Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
RESOURCE MANAGEMENT SYSTEM, RESOURCE MANAGEMENT METHOD AND RESOURCE MANAGEMENT PROGRAM
Document Type and Number:
WIPO Patent Application WO/2011/138854
Kind Code:
A1
Abstract:
Disclosed is a resource management system capable of calculating a safety ratio so that a resource amount for satisfying an SLA does not become excessive. An excess ratio calculation means (52) calculates an achievement ratio on the basis of a requested value related to quality and a data group of measured values for representing quality which has been measured in a system which is to satisfy an SLA, and subtracts a compliance ratio from the achievement ratio to calculate an excess ratio. A safety ratio derivation means (53) calculates an allocated resource amount for a system satisfying the condition that the excess ratio be 0 using the excess ratio, and calculates the safety ratio on the basis of the allocated resource amount and the used resource amount per unit time of the system in a steady state.

Inventors:
YAGI SHINJIRO (JP)
Application Number:
PCT/JP2011/002310
Publication Date:
November 10, 2011
Filing Date:
April 20, 2011
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
NEC CORP (JP)
YAGI SHINJIRO (JP)
International Classes:
G06F9/50
Foreign References:
JP2007133586A2007-05-31
JP2006277458A2006-10-12
JP2007048315A2007-02-22
Attorney, Agent or Firm:
IWAKABE, Fuyuki et al. (JP)
Fuyuki Iwakabe (JP)
Download PDF:
Claims: