Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
REMOTE MOBILE OPERATION AND DIAGNOSTIC CENTER FOR FRAC SERVICES
Document Type and Number:
WIPO Patent Application WO/2015/184437
Kind Code:
A3
Abstract:
REMOTE MOBILE OPERATION AND DIAGNOSTIC CENTER FOR FRAC SERVICES [0046] A method for remotely controlling services to a well during hydraulic fracturing operations includes the steps of (a) generating a high pressure fluid and pumping the high pressure fluid into a subterranean geologic formation through a wellbore of a first well (30), the high pressure fluid being provided at a sufficient pressure to fracture the subterranean geologic formation: (b) performing a service on a second well (30), the second well being located within a pressure zone (32) defined around the first well and the second well; and (c) controlling the performance of the service from a remote operations hub (38). Step (a) and step (b) are performed simultaneously and step (c) is performed from the remote operations hub located outside of the pressure zone.

Inventors:
KAJARIA SAURABH (US)
CLIFTON JACOB (US)
Application Number:
PCT/US2015/033492
Publication Date:
January 28, 2016
Filing Date:
June 01, 2015
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
GE OIL & GAS PRESSURE CONTROL LP (US)
International Classes:
E21B43/26
Domestic Patent References:
WO1990003490A11990-04-05
WO2014197351A12014-12-11
Foreign References:
US20130233560A12013-09-12
US20110030963A12011-02-10
GB2233365A1991-01-09
Attorney, Agent or Firm:
DOMBROWSKI, Joanna M. et al. (Global Patent Operation3135 Easton Turnpik, Fairfield CT, US)
Download PDF: