed graph

First alarm-message

Second alarm-message

First database

First alarm-data

First topology-data

Second computing-unit First alarm-order

First first-up alarm-message

Third alarm-message 80 Third plant

82 Second alarm-area

84 Third alarm-area

86 Second directed graph

88 Third directed graph

90 Fourth directed graph

92 Second first-up alarm-message

94 Fourth first-up alarm-message

96 Fourth first-up alarm-message

98 Fourth alarm-message

100 Fifth alarm-message

102 Sixth alarm-message

104 Third alarm-order

106 Second alarm-order

108 Fourth alarm-order

120 Third computing-unit

122 Second database

124 Second alarm-data

126 Second topology-data

128 First rule-data

129 Fourth alarm-area

130 First diagram

132 First element

134 Second element

136 Third element

138 Fourth element

140 Fifth element

142 Sixth element

170 Fifth plant

172 Seventh alarm-area

174 Eights alarm-area

176 Ninth alarm-area 178 Fifth first up-alarm

180 Sixth first up-alarm

182 Seventh first up-alarm

190 Tenth alarm-area

191 Directed Graph

192 Eleventh alarm-area 194 Twelfth alarm-area

196 Eights first up-alarm

198 Ninth first up-alarm

200 Tenth first up-alarm

210 Alarm hierarchy

212 Eleventh first up-alarm

214 Twelfth first up-alarm

216 Thirtenth first up-alarm

250 Tree structure

252 Node

254 Edge